Capacity Methodology Statements Transmission Workstream 5 th July 2007.

Slides:



Advertisements
Similar presentations
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Advertisements

Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Entry Capacity Substitution Transmission Workstream – 6 th August 2009.
Exit Reform Review Transmission Workstream 07 January 2010.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Transfer & Trades Special Transmission Workstream
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Entry Capacity Substitution Workshop 6 – 7 th January 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Entry Capacity transfers in the constrained period Transmission Workstream 5 th October 2006.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
Transfers and Trades Special Transmission Workstream
European Developments Transmission Workgroup 3 rd May 2012.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Exit Capacity Release Methodology Statement
Transmission Planning Code – Draft Document
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Workgroup 4th October 2012
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
Capacity Methodology Statements
Annual Review - Methodology Statements
Exit Capacity Substitution and Revision
Update on Exit Capacity Substitution and Revision
Development of Entry Capacity Substitution
QSEC auction timetable
Entry Capacity Substitution
Transmission Workstream – Partial Assignment
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Entry Capacity Transfer and Trade
Transmission Workstream – 6th July 2005
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
Transmission Workstream 1st February 2007
IECR Incremental Step Size
Incremental Entry Capacity Release Methodology Statement
Modification 0043 – Limitation on offering for sale unsold capacity
Entry Capacity Transfers - Constrained Period
Presentation transcript:

Capacity Methodology Statements Transmission Workstream 5 th July 2007

Capacity Methodology Statements Constrained Period Unconstrained Entry Entry Capacity Transfer and Trade Methodology Statement Entry Capacity Substitution Methodology Statement Incremental Entry Capacity Release Methodology Statement Exit Exit Capacity Baseline Revision Methodology Statement Exit Capacity Release Methodology Statement (Interim & Enduring)

Methodology Statement – Timetable Statement Consultation start Consultation end Comment Capacity Transfer and Trade 2 nd May30 th May Under review Incremental Entry Capacity Release 16 th May5 th June With Ofgem Entry Capacity Substitution 18 th May15 th June See later slides Exit Capacity Release (Interim) 16 th May13 th June With Ofgem Exit Capacity Release (Enduring) TBC Linked to implementation of mod 116A Exit Capacity Baseline Revision TBC Applies to Enduring Exit regime

Consultation on the proposed Entry Capacity Substitution Methodology Statement Key concerns expressed:  Loss of capacity at the donor ASEP  Makes new projects expecting to use “spare” capacity less viable. Impact on Security of Supply.  Storage contracts are generally of short duration. User unable to signal long term requirements to prevent capacity being substituted away.  May lead to inefficient investment decision as Users bid to protect capacity normally obtained short-term.  Loss of Total Capacity  Generally a limit on exchange rates preferred.  Most respondent unable to specify a precise rate, but 1:1 and 1.5:1 suggested.

Consultation on the proposed Entry Capacity Substitution Methodology Statement Key concerns expressed:  Scope of Substitutions.  Capacity substitutions limited to within zone to reserve capacity for within zone transfers and trades.  Substitutions should be applied to incremental requests irrespective of whether the NPV test is passed.  Adverse impact on short-term markets.  Concern that proposals may have an adverse impact of availability of NTS exit capacity, particularly flexibility capacity.

Consultation on the proposed Entry Capacity Substitution Methodology Statement Key concerns expressed:  Comments on Detail of Proposed Process  Use of lowest revenue driver to identify recipient ASEP  Should the process aim to avoid “material” or “incremental” risk?  Exchanges should be assessed against “peak” flow analysis.  Definition of zones – storage ASEPs should be separate from non-storage.