CTR Performance WSDOT Nisqually Board Room December 4, 2015 Lynn Peterson Secretary of Transportation 2013/2014 Cycle Additional CTR Performance Paul Mason.

Slides:



Advertisements
Similar presentations
Accounting Method for Chinas Quarterly GDP by Expenditure Approach QIU, Qiong Dept. of National Accounts, NBS.
Advertisements

Valuing an Acquisition
1.Explain the nature and importance of capital investment analysis. 2.Evaluate capital investment proposals, using the following methods: average rate.
Infrastructure Planning and Funding MID-REGION COUNCIL OF GOVERNMENTS MID-REGION METROPOLITAN PLANNING ORGANIZATION MARCH 19, 2015 NAIOP-NEW MEXICO CHAPTER.
Resetting the measurement table CTR Board Meeting March 28, 2014 WSDOT Staff Evaluating a New CTR Program.
Ch 6 Project Analysis Under Certainty
Higher Education: Improved Tax Information Could Help Families Pay for College (GAO ) Presentation at the 30 th Annual SFARN Conference June 21,
The Consumer Price Index A Way to Compare Prices in Different Years.
Ch. 6: MONITORING CYCLES, JOBS, AND THE PRICE LEVEL The business cycle Measures of labor market activity Unemployment –Sources –Duration –Groups affected.
Improving Advertising Conversion Studies Chapter 47 Research Methodologies.
Archived Data User Services (ADUS). ITS Produce Data The (sensor) data are used for to help take transportation management actions –Traffic control systems.
1 The Economics of Congestion Brian Gregor PSU Transportation Seminar 3/12/04.
21 st Century Committee Report Recommendations NC 73 Council of Planning Annual Meeting January 22, 2009.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
SUMMARY OF BENEFITS AND RETURN ON INVESTMENT GPS FLEET TRACKING.
Use of Truck GPS Data for Travel Model Improvements Talking Freight Seminar April 21, 2010.
REVIEW FOR SECOND QUIZ Aswath Damodaran. 2 The Foundations of Investment Return Measurement  Focus on cash flows and not earnings.  Look at incremental.
Fabozzi: Investment Management Graphics by
2010 State of the Commute Survey Presentation National Capital Region Transportation Planning Board July 21, 2010 ITEM #12.
New Revenue Subcommittee Recommendations. Criteria Elasticity Elasticity Ability to phase in Ability to phase in User-based User-based Yield Yield Ease.
Section 3B- Modules 14/15- Inflation and the Business Cycle.
Chapter 3 political and economic analysis Section 3.1
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
12-0 Dollar Returns 12.1 Total dollar return = income from investment + capital gain (loss) due to change in price Example: You bought a bond for $950.
Lynn Peterson Secretary of Transportation Combining Macro Scopic and Meso Scopic Models in Toll and Traffic Revenue Forecasting SR 167 Corridor Completion.
Simpson County Travel Demand Model Mobility Analysis November 7, 2003.
Snapshot of the Superintendency Virginia Association of School Superintendents September 19 - October 5, 2012.
Quantifying Transportation Needs and Assessing Revenue Options: The Texas Experience presented to The Arkansas Blue Ribbon Committee on Highway Finance.
Inflation Report November Costs and prices.
Chapter 6 Investment Decision Rules
Social Return on Investment: Practical Tools for Cost Benefit Analysis Reclaiming Futures Webinar Kristina Smock Consulting July 28, 2010.
An Examination of Non-Traditional Worksites Within the Yakima Urban Growth Area: Agriculture & Higher Education.
UNIT C ECONOMIC FOUNDATIONS AND FINANCING 5.02 Explain the relationship between economic measurements and economic growth.
CHAPTER 17: Index Numbers to accompany Introduction to Business Statistics third edition, by Ronald M. Weiers Presentation by Priscilla Chaffe-Stengel.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
American Community Survey (ACS) 1 Oregon State Data Center Meeting Portland State University April 14,
Major Transportation Corridor Studies Using an EMME/2 Travel Demand Forecasting Model: The Trans-Lake Washington Study Carlos Espindola, Youssef Dehghani.
MANAGING NONINTEREST INCOME AND NONINTEREST EXPENSE Chapter 5 Bank Management 5th edition. Timothy W. Koch and S. Scott MacDonald Bank Management, 5th.
Inflation Report August Costs and prices Chart 4.1 Measures of consumer prices (a) (a) Data are non seasonally adjusted.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Xpress Bus Data Collection Data is collected from two sources: (a)Driver surveys of ridership (weekly) (b)Revenue-based ridership (monthly) Revenue-based.
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
Jeopardy Topic 1Topic Q 1Q 6Q 11Q 16Q 21 Q 2Q 7Q 12Q 17Q 22 Q 3Q 8Q 13Q 18Q 23 Q 4Q 9Q 14Q 19Q 24 Q 5Q 10Q 15Q 20Q 25.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
Phase 2: Data Collection Findings and Future Steps.
San Joaquin Valley Sustainable Communities Strategies (SCS) Update July 25,
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Daivamani Sivasailam TPB Technical Committee October 5,
MEC’S BLUEPRINT MISSISSIPPI LONG-TERM TRANSPORTATION/ INFRASTRUCTURE PLAN.
2014/15 Educational and General Budget Board of Governors Finance, Administration, and Facilities Committee October 16, 2013.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
China ’ s Input-Output Survey and Its Tabulation Method QI Shuchang Dept. of National Accounts, NBS.
Geometric Design: General Concept CE331 Transportation Engineering.
Goals and Targets for CTR Plans Olympia, Washington September 26, 2014 Lynn Peterson Secretary of Transportation for CTR plans Recommendations.
Proposed Interim Guidance – Small Starts. 2 Purpose Before Final Rule, evaluate and rate projects to: Advance projects into project development Provide.
Do Mobility-Based Performance Measures Reflect Emissions Trends? Congestion and Emissions Co-performance Alex Bigazzi & Dr. Miguel Figliozzi ITE Western.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Center for Urban Transportation Research | University of South Florida Performance Measurement.
Inflation Report February Costs and prices.
City and County of San Francisco 1 Five Year Financial Plan Update FY through FY Joint Report by the Controller’s Office, Mayor’s Budget.
WELCOME! Commute Trip Reduction (CTR) Survey Briefing.
Average Published Charges (Enrollment-Weighted) for Full-Time Undergraduates by Sector,
Cheryl Ng Ling Hui Hee Jee Mei, Ph.D Universiti Teknologi Malaysia
Overview of FHWA CMAQ & System Performance Measures
CTR Performance 2015/2016 Cycle Aggregate Report
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
CTR Survey Snapshot 2015/2016 Cycle – To Date Paul Mason Roger Millar
I-81 Corridor Improvement Plan
CTR Performance 2013/2014 Cycle Paul Mason Lynn Peterson
Webinar: Responding to the FHWA CMAQ & System Performance Measures:
Performance Measurement
Presentation transcript:

CTR Performance WSDOT Nisqually Board Room December 4, 2015 Lynn Peterson Secretary of Transportation 2013/2014 Cycle Additional CTR Performance Paul Mason Performance Analyst

The Employer Survey in conjunction with the Aggregate Report 2 Employer Survey:  535 Responses for 2013/2014 sites  Available fields to answer: 221  For surveys received:  Average fields with a response: 77.1%  Five sites responded to fewer than 30% of the fields, with these five ignored  Provides additional worksite information not captured in the aggregate report Aggregate Report  966 Worksites counting towards goal for 2013/2014  VMT reduced by 33 million miles  Worksite sizes vary from 1 to well over 20,000 employees  Median size: 243 employees

3

Percentage of Questions Answered per Employer Survey 4 5 of 535 Surveys Answered less than 50% of questions Min: 28.1% Max: 92.8% Average: 77.1%

Number of Worksites by Industry Type 5 Note: These only reflect the 530 sites with Employer survey responses. The remaining 436 sites (of 966) are not represented here.

Number of Employees by Industry Type 6 Note: These only reflect the 530 sites with Employer survey responses. The remaining 436 sites (of 966) are not represented here.

Non-Drive Alone Travel Rates by Industry Type Weighted by total number of employees 7 Note: These only reflect the 530 sites with Employer survey responses. The remaining 436 sites (of 966) are not represented here.

Count of Sites, by Employer Size All Employees 8 Note: These only reflect the 530 sites with Employer survey responses. The remaining 436 sites (of 966) are not represented here.

Non-Drive Alone Travel Rate and Employer Size All Employees 9 Note: These only reflect the 530 sites with Employer survey responses. The remaining 436 sites (of 966) are not represented here.

Non-Drive Alone Travel Rate and Employer Size All Employees 10 Note: These only reflect the 530 sites with Employer survey responses. The remaining 436 sites (of 966) are not represented here.

Non-Drive Alone Travel Rate and Proximity of Site to Bus Stop 11 Note: These only reflect the 530 sites with Employer survey responses. The remaining 436 sites (of 966) are not represented here.

Private Investment and Performance? The annual employer survey asks about different funding amounts Challenges: –The existing Employer survey responses to financial questions represent less than half of the 966 worksites in this cycle –In looking at the provided data, some worksites within the same company have identical numbers reported, suggesting that some financial data may be double-reported –There are privacy concerns around this information being collected and analyzed With the private financial information being incomplete, we cannot draw conclusions based on our current data 12

CTR Benefit Versus Traditional Construction? 13  VMT reduction of 33 million miles in 2014  This translates to an approximate VMT reduction of 36,000 miles per peak hour  Average throughput during peak period = 1,800 single occupancy vehicles per lane per hour  Per WSDOT 2015 Corridor Capacity Report, averaging SOV throughput per lane on I-5, I-405, SR-520, and I-90 during the peak periods   This is the equivalent capacity of adding a single lane that is 40.3 miles long Since the program is administered in multiple areas throughout the state, the simple addition of 40.3 lane-miles would not yield the same results achieved by the program.

CTR Benefit Versus Traditional Construction? 14 Theoretical Cost of a 40.3 mile long lane added to the existing freeway  Costs for adding an additional lane to an existing freeway +  $4.1 to $14.7 million per lane-mile in 2015 dollars, small urban area  Low estimate of $7.5 million per lane-mile in 2015 dollars, large urbanized area  Cost of adding 40.3 miles  From $166 million to $591 million, small urbanized environment  A low estimate of $304 million, large urbanized environment + Per-mile cost of adding a lane is outlined below, per FHWA’s Table 6-1. Elemental Capital Improvement Costs, in 2002 dollars *The following calculator was used to convert from 2002 to 2015 dollars. This calculator is tied to the consumer price index (CPI) Since the program is administered in multiple areas throughout the state, the simple addition of 40.3 lane-miles would not yield the same results achieved by the program. Right of way acquisition costs vary widely depending on the area. The above estimates may be high for rural areas and low for large urban areas.

Question for the Board 15  Now is a good time to discuss assumptions and methodologies  Additional methods and analyses can be applied to existing program data  Calculations can be simplified, where appropriate  Can the performance committee convene to discuss the above items and more?