# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead

Slides:



Advertisements
Similar presentations
DAIMI(c) Henrik Bærbak Christensen1 Software Architecture Quality Attributes.
Advertisements

“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Knoxville, TN Oct. 19, 2009 AMI-Enterprise Systems Requirements Specification Overview.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
Software Engineering Institute Carnegie Mellon University Pittsburgh, PA Sponsored by the U.S. Department of Defense © 1998 by Carnegie Mellon.
For OpenSG Discussion: Preliminary SG-Enterprise Charter Greg Robinson, Co-Chair, SG-Enterprise Wayne Longcore, Chair, SG-Enterprise.
Software Architecture for DSD DSD Team. Overview What is software architecture and why is it so important? The role of architecture in determining system.
OpenFMB Specification Development Plan
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
Prepared by: Gerald R. Gray, Guiding Principle Consulting.
MTEI Methods & Tools for Enterprise Integration
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
Quality Assurance ITEC Rick Price. Expectations This course is not purely a lecture course – Classroom participation is a large portion – Everyone.
Requirements specification Copyright, 2001 © Jerzy R. Nawrocki Quality Management.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
Project CIM Test Development Process John Simmins Weekly Status and Planning Meeting 2/1/2011.
CIM and UML Overview Terry Saxton Xtensible Solutions
Architecture Business Cycle
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Status Report (Palo Alto, Jan. 09) Joe Zhou.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group Overview & Plans For further information, contact Wayne Longcore Chairman of AMI-Ent TF.
SOFTWARE SYSTEMS DEVELOPMENT 4: System Design. Simplified view on software product development process 2 Product Planning System Design Project Planning.
Lecture 7: Requirements Engineering
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Public Health Reporting Initiative Stage 3 Sprint: Implementation Guide Development Phone: x
CS 4850: Senior Project Fall 2014 Object-Oriented Design.
1 15 quality goals for requirements  Justified  Correct  Complete  Consistent  Unambiguous  Feasible  Abstract  Traceable  Delimited  Interfaced.
AMI Enterprise Developing Interoperability for Distribution Systems January 2009 Terry Mohn, Technology Strategist SDG&E Vice Chairman, GridWise Alliance.
Health eDecisions Use Case 2: CDS Guidance Service Strawman of Core Concepts Use Case 2 1.
SG Systems - Service Definition Team Chair: Gerald Gray, Guiding Principle Consulting Co-Chair: Shawn Hu, Xtensible Solutions.
Dec UtilityAMI OpenHAN TF Requirements Working Group Specification Briefing January 2008.
CONTENTS OF THE SRS REPORT. Software Requirements Specification (SRS) template The SRS document describes recommended approaches for the specification.
Service Definitions A Framework For Standard Interface Development.
# 1 Application Integration Architecture A Framework For Standard Interface Development Gerald R. Gray, Consumers EnergyJune 23, 2008.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
IEC TC57 Smart Grid Activities Scott Neumann USNC TA IEC TC57 November 6, 2009.
Requirement Engineering. Recap Elaboration Behavioral Modeling State Diagram Sequence Diagram Negotiation.
1 Software Architecture in Practice Quality attributes (The amputated version)
CSE 303 – Software Design and Architecture
Preparatory Groundwork For facilitators of a community assessment Programme Identify subject area Decide on date, time and place Decide on tools Identify.
IEC TC57 Smart Grid Task Force Ed Dobrowolski for Scott Neumann 16 June 2010.
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
Focus on design principles and on a process for doing design = To produce a precise, complete, high- quality foundation for product implementation.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
1 Advanced Software Architecture Muhammad Bilal Bashir PhD Scholar (Computer Science) Mohammad Ali Jinnah University.
ARCH-04 Before You Begin Your Transformation Project… Phillip Magnay Architect – Applied Technology.
Managers Guide to AMI Enterprise. AMI Enterprise What it is Why you need to be involved How you get involved Who from your organization needs to be involved.
June California Investor Owned Utilities (IOU) HAN vision statement development 15 June 2007.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
CSIS 4850: CS Senior Project – Spring 2009 CSIS 4850: Senior Project Spring 2009 Object-Oriented Design.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
CIM User Group Overview Terry Saxton Vendor Co-Chair Open Smart Grid AMI-Ent Task Force Meeting July 14, 2009.
CIMug Focus Communities Address: A high-priority need Where wide input is needed: Utilities Vendors Universities IEC WG experts Fast tracks updates into.
SQA project process standards IEEE software engineering standards
Software Quality Control and Quality Assurance: Introduction
AMI Enterprise Task Force of the Utility AMI Working Group
SQA project process standards IEEE software engineering standards
Physical Data Model – step-by-step instructions and template
Software Quality Assurance Software Quality Factor
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
The Open Group Architecture Framework (TOGAF)
“SG-Systems” (Smart Grid – Operational Applications Integration) Meeting Agenda Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
CIGRE D2.24 Information Architecture ** where CIM fits in **
IEC TC57 Smart Grid Activities
Presentation transcript:

# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead

# 2 AMI Enterprise Task Force Use Case Team System Requirements Articulation Service Definitions Team SCE (Use Cases) IEC TC57 WG14, Other Standards Organizations EPRI HomePlug & ZigBee Integration Requirements Patterns Sequence Diagram Services WSDL Business-Oriented, Common Format Use Cases Recommendations to IEC TC57 WG14: CIM Extensions Message Type Updates System Reqmt Updates MultiSpeak

# 3 SRS Team Goal: Generate System Requirements Specification (SRS) Team Leader: Joe Zhou –Similar scope and coverage as SRS created by Utility AMI WG’s OpenHAN TF. Include the following topics: A discussion of the reasons the Utility members of the AMI-Ent will undertake this work –Includes a glossary of terms Guiding Principles and the System Architecture –Includes an assessment of the IEC61968 Interface Reference Model (IRM) as a means for organizing information exchange requirements among utility business functions. A list system requirements not necessarily covered by business use cases. –This document would lay the foundation on which independent use cases and services would be defined. First Step: Assess IEC standards to determine gaps between the standard and what is needed for AMI- Enterprise scope. Make recommendations to fill gaps.

# 4 Software architecture is a result of technical, business, and social influences. The existence of the software architecture in turn affects the technical, business, and social environments that subsequently influence future architectures. Architecture stakeholders are: –Customer –End user –Sales and marketing –Competitor/Market –Development organization –Maintenance There is no such thing as an inherently good or bad architecture. Architectures are either more or less fit for some stated purposes. What is Software Architecture? Source: Software Architecture in Practice

# 5 System quality attributes discernable at runtime –Performance, Security, Availability, Functionality, Usability, Scalability System quality attributes NOT discernable at runtime –Modifiability, Portability, Reusability, Integrability, Testability Business Qualities –Time to market; Cost; Projected life time of the system; Targeted market; Rollout schedule; Extensive use of legacy system Qualities directly related to the architecture –Conceptual integrity; Correctness and completeness; Buildability Architecture Quality Attributes – Design Criteria Source: Software Architecture in Practice

# 6 GridWise Interoperability Context-Setting Framework

# 7 AMI-Ent SRS AMI-Ent SRS is a system requirements specification for how GridWise Interoperability Context-Setting Framework can be applied for AMI enterprise integration using well defined architectural practice. SRS Table of Content –Introduction –Guiding Principals –Architecture Considerations –AMI-Ent Functions and Logical Systems –AMI-Ent Requirements Refer to integration requirements from the Service Definition Team Develop a list of requirements that are not covered by the above –AMI-Ent Glossary of terms and definitions

# 8 AMI-Ent SRS Next Steps 1.Develop and agree on the initial scope (Table of Content) 2.Develop the following: (things are needed for other teams right away)  Glossary of terms and definitions  Guiding principals  AMI-Ent functional and logical systems model (leverage IEC 61968) 3.Develop AMI-Ent requirements  Address GridWise Interoperability Framework component as they apply to AMI-Ent  Address the rest of architectural requirements not covered by the Framework  Refer to other standards where they apply, identify gaps where exist. 4.Develop, review and finalize AMI-Ent SRS document for public comment