CONDITIONS RIPE FOR BPR (HAMMER STYLE) Unarticulated/out-of-date rules Not right first time Sequential process Lack of focal point of responsibility Worker.

Slides:



Advertisements
Similar presentations
Project management Information systems for management1 Project Management.
Advertisements

Facilitated by Joanne Fraser RiverSystems
1 © 1999 Deloitte Consulting Infrastructure Sub-processes In Scope – Plan and Manage Business.
Course: e-Governance Project Lifecycle Day 1
Phase 6: Implementing Sumber Kepustakaan : gunston.gmu.edu/ecommerce/mba731/doc/BP R_all_Part_I.ppt 1 Plan IT implementation Plan organization implementation.
Lecture 2 Title: PLC, SDLC, PMBOK
Global Business Blueprint Summary Presenters: Laurie Dempsey, CBP Lois McCluskey, eCP January 28, 2004.
Planning for Enterprise Systems
Singapore Tradenet A Tale of One City.
Change Acceptance Process
EC Strategy, Globalization, and SMEs
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
Improving Your Business Results Six Sigma Qualtec Six Sigma Qualtec Six Sigma Qualtec – All Rights Reserved June 26, 2002 BEYOND SIX SIGMA: A HOLISTIC.
How Process Enterprises Really Work by Michael Hammer and Steven Stanton Presented by Jeff Schott CS457 Fall 2005 Harvard Business Review, November-December.
Business Process Reengineering & Innovation Jason Chen School of Business Administration Gonzaga University Spokane, WA 99223
© 2007 EPK Group, LLC. All Rights Reserved. Fast Track ROI For Portfolio, Project, And Resource Management Rich Murphy Founding Partner EPK Group LLC.
HRM 601 Organizational Behavior Session 6 Motivational Applications.
Change is a Process Organizational Stages Individual Stages (ADKAR) Business Need Concept and Design Implementation Post-Implementation Awareness Desire.
Chapter 3: The Project Management Process Groups
Chapter 16 Strategically Managing the HRM Function Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without.
System Analysis System Analysis - Mr. Ahmad Al-Ghoul System Analysis and Design.
Managing Project Risk.
Organization Development and Change
Assessing Your Organizational Span of Control State Classification Office, September 2003.
The Library Balanced Scorecard: The Results Please! Joe Matthews American Library Association June 2007.
Y. Rong June 2008 Modified in Feb  Industrial leaders  Initiation of a project (any project)  Innovative way to do: NABC ◦ Need analysis ◦ Approach.
JOB CHARACTERISTICS BUILDING JOBS PEOPLE WANT Module 2.
Virtual teams These are teams that work together and solve problems through computer-based interactions. What are some benefits? Drawbacks? They save time,
ATTRACT – ACQUIRE – RETAIN – DEVELOP - DEPLOY JOB CHARACTERISTICS BUILDING JOBS PEOPLE WANT Module 2.
Identification, Analysis and Management
What is Business Analysis Planning & Monitoring?
CHAPTER 4 The strategic Planning function รศ. ดร. เสรี วงษ์มณฑา.
New England Regional Colloquium Series “Systems of State Support” B. Keith Speers January 24, 2007.
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 3 Project Management for Strategic Goal Achievement.
Simplified Strategic Planning Taking Control, Involving Employees & Linking Systems Joseph Raible Senior Consultant 1The Millennium Group International,
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
1 Becoming an Effective Board Member The Heartland Conference April 9, 2008.
1. 2 Business Process Reengineering (BPR) “the fundamental rethinking and redesign of processes to achieve dramatic improvements in critical, contemporary.
Module 4: Systems Development Chapter 12: (IS) Project Management.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
IPMA Executive Conference Value of IT September 22, 2005.
What is a Process? A logically related set of tasks performed to achieve a defined business outcome. A structured, measured set of activities designed.
Applying Business Process Re-engineering
HRM 601 Organizational Behavior Session 14 Organizational Change & Development.
Ch 4 - Learning Objectives Scope Management You should be able to: n Discuss the relationship between scope and project failure n Describe how strategic.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Welcome to Session 3 – Project Management Process Overview
Chapter 14: Using the Scalable Decision Process on Large Projects The process outlined is meant to be scaleable. Individual steps can be removed, changed,
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Performance Consulting EDER Instructor: Tony Roithmayr Introducing Blended Learning into Higher Education Rosalie Pedersen, Kenneth Kim, Elaine.
7-1 McGraw-Hill/Irwin Operations Strategy Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. Business Process- Focused Strategies and.
System Model of HRM System composed of interrelated & interacting parts to achieve desired goals System approach to HRM combines itself with business strategy.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Introduction to Project Management Chapter 9 Managing Project Risk
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
GIS Implementation: Issues and Strategies RNR-GEOG 417/517 Fall, 2000.
Organizational Design, Diagnosis, and Development Session 14 The Management of Change.
DEVELOPING THE WORK PLAN
Chapter 8 Process Implementation Reference: Tan, A. (2007). Business Process Reengineering in Asia: A Practical Approach, Pearson Education, Singapore.
Health Management Dr. Sireen Alkhaldi, DrPH Community Medicine Faculty of Medicine, The University of Jordan First Semester 2015 / 2016.
Project Management 101 People + Process + Product.
BizForceOne by MegaSolutionCenter (MSC), USA BIZFORCEONE OPERATING SYSTEM BEST FIT IMPLEMENTATION.
Info-Tech Research Group1 Info-Tech Research Group, Inc. is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Practical IT Research that Drives Measurable Results Establish an Effective IT Steering Committee.
Towards a dependable and sustainable National IT Infrastructure MANAGING IT INFRASTRUCTURE ASSETS: IMPLEMENTATION NEEDS.
Systems Analysis and Design in a Changing World, 4th Edition
NHN member organizations
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Presentation transcript:

CONDITIONS RIPE FOR BPR (HAMMER STYLE) Unarticulated/out-of-date rules Not right first time Sequential process Lack of focal point of responsibility Worker desire for autonomy Management trust of workers Lack of ability to respond

SUMMARY OF BPR PRINCIPLES (HAMMER STYLE) 1. Focus on outcomes, not tasks 2. With those who use the output, doing it themselves 3. And processing the information too 4. Without regard to geographic barriers 5. Linking functions (interdependence) 6. And allowing decision making authority (empowerment)

BPR RISKS Transition is hell -- may lost customers Transition never ends -- when is enough? Legacy systems will get in the way Current information technology still has its limits

BPR SCOPE Reinvent the business you’re in And/Or Reinvent what business you’re in

IT-ENABLED BUSINESS TRANSFORMATION Establishing Direction Design/RedesignImplementation Defining a broad vision for change Building infrastructure – Human – Technical – Capital Clarifying the vision and establishing the focus for change – Organizational and interorganizational prototypes Gaining commitment – Cascading levels of agreement Assessing risk/return Selecting partners Developing detailed design – Business process redesign – Management process redesign (structure, control, HRM, culture) – Information technology Implementing technology -- applying project manage- ment techniques to keep on schedule & within budget Managing risks Detailed cost-benefit analysis Developing education & communication materials Developing roll-out schedule Implementing change Managing organizational learning Feedback and Evaluation Source: Applegate, L.M., “IT-Enabled Business Transformation”, Boston: Harvard Business School Publishing, 1992.

REENGINEERING PROCESSMobilizationDiagnosisRedesignTransition  Create a Business Process Map  Appoint Process Owners and Establish Governance Structure  Formulate Reengineering Strategy  Determine Process Prioritization  Assign Reengineering Team Members  Bound and Scope the Process  Understand Customer Needs  Understand the Current Process  Identify Weaknesses in the Existing Design  Set Targets for New Designs  Create Breakthrough Process Design Concept  Redesign the Entire Business System  Develop Detailed Process Design  Build Laboratory Prototype  Test, Simulate, Learn, and Iterate  Implement Initial Field Release (Pilot)  Realize Initial Benefits  Adjust the Business Systems  Develop Supporting Infrastructure  Rollout and Institution- alize  Implement Succeeding Releases

REVIEW OF FIVE STEP PROCESS (D & S) 1. Vision & Process Objectives -- Who & How is This Determined? – Input From Customers/Marketplace – Technology Transfer from Another Company/Industry – An Executive Brainstorm 2. Processes to Be Redesigned – Exhaustive (Getting Something Done?) – High Impact (One Gets Better -- Others Get Worse?)

3. Existing Processes – Don’t Repeat Problems – Likely Doing Something Right 4. IT Levers (Discuss Table) 5. Prototype of New Process – Building Prototypes Not Easy – Pilot Identification & Control

KEYS TO THE DEMISE OF BUREAUCRACY Knowledge of people -- is there a gap developing? Are people committed to continuous learning? Willingness to accept responsibility for decisions/actions -- we’re going in two different directions at the same time. Not every job needs reinventing or can be reinvented with current technology. Board of Directors fulfilling their role