Data Editing in a Common Internet Data Collection System Work Session on Statistical Data Editing 21-23 April 2008 Topic v: Editing of data acquired through.

Slides:



Advertisements
Similar presentations
Leveraging an Integrated ERP and CRM System - Featuring Sage MAS 500 ERP and Sage SalesLogix CRM.
Advertisements

StEPS at EIAWhere We Are Now Paula Weir and Sue Harris Energy Information Administration, U.S. Department of Energy ICES3 Topic Contributed Session: Generalized.
Michigan Electronic Grants System Plus
DIGIDOC A web based tool to Manage Documents. System Overview DigiDoc is a web-based customizable, integrated solution for Business Process Management.
1 of 61 EHBs v2.0 Overview Health Resources and Services Administration (HRSA) Presented To: Grantees EHBs version 2.0 – Overview for Grantees.
Practice Insight Instructional Webinar Series Eligibility Manager
1 H2 Cost Driver Map and Analysi s Table of Contents Cost Driver Map and Analysis 1. Context 2. Cost Driver Map 3. Cost Driver Analysis Appendix A - Replica.
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
CareCentrix Direct Training.
1 Vendor Reverse Auction - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines.
Brian A. Harris-Kojetin, Ph.D. Statistical and Science Policy
Solutions link-systems international student success WorldWideWhiteboard™ Software Developer’s Kit May 3, 2015.
OIRA / IT November 2014 Instructor Course Evaluation (ICE) Students’ Manual.
Introduction to Online Data Collection (OLDC) Community Based Abstinence Education September, 2009.
Viewing this Tutorial Use the ‘Down’ arrow on your keyboard, or left click your mouse, to move to the next point. Use the ‘Up’ arrow to go back. Use the.
Track, View, Manage and Report on all aspects of the Recruitment Process… with ease!
Chapter 19: Network Management Business Data Communications, 4e.
Procurement Card Training Strategic Account Management (SAM)
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2006 Microsoft Corporation.
Managing LOB Applications by Using System Center Operations Manager Published: March 2007.
LEVERAGING THE ENTERPRISE INFORMATION ENVIRONMENT Louise Edmonds Senior Manager Information Management ACT Health.
MSF Testing Introduction Functional Testing Performance Testing.
Overview of New Behind the Blackboard for Blackboard Customers APRIL 2012 TM.
Enterprise Architecture
Billing Agent. Pre-Application Checklist Introduction to IMPACT and Key Terms Application Process Starting an Application The Business Process Wizard.
SATERN for Supervisors May Session Objectives At the end of the session, participants will be able to:  Describe the benefits of SATERN.  Log.
1 Vendor RFI - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
MEGS+ Michigan Electronic Grants System Plus Office of Special Education May 2012.
ACRIN 6698 Diffusion-weighted MRI Biomarkers for Assessment of Breast Cancer Response to Neoadjuvant Treatment: An I-SPY 2 Trial Substudy Presented by:
1//hw Cherniak Software Development Corporation ARM Features Presentation Alacrity Results Management (ARM) Major Feature Description.
TESTING STRATEGY Requires a focus because there are many possible test areas and different types of testing available for each one of those areas. Because.
AFISS, ◊ Tel: (519) ◊ ◊ ◊ Web: ◊
NetService Cardholder Tutorial GE Corporate Payment Services 4246 South Riverboat Road Salt Lake City, Utah Copyright Information.
Web Services (Part 1) Service-Oriented Architecture Overview ITEC 625 Web Development Fall 2006 Reference: Web Services and Service-Oriented Architectures.
Where Innovation Is Tradition SYST699 – Spec Innovations Innoslate™ System Engineering Management Software Tool Test & Analysis.
Output and User Interface Design
T. Rowe Price, Invest With Confidence and the Bighorn Sheep logo is a registered trademark of T. Rowe Price Group, Inc. Please dial from.
OCAN College Access Program Data Submissions Vonetta Woods HEI Analyst, Ohio Board of Regents
Introduction to eziLink Training For the Ministry of Forests and Sustainable Resource Management.
Lead Management Tool Partner User Guide March 15, 2013
A Web Based Workorder Management System for California Schools.
ECPIC Quick Guide: eCPIC-ITDB Interactions Purpose: The eCPIC-ITDB Interactions Quick Guide has been developed to provide a high-level, informational overview.
0 eCPIC User Training: Resource Library These training materials are owned by the Federal Government. They can be used or modified only by FESCOM member.
1 Improving Data Quality. COURSE DESCRIPTION Introduction to Data Quality- Course Outline.
PearsonAccess April 14, PearsonAccess – Agenda Order Tracking Additional Orders Student Data Upload (SDU) files New Student Wizard Online Testing.
Session Session 15 FAFSA on the Web - Onward and Upward!
Copyright 2010, The World Bank Group. All Rights Reserved. Reducing Non-Response Section B 1.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
Statewide Financial System Program 1 Commitment Control (KK): Refresher Training Key Points Commitment Control (KK): Refresher Training Key Points Welcome.
Early Childhood Outcomes Indicator 7 Data Collection Application Review.
FY 2011 Public Libraries Survey WebPLUS Software Training.
Knowledge Management Platform Communities of Practice User Guide for CoP users Copyright © 2010 Group Technology Solutions. All Rights Reserved.
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
Process Manager. What is the Process Manager? Online customized workflow system Tool that allows customized document tracking and storage Hosted ASP Solution.
United Nations Oslo City Group on Energy Statistics OG7, Helsinki, Finland October 2012 ESCM Chapter 8: Data Quality and Meta Data 1.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Creating & Building the Web Site Week 8. Objectives Planning web site development Initiation of the project Analysis for web site development Designing.
Welcome to State of Michigan Central Finance Advance Approval & Modification & Modification Tutorial Brought to you by the Office of Financial Management.
HEI/OCAN College Access Program Data Submissions.
Public Libraries Survey Data File Overview. What We’ll Talk About PLS: Public Libraries Survey State level data Public library data (Administrative Entities)
Public Libraries Survey Data File Overview. 2 What We’ll Talk About PLS: Public Library Survey State level data Public library data (Administrative Entities)
Topic (i): Editing nearer the source Work Session on Statistical Data Editing Vienna, Austria April 2008.
Managing Multi Mode Collection Instruments in the 2011 UK Census Frank Nolan, Heather Wagstaff, Ruth Wallis Office for National Statistics UK.
Dr Jane Tonge Senior Examiner
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Michigan Electronic Grants System Plus
Administrator Training
Electronic Products Workshop Division of Air Resource Management -DEP
Data collection with Internet
Presentation transcript:

Data Editing in a Common Internet Data Collection System Work Session on Statistical Data Editing April 2008 Topic v: Editing of data acquired through electronic data collection WP 3

Overview Functional requirements for an enterprise-wide IDC Vision Three part focus Three functional areas and related principles Interviews and literature search High level recommendations Detailed functional requirements on “front end” editing ISMS Authoring tool Rendered form and reporting Current ISMS status and conclusion

Background & Vision Multiple IDCs at EIA Strategic Plan initiative for a common Internet-based data collection system Interoffice team was formed to get an agency-wide perspective and buy-in Vision: versatile and flexible, integrated collection framework inclusive of authoring tools

Three Part Focus The work focused on three parts: 1) The development of IDC “principles” 2) The research to determine the best practices and approaches relevant to these EIA principles 3) The detailed key requirements for a successful application at EIA What is required not how to satisfy those requirements

Principles & Dimensions IDC Team’s work first centered on the development of IDC “principles” Principles are generalizations which were accepted and used as the basis for reasoning These principles represented three views— the respondent’s, the survey program, and the EIA corporate Important characteristics were then agreed upon from each of the view points

Respondent Point-of-View Ease of access and use; 24-7 access Ready and useful help and prompt support Ability to easily report large amounts of data Reduced burden compared to other modes Confidentiality protection Ability to interrupt and complete surveys later, save/print/forward, finalize, and transmit information in both directions Other incentives for respondents (What’s in it for me?/”first results”)

Survey Program Point-of-View Reductions in cycle time, and costs associated with data entry, mailing, and editing follow-up A specific survey instrument application that makes use of shared infrastructure Instrument design and flexibility Ability to directly add/delete/modify surveys by the program office Flexibility and ease of changing/modifying survey definitions, instructions, forms, respondent sets or other metadata directly by program offices

Survey Program Point-of-View Reduced reporting errors by editing at data capture; ease and flexibility of adding/modifying and resolving edits and monitoring edit performance Ability to process resubmission/revisions Respondent case and survey management Ability to measure process performance real time Ease of integration and synchronization with other reporting modes and systems

EIA Corporate Point of View A centralized platform Shared architecture and infrastructure One entry point Common look and feel Security (for EIA) Support multiple surveys 508 compliant Life cycle records’ management

Research: Visits to Statistical Agencies and Main Finding 11 broad questions Visits: BLS, Census, NASS, Westat/Blaise, EIA Main finding--three approaches: 1) fully centralized, limited flexibility 2) centralized core structure w/survey flexibility and/or control 3) fully de-centralized

Visits to Statistical Agencies and Literature Search—Other Findings Other findings: Little evidence of cost savings; evidence of higher quality data; implementations are few; take-up is low; help support underestimated; organizational culture and buy-in is critical The highlighted best practice in the literature search was usability testing

Recommendations: Overview Recommend: Follow 4 basic guiding rules supported by detailed requirements. The IDC: 1) is designed so that it is easy to implement, modify, or migrate a survey to the IDC 2) provides tools enabling the survey group to have ownership of their survey application 3) provides value added from the respondent’s perspective (answers “What is in it for me?) 4) promotes high quality data through editing features, user notifications, clear navigation, etc

Detailed Key Functional Requirements Framework for developers to construct a design document for EIA’s next generation of internet data collection The focus on what is required not how to satisfy those requirements. Detailed requirements by ten categorizies Categories most related to editing: Graphical User Interface (single sign-on, common look and feel, and functionality), Front-end editing, User notification, Performance measures

Data Collection (GUI - Common Look and Feel & Functionality) Users have a common authentication and authorization approach; enroll once and further survey access is automated Elements have a common look and feel-- respondents will not have to relearn, and will always know they are on an EIA site Survey manager chooses what to use but uses the common look if item is chosen

Data Collection (GUI - Common Look and Feel & Functionality) The SUBMIT button invokes a final verification of unedited or unresolved fields Edit failures displayed with links to the failed item Respondents may import data into the IDC Editing still performed if data imported If the data pass all edits or all hard edit failures have been resolved, the data are sent to EIA

Data Collection (“Front End” Editing) Prevent errors through drop downs Provide capability for “hard” edits for defined fields —must correct (ex: numeric, integer, field length, required field) Provide capability for other “hard” edits defined by survey —must correct or comment Provide capability for “soft” edits —can correct, comment or bypass

Data Collection (“Front End” Editing) Provide capability for various types of edits: within cell, cell-to-cell within form, cell-to-cell historic, cell-to-cell other forms/surveys Provide ability to implement edit rules that include consistency, range, comparisons, etc., that may involve calculations and/or parameters that can easily be modified by survey managers

Data Collection (“Front End” Editing) Survey managers create edit failure messages using best practices guidance All navigation objects first save all fields on the current screen, edit appropriate fields and display messages regarding user action before displaying the next screen Edit failures displayed with links to the failed item Submissions with data that pass all edits or have resolved hard edit failures are sent to EIA

Data Collection (User Notification) Provide dual notification that submission received by EIA—on-screen at submission, follow-up Provide non-response notification: no submission when expected, submission insufficient Provide to targeted sub-groups Provide notification of data not saved/submitted if browser closed prior to that action.

Performance Measures Measures about the Survey 1) Response Measures 2) Edit Failure & Correction/Bypass Measures 3) Corrections/Resubmissions Measures Measures about the Collection Mode 1) Access counts (respondents and internal) 2) Change in respondent burden, respondent evaluation/usability, support costs, number of registered users Measures on Contribution of IDC Mode to Overall Survey Product Performance 1) Comparison of: cost per respondent, costs to other modes, response rates to other modes, “back-end” edit failure/call back/corrections to other modes, contribution to meeting/exceeding dissemination deadlines

The Authoring Tool… Provides the common look and feel Provides the ability to easily implement, modify, or migrate a survey to the internet collection Provides the ability for the survey group to have ownership of their survey application Provides a standard set of parameter driven editing features to promote high quality data

Internet Survey Management System (ISMS): Authoring Tool

ISMS Authoring Tool Step to Define Edit—Element Specific

ISMS Authoring Tool Step to Define Edits—Element Specific

ISMS Authoring Tool Step to Define Edits—Inter-element

Types of Edit Rules for ISMS

ISMS Rendered Survey Form

ISMS Rendered Survey Form—Edit Warning Message

Expected Benefits Key benefits expected for all three view points:  Customers: ease of access and use; 24-7; data import; one look and feel; incentive--get something back  Survey programs: Reduced collection and processing costs, control and flexibility over survey elements and structure without responsibility for infrastructure; higher quality data through the editing function  Corporate: A centralized platform, shared architecture and infrastructure to reduce development and maintenance costs; consistency in process across the organization

Conclusion EIA is developing the ISMS inclusive of a custom authoring tool to provide both a common look and feel and survey flexibility The authoring tool provides ease in implementing common edits Usability testing on rendered forms with internal users and respondents to be performed soon Implementation of the first survey expected next month Development has been critical path based Other features specified in the requirements will be implemented in later versions