June 7th 1:15 PM = start of first presentation session 1:00 – 5:00 PM Must have table set-up before 11:30 AM in Sullivan Hall
Invitations Sent to sponsor liaisons, faculty, advisory committees, alumni (1987 – 2012) You invite employers, family, and friends Invite and schedule will be ed and on Pre Projects Day:
Presentation at Sponsor Schedule presentations at sponsor organization Have liaison check presentation for any company confidential information / nondisclosure Invite us to attend! Pre Projects Day:
Display Boards Use templates— ed to you-- also on Project Center Website Submit display board files to Faculty Advisor by Friday, May 24 th - 4pm Display Boards and nametags will be prepositioned on tables for you You bring added display items to set up on morning of Projects Day Pre Projects Day:
Table Display Setup Teams supply own equipment Teams arrange for transportation of equipment on Projects Day Teams get one 8 foot table Teams requiring additional space or special electrical for their displays requests by May 31st
Project Reports Due Wed, May 29 th by 4pm to Faculty Advisor Follow Department Guidelines Include completed print request with numbers of copies and pages needed in color or odd size (be conservative!) Pre Projects Day:
YOUR REPORT IS YOUR DELIVERABLE! Ask your project sponsor if they want a hard and/or electronic copy of the report before the due date. Make sure you get your project report to your sponsor !!! This is part of your final checkout process
Sullivan Hall Floor Plan
Projects Day Presentations Presentations: 15 min plus 5 min for Q&A Presentation on USB / CD Practice in the room Sign up with Ernie to reserve practice time SU laptops will be pre-positioned on morning of Projects Day in presentation rooms PC friendly version of file presentation must be loaded on laptop no later than 10am on Projects Day
Practice Session Dates Sullivan Hall – Monday, June 3 Room 105Room 110Room C5Room C6 Monday, June 3 10am – 11am 11am – 12pmECE 13.3 PACCAR 12pm – 1pmCSSE 13.4 Snohomish PUD ECE 13.5 Waterwheel Power Generation 1pm – 2pmCSSE 13.1 ALSTOM Grid ME 2pm – 3pmME 3pm – 4pm
Practice Session Dates Sullivan Hall – Tuesday, June 4 Room 105Room 110Room C5Room C6 Tuesday, June 4 10am – 11am 11am – 12pm 12pm – 1pmCSSE 13.2 Microsoft 1pm – 2pm 2pm – 3pm 3pm – 4pm
Practice Session Dates Sullivan Hall – Wednesday, June 5 Room 105Room 110Room C5Room C6 Wed, June 5 10am – 11amECE 13.6 SNC Lavalin 11am – 12pmECE 13.4 Autonomous Aerial Robot 12pm – 1pmCSSE 13.3 Philips 1pm – 2pmME 2pm – 3pmME 3pm – 4pm
Practice Session Dates Sullivan Hall – Thursday, June 6 Room 105Room 110Room C5Room C6 Thurs, June 6 10:15 – 12:20CEE
Projects Day Schedule Sullivan Hall will be open at 8:00 AM Displays ready by 11:30 AM Guest registration begins at 12:15 PM in Sullivan Hall Welcome to Projects Day at 1:00 PM First presentation session begins at 1:15 PM
Projects Day Schedule Sullivan Hall Welcome to Projects Day – 1:00 – 1:10 PM First session presentations 1:15 – 2:15 PM Break from 2:15 – 2:30 PM Second session at 2:30 – 3:30 PM Poster session 3:30 – 4:15 PM Be at your table—there will be passed appetizers Reception from 4:15- 5:00 PM Mingle with guests and sponsors Have one team member at table at all times
June 7, 2013 Room 109Room 110Room C5Room C6 1:15pm – 2:15pm CSSE 13.1 ALSTROM Grid CSSE 13.2 Microsoft CSSE 13.3 Philips ECE 13.1 Honeywell ECE 13.2 Electric Vehicle ECE 13.3 PACCAR CEE 13.6 King St Pre- School CEE 13.2 SCL – Diablo Dam CEE 13.3 SCL – Bothell Substation- ME 13.1 Boeing ME 13.2 Flow ME 13.3 Kenworth 2:15pm – 2:30pm Break 2:30pm – 3:30pm CSSE 13.4 Snohomish PUD MSE 13.1 REI MSE 13.2 Scout Analytics ECE 13.4 Aerial Robotics ECE 13.5 Waterwheel ECE 13.6 SNC Lavalin CEE 13.4 SCL – South Substation CEE 13.1 Herrera CEE 13.5 SPU ME 13.4 Bicycle Drive Train ME 13.5 PATH ME 13.6 TSI Presentation Room Assignments
Projects Day Details Eat lunch beforehand! Professional attire Guest parking in the 12 th and Marion lot (P7)– first come, first serve; Overflow in P4 and Broadway Garage (P5) Name tags will be on team tables Reception – Be a host to your sponsors
After Projects Day Take everything except your display board Equipment should be returned Reimbursement requests to Robin Evans (budget office, E-510), - or Mike Smith (CSSE) Provide summer address Project Room clean up and checkout by June 14 th at 4:00 pm (checklist)
Contact Information Ernie Lou Need volunteers --tear down Need contact for clubs who want to display (SWE, etc) Questions?