Technical Support 2008 1 8/21/08 PHENIX WEEKLY PLANNING 8/21/2008 Don Lynch.

Slides:



Advertisements
Similar presentations
Technical Support /7/08 PHENIX WEEKLY PLANNING 8/7/2008 Don Lynch.
Advertisements

Technical Support /23/08 PHENIX WEEKLY PLANNING 10/23/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
Technical Support /13/08 PHENIX WEEKLY PLANNING 11/13/2008 Don Lynch.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
Technical Support /12/08 PHENIX WEEKLY PLANNING 6/12/2008 Don Lynch.
1 1/22/2009 PHENIX WEEKLY PLANNING 1/22/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
Technical Support /11/08 PHENIX WEEKLY PLANNING 12/11/2008 Don Lynch.
1 3/5/2009 PHENIX WEEKLY PLANNING 3/05/2009 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /17/08 PHENIX WEEKLY PLANNING 7/17/2008 Don Lynch.
Technical Support /24/08 PHENIX WEEKLY PLANNING 4/24/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
Technical Support /8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
Technical Support /19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
Technical Support /26/08 PHENIX WEEKLY PLANNING 6/26/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
Technical Support /18/08 PHENIX WEEKLY PLANNING 12/30/2008 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Technical Support /22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

Technical Support /21/08 PHENIX WEEKLY PLANNING 8/21/2008 Don Lynch

Technical Support /21/08 Shutdown ’08 Schedule RPC Factory: Dark Current test standin design due 9/30 Mu Trigger FEE upgrade: Station 2/3 scaffoldingDone Station 1 scaffoldingDone Rack assemblyinstall in North by 8/22, South by 9/30 LV cable prepDone Optical cable prepDone N&S platforms Fabricate & installfabrication complete, North platform is installed, install South by 9/30 (Pearson) Rebuild Bridge & EyebrowComplete by 9/30 Prep work for platforms (water/elec)in progress finish by 8/22 LV cable installationSta Station 2 & 3 Done, Sta 1 by 8/29 optical cable installationSta Station 2 & 3 Done, Sta 1 by 9/15 FEE installation N&S sta’s. 1,2 & 3Sta Station 1 & 2 Done, Sta 3 by 9/15

Technical Support /21/08 Shutdown ’08 Schedule Mu Trigger FEE Upgrade (cont’d): FEE water and dry air installationStarts today finish by 9/30 Install S rack cooling & electricOct.after CM moves north Install FEE’s in MMS for RPC test Oct.after CM moves north Rack room electronics, etc.Sep.– Oct. Disassemble station1 scaffoldcomplete by Oct 15 Testing Sep.-Nov. Complete by 11/15 RPC internal reviewSep. RPC proptotype installation: Prep workwait for final installation design move (7) MuID pipes move gap 5 south cable tray Rack prepIn progress complete by Aug 29 RPC prototype gas systemIn progress complete by Sep 30 Move shielding for installationJuly - Sep [Pearson] RPC prototype cable routing & supportAug - Sep Modify crystal palace & vapor barrierJuly – Sep [Pearson] RPC prototype install (RPC2 – PHENIX) Sep. – Oct. (RPC3 – C. Pearson) Sep. - Oct.

Technical Support /21/08 Shutdown ’08 Schedule, cont’d RPC proptotype installation (cont’d): Install rack in tunnel southInstall bt 9/30 Replace tunnel shielding/Vapor BarrierNov. [Pearson] Connect electronics/gas Sep. – Nov. MuTr Decapacitations (Sta. 1 N and MMN)North: (Station 1 and 3) done South: targets of opportunity Mike Leitch will be back 9/8/08 Fan Tray maintenancein progress (on going fill-in) PC1 west work (needs planning)Oct. 15 CM Crane Install[postponed indefinitely?] HBD InstallOct. 27 DC East?/West RepairsNov. 15 Remove all inst’n equipment Sta 1 (from south)Remove by 1/15 Sta 2/3 scaffoldsRemove by 11/15 all other testing equipmentRemove by 12/1 Prep for shutdown 2009 Gap 5 N piping and cable tray re-loc.Oct. - Dec Gap 2 N cable tray & crate re-mountsOct. – Dec.

Technical Support /21/08 Shutdown ’08 Schedule, cont’d Prep for run 9 Begin run 9 Prep12/1/09 Install all lampshadesComplete by 11/26 Roll in EC12/22 Pink/White/Blue sheets12/29 Close shield wall 12/31 Cryo Start up1/1/09 Flammable Gas/start shifts 1/11/09 Start physics1/18/09 End Run 96/30/09 Other Work VTX prototype design supportdone, for now NCC prototype design supportIn progress finish in Sep HBD supportas required VTX fabrication tooling designSep – Oct VTX installation designOct - Nov FVTX design/engineering supportas required

Technical Support /21/08 1) Run Power to new MuTrgr FEE racks on MMN and MMS - Final design of the reworked North Muon Power Distribution System is set. Nearly all material acquired eithout cost. Paul is m revising the One-Line electrical drawing. CAD approval required…maybe by next week. Effort should take ~ 1 week. The new power cable feed to the MuTrigger rack is installed (2 cables, 1 spare) with no connection to the panel down below. The new North side power panel is installed on the IR North east corner wall. The new 75 KVA transformer for the entire North Arm service is reconditioned and tested satisfactory. The power for the South RPC tunnel Rack(s) to be taken from an existing (spare) breaker in the Muon Tracker power panel. This should take less than 1 day to install. NO CHANGE PHENIX electrician needs to install vertical section of cable tray from North Magnet Lampshade to underside of new rack platform. CAD concurrence for construction details (Pearson) is required. COMPLETED MuTrigger LV Rack construction to require 4 man days to complete starting Monday 8/11. See line 5 for update. 2) Install power feeds to RPC north & south tunnel racks from IR power panels. – Plan is to run the cables from the IR to the North tunnel rack locations. The south RPC rack power can be taken from the existing (spare) breakers in the SMI power panel located on the IR south west wall. These cable runs may take a few days to complete due to new power tray runs required into the tunnel areas. Not done due to lack of manpower – working on other higher priority items. Shutdown ’08 Electrician Work

Technical Support /21/08 Shutdown ’08 Electrician Work, Cont’d. 3) Install new UPS in Gas mixing house. Not done due to lack of manpower – working on other higher priority items. 4) Install power and signal cable tray (ceiling suspended) for new DCM rack row – north of existing DCM racks. - on Hold until new floor plan is determined 5) Assist in signal and LV cable installation for MuTr/RPC upgrades as necessary. Work in progress – Optical and LV cables installed. LV cables (rack end) are coiled on platform deck next to LV rack mount location. Optical patch rack installed with some cables connected into rack. Work on LV rack continues – not expected to be completed until later next week. 6) Upgrade power capacity of Central Magnet power distribution for future bridge rack loads. a) Remove existing 15KVA transformer and install 45KVA unit. b) Install new (larger size) power cable from rack room to Central Magnet distribution breaker panels. - This job is on hold. No new racks in CM this year. 7) Install 120 volt AC power drops into new control room annunciator alarm rack (rack room). Not done due to lack of manpower – working on other higher priority items. 8) Ordering parts for South MuTrigger LV rack. Rack plumbing complete. Internal wiring to start maybe end of next week. 9) Discussions started with Chi and Steve Boose concerning RPC prototype rack for south tunnel.

Technical Support /21/08 New FEE Platforms & Modified Bridge Parts Mike Leitch needs access to eyebrow by 9/8 Replace modified bridge sections by ?? Install new South MuTrggr FEE rack platform by ??

Technical Support /21/08 MuTrigger FEE Rack Utilities Tees and Valves North FEE & Tunnel Electric Supply

Technical Support /21/08 MuTrigger FEE Installation Prep North & South Rack Prep

Technical Support /21/08 North FEE & Tunnel Electric Supply MuTrigger FEE Installation Prep MuTrgr FEE N Cable routing

Technical Support /21/08 MuTrigger FEE Installation Prep Station 1 cable management planning Station 2 chasis installed

Technical Support /21/08 To match absorber and prototype RPC’s, we need to install new FEE upgrades in these 5 MuTR FEE’s We will develop a plan to access these for installation and testing from a custom work platform (to be designed). MuTrigger FEE upgrades in MMS in support of RPC prototypes

Technical Support /21/08 MuTr Decapacitations MuTr group needs this setup from last year to work on decapacitations in the south magnet

8/21/0815 MuTr FEE upgrade status Tsutomu Mibe (KEK) for the onsite upgrade team 15

8/21/0816 Chassis status Preparation Back plane and water leak test completed. Completed assembling bottom plate and LV cable Installation – Completed Station-2 Mount. LV cables are all connected – Station-1 Chassis are mounted except for Octant 7. – Existing Cables are re-arranged for Octant 6 and 8. – Access platform for bottom octant. Engineering Design for Octant 7 to be discussed. – Station-3 Chassis to be Mounted. – Installation of cooling water tubes started. 16

8/21/0817 LV Status New cable tray was installed. LV Rack Construction will be completed by Friday. To be tested with Distributor Boards Installed to the platform next week LV cables will be cut and connected to LV rack accordingly. 17

8/21/0818 Optical Cable Completed chain test Station-2 and Octant-1 of Station-3. Two dead cables were found. Replaced with spare 5 more trunk cables to be delivered by the end of Aug. Station-1 cables are being installed. 18

8/21/0819 FEE-ADTX cable 200 cables (30cm) were arrived on Monday Completed checking – Swap channels – Dead channels – All passed OK All mapping tables are available Ready for installation Need more 40cm cables for the station 1 installation, but may be available by the end of Sep. 19 PPG Logic analyzer FEE-ADTX cable

8/21/ test bench status Chassis QA (completed) MRG-LL1 communication test (completed) Finalize FPGA design for ADTX (in progress) ADTX board QA preparation (in progress) MRG-ONCS (in progress) GTM-DCMIF (in progress) FEE-ADTX cable QA (partly done) DCMIF-DCM communication Full chain test (ADTX-MRG-DCMIF-DCM) ADTX board QA 20

8/21/0821 ADTX board production status Parts – In hand, for 20 boards – Remaining parts for 200 boards will be available by mid Sep. Board production – 20 boards will arrive at KEK in Sep 2 nd. Expected to be here in mid Sep. – Remaining board may be produced by the end of Sep(?). QA – Burn-in at KEK – Full-QA at RIKEN test bench – Simplified-QA at 1008 test bench 21

Technical Support /21/08 RPC2 Prototype Installation, cont’d

Technical Support /21/08 RPC Absorber Concept RFQ placed with CS

8/21/0824 RPC3 Final Design RPC3 final design is based on Prototype D The corner plates have been modified to allow connections between half octants and lifting The internal details are the same design, slightly different dimensions –All internal fasteners are M6 RPC3 final is smaller in OD, and goes down to smaller ID –Smaller ID is a positive feature for installation

8/21/0825

8/21/0826

8/21/0827 The fact that the inner diameter is smaller in this design allows a very simple half-octant to half-octant connection that can be reached from inside the tunnel. Threaded rods inserted through aluminum corner blocks connect half octants to each other. The threaded rods can only be inserted from the tunnel side, assuming that the structure is assembled as close to the muon ID steel as possible. (This is only a problem at mezzanine level.)

8/21/0828 View of a lifting lug on the corner plate of a half octant. SC magnet not shown, but must be accounted for in assembly.

8/21/0829 The straight corner block for the half octant boundary M8 threaded rods attach the corner blocks

8/21/0830 The angled corner block for the octant boundary (Ignore the glitching. The threaded rods are inside the nuts.)

8/21/0831 Lifting horizontally using the final lift lugs

8/21/0832 An example shackle on the bolted-on lifting lug. The bolt is a ½-13 X 4” long hex head This might be simplified to just a rod to put a hook around because that is easier to disengage during installation

8/21/0833 Hanging from the OR octant boundary corner

8/21/0834 Hanging from the OR half- octant boundary

8/21/0835 Hanging from the IR octant boundary corner

8/21/0836 Hanging from the IR half- octant boundary corner

8/21/0837 This picture shows which points you have to lift from to lift the half octant and hold it vertical. The IR points do not surround the CG.

8/21/0838 It is possible to lift from this point in this configuration

8/21/0839 Only three of these corners will carry significant load. Calcs indicate that this is an acceptable lifting configuration for the C-channels. Not known yet what happens to modules inside.

8/21/0840 Close-up of the IR end in a flat lift

8/21/0841 This nut needs to come off to remove the swivel hoist ring. That’s why they are probably not so useful during installation.

8/21/0842 Summary RPC3 is fully modeled and will have manufacturing drawings shortly There are still some open installation questions These pictures will be available on ftp.

Technical Support /21/08 Detector upgrade Rack allotments New Platform HBD/RXNP (not shown) MuTrgrFEE N MuTrgrFEE S VTX Power FVTX NCC N NCC S RPC1 S RPC1 N New Platform RPC1 NS VTX FEM No Changes

Technical Support /21/08 Rack Room Reorganization Inventor model in progress

Technical Support /21/08 CM Crane, Station 1 scaffolding CM Crane procurement postponed indefinitely

Technical Support /21/08 Safety, Security, etc. Beware of arachnids! They hide in dark places Waiting to get you. This could happen to you!

Technical Support /21/08 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Only 4 more days and 86 more gold medals to go