Change Management Board Meeting V Kuchler 23 January, 2015.

Slides:



Advertisements
Similar presentations
Kitakami IR Access Discussions T. Markiewicz/SLAC 13 May 2014 SiD Meeting / AWLC Fermilab.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
IV&V of Critical Behavior September, 2012 Shirley Savarino, TASC.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Dr. L. K. Gaafar The American University in Cairo
Course Technology Chapter 3: Project Integration Management.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Request for Waiver from Accessibility Requirements of Chapter 553, Florida Statutes Picerne Storage Building Annex.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Copyright Course Technology 1999
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
BUS 4017 HR Project Management Week 10 Presented by Professor Fred Pentney.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Member Timesheets. Agenda OnCorps Paper Documentation & Verification Why timesheets are important – and what the OIG has to say Putting Timesheet systems/processes.
B. List, Design Integration and Configuration Management Design Integration and Configuration Management Benno List DESY
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
More than an idea not yet a project 1 Meeting Issues & Goals CFS-ADI Tokyo 2014 Mike Harrison.
Compressor status AWAKE Technical Board meeting 19 August 2015.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Report from ILC CFS and Cryogenics Workshop
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Project Management Basics
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
Project Breakdown Structure Tracing changes to our different baselines I. Bejar Alonso and Project Office TCC – 14 th January 2016.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
7 Management of Physical and Fiscal Resources Unit 7.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Updated Design of Detector Hall
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
Tom Lackowski Revised 10/12/2011
Delivery of Solutions Information Management
Overview of Day One – 29 Feb 2016
White Flint North Entrance Feasibility Study
Presentation transcript:

Change Management Board Meeting V Kuchler 23 January, 2015

Overview Current StatusCurrent Status General Outlook for Team DiscussionGeneral Outlook for Team Discussion Change Management Board 23 January 20152

CR-3 Implementation Plan Implementation Team Named by CMBImplementation Team Named by CMB  V Kuchler, K Buesser, T Markewicz, M Miyahara, J List,B List, There are Complicating FactorsThere are Complicating Factors  TDR Contains Existing Drawings, Text and Cost Estimates  The Scope of CR-3 Includes a Change in the Detector Hall Design and Access as Well as a Change of Location  The Site has not yet Been “Officially Selected” by the Japanese Government as the Host Site  The Current Design will be Subject to More Changes Before a Complete Site Specific Design is Completed  The Change in the Detector Hall Location Will Affect One of More of the Horizontal Access Entry Locations and Overall Tunnel Lengths  How to Properly Document the Effect of the Approved Change is the Challenge at Hand Change Management Board 23 January 20153

CR-3 Implementation Plan cont. There has not yet Been a Formal Meeting Due to the Holiday SeasonThere has not yet Been a Formal Meeting Due to the Holiday Season Several Members of the CIT did Attend the SiD Collaboration/MDI Meeting Last Week at SLACSeveral Members of the CIT did Attend the SiD Collaboration/MDI Meeting Last Week at SLAC Discussion Identified Several Issues (some detector oriented and some CFS)Discussion Identified Several Issues (some detector oriented and some CFS) o Verify Optimal Height of Detector Hall o Conceptual Design for PACMAN to Insure Adequacy of 40TCrane o Verify Height of Crane Bridge over Beamline (50 G at 18 M) o Review Using 18 M Shaft for Utilities o Determine Access Requirements for Personnel Access o Requirements for Surface Workshops o Develop Layout for QF1 at Tunnel Entrance w/r to PACMAN o Specify Truck Routes Into Assembly Building at Surface o Study Requirements for Site Office Space vs Central Campus Change Management Board 23 January 20154

Change Management Board 23 January 20155

Change Management Board 23 January 20156

Change Management Board 23 January 20157

Change Management Board 23 January 20158

CR-3 Implementation Plan cont. The Focus will be to Limit the Effort to the Detector Hall Area and Affected Horizontal Access TunnelsThe Focus will be to Limit the Effort to the Detector Hall Area and Affected Horizontal Access Tunnels B List has Put Together a List of Affected Existing DocumentsB List has Put Together a List of Affected Existing Documents These will Be Reviewed and an Evaluation of the Scope and Resources Needed will be DevelopedThese will Be Reviewed and an Evaluation of the Scope and Resources Needed will be Developed This is the First Change Request that has been Approved So We are Developing a ProcessThis is the First Change Request that has been Approved So We are Developing a Process A Method to Capture the Correct Amount of Documentation in EDMS will be DevelopedA Method to Capture the Correct Amount of Documentation in EDMS will be Developed Change Management Board 23 January 20159