1 13 June 2011 ALICE ITS Upgrade Proposal Work organization  Document scope  Timeline  Editorial board and work organization  Status (next presentations)

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
UCLC Meeting UCLC Raison d’etre Steps to proposal (Oct 15 submission) Plans for Today Ritchie Patterson June 30, 2002.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Software Overview David Lawrence, JLab Oct. 26, 2007 David Lawrence, JLab Oct. 26, 2007.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
First Results from Cherwell, a CMOS sensor for Particle Physics By James Mylroie-Smith
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
ALICE ITS Coordination Board 16 July 2013 L. Musa 1.
1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.
© 2013 OSLC Steering Committee1 Proposal to Create OSLC Affiliated Technical Committees OSLC Steering Committee Meeting: 1 PM EDT, 8 July 2013 Open Services.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
FWD DETECTORS ALICE FORWARD DETECTORS workshop. AGENDA Tuesday, March 11th, 2003 at R Introduction and main deadlines, Jens.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
ATLAS micromegas activities (MAMMA)
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
1 News and Miscellaneous UPO Apr Didier Contardo, Jeff Spalding News from Oct. RRB HL-LHC Pile-up for simulation Upcoming events: DESY week – Taipei.
FIT (Fast Interaction Trigger) detector development for ALICE experiment at LHC (CREN) Institute for Nuclear Research (INR RAS) National Research Nuclear.
Evgeny Kryshen (PNPI) Mikhail Ryzhinskiy (SPbSPU) Vladimir Nikulin (PNPI) Detailed geometry of MUCH detector in cbmroot Outline Motivation Realistic module.
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
1 7 September 2011 Outline  Outline of present detector  Physics motivations & Design goals  Upgrade options, timeline, organization  Ongoing R&D ALICE.
Middle Fork Project Relicensing Process Plan April 25, 2006.
3 October, 2006GLD Meeting1 The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto.
Pavel Nevski STAR analysis meeting October 22, 2002 Status of STAR Detector Simulations Pavel Nevski BNL Standard setup Standard setup New detectors Next.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
1 HFT Wieman 11/6/ Outline  Development Status uMIMOSTAR pixel detectors uMIMOSA5 Electronic Readout uLadder mechanics uBeam pipe  Interface.
Silicon strip detector R&D issues –readout chip decision –interface with PHENIX –ladder Technical options –SVX4 or MVD-TGV+AMU/ADC recut –other sensors.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
DCal-ALICE integration and installation plan and status A. Tauro.
June-18 th -2007ATLAS-MPI; Status of ATLAS Technical Paper, R. Richter1 The ATLAS Technical Paper and back-up papers  Content of the ATLAS technical paper.
Towards Snowmass Jul. 13, 2005 Y.Sugimoto. Charge for Detector WGs Charge for Concept Groups: work towards a baseline design define performance criteria.
EUTelescope Testbeam Analysis: Summer 2014
SVT subchapters & editors
Next steps toward the beam test
PANDA Muon Group Meeting, Protvino 7 June 2011 G
ALICE upgrade plans Paolo Giubellino LHCC Upgrades
Vertex Detector project for the NA61/SHINE collaboration
Hall A Compton Electron detector overview
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
The DBD: Outline and Scope
Preparation of the CLAS12 First Experiment Status and Time-Line
IEEE TGaf Beijing Closing Report
Reliability Standards Development Plan
TGaj Editor Report for CC22
TGaj Editor Report for CC22
Presentation transcript:

1 13 June 2011 ALICE ITS Upgrade Proposal Work organization  Document scope  Timeline  Editorial board and work organization  Status (next presentations)  Discussion

2 13 June 2011 Document Scope (1/2) Physics motivations for the upgrade Performance and limitations of current detector Upgrade scope Novelty Competitiveness Detector functional requirements and specification Particle density and radiation load for the innermost layer Number of layers and their geometry Aceptance, hermeticity, segmentation and alignment Material budget Detector efficiency, signal dynamic range and linearity Event time resolution and readout time Vertexing and tracking performance PID performance Detection time and readout rate Trigger capabilities

3 13 June 2011 Document Scope (2/2) Detector Technical Implementation Technology options and evaluation Detector design options R&D plans Conceptual design for following items Detector ladder Beam pipe and detector integration Detector ladder mechanical support Insertion mechanism and installation Power distribution Cooling System Cabling and Service System Alignment and spatial mapping

4 13 June 2011 Document preparation - timeline Timeline Outline and list of figures20 th June Draft 0 (abstract for all sections)27 th June Draft 1 (draft version of text)15 th July Draft 2 (polished text + figures)26 th August (distribute to ITS coll.) Comments by ITS collaboration < 12 th Setpember Draft 3 with comments from ITS 19 th Septmeber (distribute to ALICE) Comments from ALICE < 10 th October

5 13 June 2011 Editorial Board Structure Coordinator: Stefan Rossegger Editors (explicitly mentioned in the document): all people that are giving a substantial contribution to the activities of the corresponding WGs and/or the preparation of the document. Editorial board (EB): G. Usai, A. Dainese, G. Bruno, M. Sitta, P. Riedler, G. Contin, A. Rivetti, R. Santoro, A. Tauro, V. Manzari, L. Musa Document repository in AFS WEB page will be set-up by Stefan for the editors