1 Hubble Science Operations Status Rodger Doxsey 18 November 2004.

Slides:



Advertisements
Similar presentations
Feb 16, 2006TIPS – S.Baggett1 Sylvia Baggett (STScI) Ray Boucarut (GSFC) GSFC Randal Telfer Manuel Quijada Petar Arsenovic Morgan Dailey Randy Kimble Jeff.
Advertisements

Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
1 HST Status Cycle 14 TAC/Panels 14 March Telescope and Instrument Status Telescope and support systems are all working well – no unexpected limitations.
Pipeline calibrations of ACS data Max Mutchler Hubble Space Telescope Calibration Workshop October 2005.
NGC 6217 in DSI mode with F658N Mosaic before new superbias why we don’t release images until after SMOV! ACS CCD monitoring and pipeline calibration review.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
STIS Closeout Plan Paul Goudfrooij 2005 HST Calibration Workshop, 10/26/2005.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
1 STScI Pipeline Thermal-vacuum data handling I. Neill Reid for WFC3 Instrument CALibration team ICAL.
Page 1. Page 2 SMOV Status SMOV is proceeding on-track Key programs executed –ERO program –Geometric distortion program completed –ACS to FGS alignment.
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
1 Wide Field Camera 3 Monthly Status ReviewJuly 17, 2007 WFC3 TIPS July 19, 2007.
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
ACS Drizzling Overview J. Mack; DA Training 10/5/07 Distortion Dither Strategies MultiDrizzle ‘Fine-tuning’ Data Quality Photometry.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
WFPC2 UPDATE TIPS : August 15, 2002 L.M. Lubin New WFPC2 Documentation 1.Cycle 12 Instrument Handbook (V7.0, Biretta et al.)  Updated information on the.
NICMOS Status Roelof de Jong (STScI) and the NICMOS team: Santiago Arribas, Elizabeth Barker, Eddie Bergeron, Ilana Dashevsky, Anton Koekemoer, Sangeeta.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Cosmic Origins Spectrograph
TIPS May 22, 20081H. Bushouse. TIPS May 22, 20082H. Bushouse TV3 Science Team Cast of “Characters” Instrument Scientists: –Sylvia Baggett –Howard Bond.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
The Hubble Space Telescope explores the limits of “roundness”: Ceres and Vesta Max Mutchler (Space Telescope Science Institute), Lucy McFadden, Jian-Yang.
TIPS COS Status: SMOV update III STScI/CU COS Team 17 September 2009.
1 TIPS May 17, 2007 WFC3 Ambient Calibration #2 Results H. Bushouse.
1 ACS Press Releases Science  Grism spectroscopy of UDF galaxies  Mass of the MACHO-LMC-5 lens  Earliest star-forming galaxies in UDF  Kepler’s SNR.
START NICMOS COOLING SYSTEM ACTIVITY SUMMARY. 1/25/01Ken Pulkkinen2 START NCS ACTIVITY Applicable SMOV Requirements: J NICMOS Cooling System.
NIRISS Calibration Working Group Activities NIRISS Science Team Meeting Montréal, 2015 October 20/21 Kevin Volk STScI / HIA.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
The Second Generation of IR detectors for WFC3 Massimo Robberto European Space Agency and Space Telescope Science Institute.
STIS Closeout Plan Paul Goudfrooij Space Telescope Users Committee, 11/18/2004.
The European Hubble Space Telescope Legacy Archive Wolfram Freudling.
1 WFC3 Science Data Volume  Data Volume Estimates for WFC3 Operations ISR WFC ; Lisse, Henry, Knezek, Hanley; 3/27/2001 ISR WFC ; Lisse,
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
STScI 2010 Calibration Workshop The NICMOS Legacy Archival Recalibration Project Anton M. Koekemoer and the STScI NICMOS Team (E. Barker, E. Bergeron,
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
WFC3 SMOV Report for TIPS 16 July 2009 John MacKenty This presentation contains material that is embargoed until after the SM4 ERO press conference. Images/spectra.
Introduction NICMOS (Near-Infrared Camera and Multi-Object Spectroscopy) was installed on the Hubble Space Telescope during SM2 in 1997 and has been the.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
May 22, 2003WFC3 Report at the June 03 TIPS1 Optical alignment and image quality testing at GSFC Test lead: Bill Eichorn, GSFC Test conductors: George.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Slitless spectroscopy with the Advanced Camera for Surveys Martin Kümmel, Søren Larsen & Jeremy Walsh 27 October 2005.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
Faculty meeting - 13 Dec 2006 The Hubble Legacy Archive Harald Kuntschner & ST-ECF staff 13 December 2006.
STIS Status TIPS, September 17, 2009 Charles Proffitt for the STIS team.
1 Future Directions in HST Data Processing 19 November 2004.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SMOVSMOV  ACS has now completed SMOV Program –Transitioned to interim calibration plan  Final SMOV programs –Further coronagraph calibration –Coronagraph.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
HST Cal Conf -- Oct 27, Calibration Status and Results for Wide Field Camera 3 – R. Kimble/GSFC, Calibration Status and Results.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
The STIS NUV-MAMA objective prism … … and looking beyond for HST UV slitless spectroscopy Jes ú s Ma í z Apell á niz HST Calibration worskhop 26 October.
Improved ACS Geometrical Distortion Correction Richard Hook TIPS Meeting, STScI, 18th December 2003.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
WFC3 STUC 18 November 2004 Optical Stimulus.
ST-ECFAnnual Review March Instrument Science Activities
NICMOS Science NICMOS Ultra-Deep Field data products released
Presentation transcript:

1 Hubble Science Operations Status Rodger Doxsey 18 November 2004

2 Topics Status of Cycle 12/13 Observing Programs Data Processing System status HST Lifetime enhancements  Two Gyro Development status  Others Instrument status  WFC3  COS  ACS/WFPC2  NICMOS STIS Close-out planning (Paul Goudfrooij)

3 Status of Cycle 12/13 Observing Programs

4 STIS failure Cycle 12Cycle 13 Safemode

5 Cycle 12Cycle 13

6 Status of replacement programs Expecting Phase II’s for 25 replacement submissions for previously accepted STIS programs  22 have been received and are being processed Expecting 45 Phase II’s for replacement programs  All 45 have been received and are being processed  A few orbits have already been executed Long Range Plan for Cycle 13 being re-developed incorporating replacement programs  Going well, should be done by end of November

7 Cycle 13 Large/Treasury Programs

8 Data Processing Systems Status

9 Recent Data Processing System Improvements New Archive Ingest system installed June 2  Removes artificial boundary between OPUS pipeline and Archive  Removes VMS systems from input side of the Archive Upgraded to 64 bit compiler on June 21 Tuned the EMC disk system over the summer Multidrizzle installed in ACS pipeline Sept. 22  Extra compute load is well within system capacity

10

11

12 HST Lifetime Enhancements

13 Support for Two Gyro Mode Short-term Scheduling systems updated for basic capabilities (Phase A)  Readiness review held November 5  Systems will be used for flight test in February Long-term Scheduling systems being updated to support full use of Two Gyro mode in Cycle 14  APT (Two gyro proposal processing)  SPIKE (for Long Range Plan) Two Gyro Handbook and Website up and running

14 Other Lifetime extension activities Transmitter utilization  Dropped default pure parallels in April  Replacing STIS with ACS will increase data volume ACS side switch preparations  Lessons from STIS power supply failure  Be ready for a quick switch to Side 2, when needed NICMOS/NCS power utilization  Investigating possibility of reducing nighttime load on batteries Collaborating with systems management and engineering staff at GSFC on many others

15 STIS Failure GB Deep Field Drop Pure Parallels

16 Instrument Status

17 WFC3 WFC3 successfully underwent thermal vacuum testing and calibration  Major milestone for WFC3 IPT WFC3 SOC met last week  Robotic servicing presentation well received  Concurrence with Science IPT priorities  Written report expected in a few weeks Planning on modifications to WFC3 for robotic servicing underway  Largest impact is adding gyros to WFC3  Looking at other changes to simplify robotic installation tasks

18 Thermal Vac Test Configuration Randy Kimble and Howard Bushouse during final instrument inspection Photo by John MacKenty

19 Test Team 24/7 STScI Support for Test execution and Quicklook analysis. Scientists:  John MacKenty  Howard Bushouse (ICAL lead)  Neill Reid (ICAL Project Scientist)  Sylvia Baggett  Wayne Baggett  Tom Brown  George Hartig  Olivia Lupie  Massimo Robberto QuickLook Operators:  Rosa Diaz-Miller  Inge Heyer  Bryan Hilbert  Jessica Kim  Marin Richardson  Jeff Stys  Misty Cracraft*  Helene McLaughlin*  Kevin Lindsay* (* new Hires) Operations Support: Mike Robinson Tom Wheeler

20 WFC3 Thermal Vacuum Test #1 WFC3 successfully completed it first System Level Thermal Vacuum test  Test ran from late August until ~10/18 (plan was 10/6)  Test focused on characterization of:  Optical performance and stability  Science performance of Infrared Channel (first real look at this)  Thermal performance of WFC3 (subject to gravity effects on heat pipes)  Test obtained  ~14,000 images (datasets)  Thermal and power profile information We have demonstrated that both the WFC3 Instrument and Team are functioning well

21 Positive Accomplishments WFC3 operations in realistic environment demonstrated  Instrument ops and flight software were excellent  Power margins are good  Thermal performance generally as expected  Good margin (3 degrees) on IR detector temperature  To limits of testing in gravity, heat pipes performing well  UVIS channel nominal performance (mostly same as ambient)  IR channel’s first operation  Backgrounds better than expected from subsystem tests Meet specs except perhaps at longest wavelengths (G141, F160W)  Image quality at or near specification  Filter ghosts/artifacts within specification  Detector noise and dark current as expected

22 Issues Uncovered Confirmed per-existing issues:  UVIS filter ghosts and CCD cross-talk unchanged from ambient test New science issues:  IR detector cross-talk  IR grisms badly out-of-focus (understood as 90deg rotation)  G141 and F160W have higher than expected backgrounds  G141 needs a red blocker  IR channel throughput analysis uncertain (15% deficit)  IR detector thermal control outside of specification (variation)  IR detector alignment transfer to instrument unsatisfactory  Image drift during thermal slews  Better than ACS before repair  Not to spec and perhaps not to current ACS level  Features in flat fields in F218W have grown (filter related)  Calibration system illumination patterns unacceptable (UVIS and IR)

23 WFC3 Path Forward WFC3 removed from SES chamber  Completed residual work on CASTLE alignment testing  Ambient check on alignments after WFC3 and CASTLE return to cleanroom Working schedule for compatibility with Robot Mission  Significant work to fix open liens (e.g. electronics redundancy)  On-going efforts to build improved filters for UVIS  Exploring replacement IR detector (2 prototypes delivered)  Radiation testing at UC Davis in December  Schedule driver is probably HST gyros (June 2006)  System Level Thermal Vacuum Test #2 in October 2006

24 COS SI Testing and Delivery SI formally delivered to HSTP in May  Alignment and NUV throughput testing pre- and post-ship  No effective alignment changes  Stored in clean room at GSFC  GSFC assumes responsibility for semi-annual functional testing after delivery  Next round of testing: late Nov 2004  All throughput data archived at STScI

25 STScI Support for COS Thermal-Vac Data Processing – Closed out topics from testing  Re-ingested T-V data with updated keywords  Initial Verification of CALCOS functionality for flatfielding, spectrum extraction, spectrum combination  Keyword dictionary prepared Documenting (TIR/ISRs) various situations  Cumulative Exposure Image (FUV/NUV) and Pulse-height map (FUV)  High Voltage transients in FUV detector and operational responses  FASTEX Standards Paper Deferred all SMGT, SMOV4, User Support effort Optic Select Mechanism drift will require re-work  Both thermal and mechanical components are present  No hardware amelioration planned  Must be corrected operationally to achieve design resolution in many cases

26 ACS Status All modes continue to operate well MultiDrizzle implemented in ACS pipeline  Works on associated data (exposures in a visit created with a recommended pattern or CR-SPLIT)  Produces cosmic-ray cleaned, combined, geometrically corrected output image New STSDAS standalone release planned for Nov 2004 (will work also for e.g. WFPC2) Further improvements planned for 2005  e.g., ability to automatically register images

27 ACS User Support Support provided for planning of 70 proposals:  24 proposals switched from STIS  11 use SBC  15 use ACS prisms  2 use ACS grism  1 uses WFPC2  39 newly accepted  7 proposals accepted through Chandra TAC ACS SBC (FUV) and spectroscopic modes (grism/prisms) can take over some of the science from STIS  Will require some additional calibration

28 ACS Calibration Polarimetric Modes Characterized  I. Introduction and status (ISR 04-09; Biretta et al.)  II. The POLV filter angles (ISR 04-10; Biretta et al.)  III. Astrometry of polarized stars (ISR 04-11; Kozhurina-Platais et al.) SBC dark rate measured  ISR (Cox) Amplifier Cross-Talk Characterized  I. Description of the effect (ISR 04-12; Giavalisco)  II. Using GAIN=2 to minimize the effect (ISR 04-13; Giavalisco) Geometric Distortion on HRC calibrated to 0.01 pixel  ISR (Anderson & King) Coronagraphic Flatfield Methodology improved  ISR (Krist et al)

29 WFPC2 Support & Calibration WFPC2 continues to be supported primarily through routine calibrations (dark, bias, UV contamination, …) and user support New Instrument Handbook released for Cycle 14 Accuracy of Photometric Zeropoints was studied  ISR 04-01: Heyer et al. Calibration plan for Cycle 13 prepared and being executed Time-varying geometric distortion solutions were delivered as reference files for use with MultiDrizzle

30 NICMOS Status NICMOS Ultra-Deep Field data products released  Identification of possible z~7 source(s) Cycle 13 Calibration plans  Significant reduction in monitoring programs due to stability of NICMOS  Calibration/Science ratio reduced to less than 3% for NICMOS

31 NICMOS – Calibration Delta-T test – April 2004  NCS temperature set point changed +0.5K, - 0.5K, and –1.0K relative to set-point of 72.4K.  Goal  reenable T-dependent darks in pipeline  Test completed successfully

32 NICMOS – User Support Cycle 13 (including STIS supplement)  49 proposals accepted for cycle 13 use NICMOS Prime science – 926 orbits Parallels – 684 orbits Snapshot – 146 orbits  Coronagraph will be heavily used – 195 orbits  Polarimetry – 45 orbits  Grism spectroscopy – 500 orbits (parallel)