1 Low Voltage Power Supplies for ALICE TB 22.09.04 L.Jirden u Target devices (reminder) u Market Survey and Tender u Actions.

Slides:



Advertisements
Similar presentations
André Augustinus 5 March 2007 Infrastructure status.
Advertisements

Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
F. Formenti - ALICE forum 16/03/ Contacted some teams for system GND discussions: cases analyzed are presented here Planned to continue with others.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Electronic Systems Support LV PS Procurement - Status February 28, 2005.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
Rainer Renfordt IKF Frankfurt TPC meeting 10/11December GSI Low Voltage System for the Alice TPC " Test of Wiener PL500 supply " Alternative scenario:
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
Niels Tuning (1/9) LV status. Outline 1)Preventive maintenance  Fan replacement 2)Power supplies:  Clogged cooling water circuit  Water damage 3)Next.
Jan B.Allongue1 WIENER “MARATON” POWER SUPPLY TESTS Introduction. Magnetic field tests. Plans for radiation and electrical tests. Conclusion.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Siena, Oct th Topical Seminar on Innovative Particle and Radiation Detectors: Progress in Radiation and Magnetic Field tests of CAEN HV and.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Recall: u target devices & possible solutions u Outstanding actions.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
FF - August 30th 2004 Meeting ALICE radiation tolerance. Some reasons for this meeting: A part very inner detectors (Pixels and SDD), ALICE has wide grey.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
1 LV Power Supplies L.Jirden* u Detector solutions u Contracts u Tests u Outstanding issues *Presented by André Augustinus.
1 Low Voltage Power Supplies for ALICE ALICE week June 04 L.Jirden u Detector requirements u Target Devices u Procurement u Actions.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
FP420 Low voltage supply Henning E. Larsen, INFN and Risoe 19. May 2006.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
18/6/03GS/ALICE Forum1 LVPS - Grounding Meeting of LVPS TF on Tuesday 17/6 Overview of TPC, TRD and TOF subsystem with F. Szoncso/TIS-GS Review of subsystems.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Colmar, 9-13 Sept. 2002LECC th Workshop on Electronics for LHC Experiments: Progress in Radiation and Magnetic Field tests of CAEN HV and LV boards.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
L.Jirden + J.P. Vanuxem TB VME crates in ALICE (reviewed) u Most detectors (16) need VME crates: u Total 62 crates; 52 for UX, 8 for CR, 2 for.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
1 Radiation worries in the cavern L.Jirdén
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
Low Voltage Power Supplies: towards design specifications Henryk Palka, IFJ PAN Krakow (for WP team: Krakow, Prague, KEK) DEPFET-Belle Meeting Karlsruhe,
(Alice COsmic Ray Detector) Status Report
2500 Series® Compact System Components
TS2 preparatory meeting
M. Hansen, CERN S. Lusin, CMS TC / UW
PMD PMD Plans Detector Issues and solution Plans for LS1 29 June 2012.
Evaluation and testing of advanced low-voltage power supplies
TPC Detector Control System
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Presentation transcript:

1 Low Voltage Power Supplies for ALICE TB L.Jirden u Target devices (reminder) u Market Survey and Tender u Actions

2 Target devices u Wiener u Marathon; compact version u Marathon; split version u Caen u SY1527 mainframe with LV modules u Easy system u Sasy system u Arem Pro

3 Wiener Marathon UX CR PFC AC/DC Digital control Power modules 230 VAC CANbus Water cooling Compact version: B-tol: 300 gauss Rad tol: test planned DC/DC Analog control Power modules 230 VAC CANbus PFC AC/DC Digital control 380 VDC B-shield Split version: B-tol: 1200 gauss Rad tolerant Targeted by: TPC, TRD, MTK, MTG, etc

4 Caen SY1527 system SY1527 main- frame ethernet B-tol: 50 gauss (?) – test required Rad tol: ? – test required LV modules Targeted by: SSDUX

5 CR Caen EASY system no cooling 230 VAC CANbus Power supply 48 VDC DC/DC Digital control Digital control Digital control SY1527 main- frame ethernet Branch controller EASY B-tol: 1000 gauss CRATE Rad tol – test planned B-tol: 50 gauss (?) Rad tol: ? Targeted by: T0, V0, etc

6 UX Caen SASY system no cooling 230 VAC CANbus Power supply 48 VDC DC/DC Digital control Digital control Digital control SY1527 main- frame ethernet Branch controller SASY B-tol: 5000 gauss CRATE Rad tol: tested ok B-tol: 50 gauss (?) – test! Rad tol: ? – test! Targeted by: TOF on detector

7 UX CR Arem Pro PS 230 VACRS232 AC/DC power AC/DC power AC/DC power module control module control crate control ethernet B-tol: ? – test planned Rad tol: tested, result? no cooling Targeted by: SDD

8 Market survey & Tender u Market survey u sent July – answer deadline end August u 21 answers u 5 companies qualified u Tender planning u Out by end September 04 u Answers end November 04 u Contract end January 05 u Technical Specification u Draft exist u Environmental considerations; limits to be fixed; u Normal environment u Low-level B-fields only u Radiation effects only u High-level B-field and radiation effects u Modularity: size of modules/channels to be specified u ALICE needs spans from 3.6A (SSD) to 250A (TPC) u Controls requirements to be fixed u Remote control of voltages? u Remote power on/off? u Performance

9 Actions u Finalize technical specification & launch tender – feedback from detectors needed u Tests of LVPS u Wiener compact version for low level radiation - ESS u Caen SY1527 for low level radiation and B-field – SSD u Caen Sasy mainframe + 48V PS for low level radiation and B-field - TOF u Caen Easy crate for radiation and B-field - ESS u Arem Pro for radiation and B-field - SDD