Information Services Internet Accounting Workshop 1 st Feb 2011 Peter Kurtz Manager, Network & Communication Services.

Slides:



Advertisements
Similar presentations
SIP and Instant Messaging. SIP Summit SIP and Instant Messaging What Does Presence Have to Do With SIP? How to Deliver.
Advertisements

Online Tenant Request System Reliable and accurate, the IMPAK online tenant request system significantly reduces telephone time and paperwork.
HetnetIP Ethernet BackHaul Configuration Automation Demo.
MIDAS is a complete web based scheduling solution for managing your facility’s bookings and resources. MIDAS is a complete web based scheduling solution.
P3, M2,M3,M4.
Introduction to Systems Management Server 2003 Tyler S. Farmer Sr. Technology Specialist II Education Solutions Group Microsoft Corporation.
Enterprise Fleet Management Mobile Resource Manager - MRM.
Red Hat Linux Network. Red Hat Network Red Hat Network is the environment for system- level support and management of Red Hat Linux networks. Red Hat.
ManageEngine TM Applications Manager 8 Monitoring Custom Applications.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Cisco NAC Guest Server Guest Access - Simplified Tim Wellborn SE Sangeeta.
GLOCO Customer Service and Support
The leading print management solution COST SAVINGS ● SECURITY ● PRODUCTIVITY.
THE UNIVERSITY OF GEORGIA Office of the Chief Information Officer Enterprise Information Technology Services UGA Bomgar Contact: Marcus Henderson.
OPC Alarm.NET.
Barracuda Networks Confidential1 Barracuda Backup Service Integrated Local & Offsite Data Backup.
Fine Point Technologies Remote Device Administrator.
Copyright © 2002 ACNielsen a VNU company Key Features and Benefits of the 3CX PBX for Windows Server.
EToken TMS 5.0 CA June 09. eToken TMS 5.0 Agenda  The challenge: Authenticator life-cycle management  eToken TMS (Token Management System)  eToken.
Transform Your Business with SP Business Suite In the Cloud or On-Premise.
Course 6421A Module 7: Installing, Configuring, and Troubleshooting the Network Policy Server Role Service Presentation: 60 minutes Lab: 60 minutes Module.
Customer Sales Presentation Stoneware webNetwork Powered by ThinkServer.
Technology Coordinators Training. Confidential Copyright © 2007 Pearson Education, Inc. and/or one or more of its direct or indirect affiliates. All rights.
Premium Service Package Project Proposal December 15, 2012 Suresh Akana Sheraz Choudhary Craig Davis David Fobert Susan Korgen.
Uniting Cultures, Technology & Applications A Case Study University of New Hampshire.
Dual WAN Router Brand & Marketing MGMT Dept DrayTek Corp Vigor2912 Series 14 th Jan Based on f/w RC4.
This information is confidential and proprietary to Lawson ® and cannot be reproduced without permission. Reducing Resolution Time with Advanced Electronic.
Spring 2011 CIS 4911 Senior Project Catalog Description: Students work on faculty supervised projects in teams of up to 5 members to design and implement.
Deploying XenApp and XenDesktop with BIG-IP Brent Imhoff – Field Systems Engineer Gary Zaleski – Solutions Architect Michael Koyfman – Solutions Architect.
SIAM for Device Management May
1 Introduction to Microsoft Windows 2000 Windows 2000 Overview Windows 2000 Architecture Overview Windows 2000 Directory Services Overview Logging On to.
ArcGIS Server for Administrators
Exchange Deployment Planning Services Exchange 2010 Complementary Products.
Internet Access Service Case Study 2012 Presenter: Peter Kurtz, Manager Network & Communication Services Information & Communication Technology Services.
CRICOS No J a university for the world real R Queensland University of Technology CRICOS No J Case Study of Internet Access at QUT Rod Swile.
UoM Data Billing Environment Legacy and Refresh Systems Cameron Shepherdley Information Technology Services.
July What is the eCost TMS Solution ? Benefits & Features Explore the eCost Software Smart Storage Device (SSD9000 / SSD9001) - Buffers DX10 Dongle.
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. 1 Automate your way to.
Queensland University of Technology CRICOS No J Internet Access and QUT Presented by: Peter Kurtz February 2008.
Winning with Storage Foundation 5.x – 4.x End Of Life Process Winning with Storage Foundation 5.x.
NOS Report Jeff Koerner Feb 10 TG Roundtable. Security-wg In Q a total of 11 user accounts and one login node were compromised. The Security team.
Internet Traffic Management and Accounting at UNSW David Rees Senior Network Engineer.
CRICOS Provider Code: 00113B Internet Traffic Management and Accounting at Deakin University QUESTnet & AARNet Workshop Brisbane – August 2012 Paul Fikkers.
To provide the world with a next generation storage platform for unstructured data, enabling deployment of mobile applications, virtualization solutions,
Microsoft Partner Conference Integrated Innovation Don Kerr Partner Technology Specialist.
Title in Sergoe, white, shadow, 36 Presentation title goes here, using Segoe Regular, in sentence case. Integrated Innovation Mark O’Shea Partner Technology.
Introduction to Avaya’s SDN Architecture February 2015.
©2010 Check Point Software Technologies Ltd. | [Unrestricted] For everyone Endpoint Security VPN R75 (SecureClient Next Generation)
HotSpot Software HotSpot Billing Software helps you control and bill Internet access by redirecting your customers to sign-in or pay on your login page.
CONTRACT CONTROL. IPM Global – Why IPM Exists We believe Project Management Software should be easy to use. We believe Software should be flexible, and.
Technology Requirements for Online Testing Training Module Copyright © 2014 American Institutes for Research. All rights reserved.
Wyoming Technology Readiness February Agenda Wyoming Training - Feb Technology Readiness  Schedule of events  Components and System Requirements.
Page PearsonAccess™ Technology Training Online Test Configuration.
Page ADP Technology Training. 2 Page2 Confidential Copyright © 2007 Pearson Education, Inc. and/or one or more of its direct or indirect affiliates. All.
Best SMS Gateway Software Provider Company in India By Aruhat Technologies.
Education Solution.
Welcome.  Henrietta TurnerManager, License Administration Colorado Parks & Wildlife (CPW) IPAWS Project Sponsor  Ken ThomSenior IT Project Manager Governor’s.
Automating Wireless IP Network And Virtualized Mobile Core Functions HetnetIP: Wireless IP Backhaul Management Automation and Multi-tenant Portal.
Labs. Session 1 Lab: Installing and Configuring Windows 7 Exercise 1: Migrating Settings by Using Windows Easy Transfer Exercise 2: Configuring a Reference.
CitiBuy Support January, 2009 This guide will provide you with a quick overview of the new Support Portal for the Baltimore CitiBuy Purchasing System City.
© 2010 Cisco and/or its affiliates. All rights reserved.
Technology Requirements for Online Testing Training Module Please refer to the revision log on the last slide of this presentation, updated August.
Phase 4: Manage Deployment
Securing the Network Perimeter with ISA 2004
Printer Admin Print Job Manager
Pack Your Park by Modernizing Your Business Online
Getting Started.
GALILEO Approach and implementation
Getting Started.
IT Management, Simplified
Presentation transcript:

Information Services Internet Accounting Workshop 1 st Feb 2011 Peter Kurtz Manager, Network & Communication Services

Implemented in yrs ago Manages usage Staff & Students Semester based student quota determined by enrolled subjects Avg 450M per month Staff have unlimited usage Students are cut off if go over quota Students can purchase quota ($8/G) Records staff usage for charge-back to Schools & Divisions Web based logon for staff and students Internet Access Service

Information Services IAS Web login Auto logon for smart phones As of Jan 2011 auto logon for wireless devices has been configured

Internet Usage

Internet Service Usage 2010 Usage peaking at 385M (38%) Sep/Oct Average 60Mbps Maximum 385Mbps 2010 Internet Usage Internet Usage Sep/Oct 2010

GU Webwasher / Cache Information Services June 2010 purchased a new Webwasher system (web coaching) Dec 2010 implemented a combined Webwasher system proxy service Used McAfee Web Gateway – WG5500

Information Services Drivers for Change IAS hardware/software system is EOL Call Accounting & Directory System is EOL IAS system can’t scale to support future growth o Student Nos expected to increase 35,000 to 40,000 by 2013 o Internet usage expected to increase by 50% by 2013 o Major insourced IT services expected to move to the cloud IAS Client experience could be better Staff and students have to manually login/off using web interface Students can only top up their usage at the Library Cashier Student and Staff can only obtain basic usage details

Information Services Project Objectives Internet Access Service Improvements o Improve system performance, scalability & uptime o Improve flexibility in the provision of Internet accounts (visitors) o Seamless Internet access for students & staff o Shape Internet access when students exhaust their quota Implement a Data & Voice Billing System o Provide user portal functionality (increase quota, voice & data usage) o Automate report generation (Internet, Mobile, Phone usage) o Improve logging functionality, user tracking & charging

Information Services Proposed IAS System

Information Services Top Customer Requirements 1.Seamless Internet access using multiple access methods (802.1X / Web) over different OS (Windows, Mac and Linux) 2.Automate quota threshold notifications for client groups 3.Provide a unified billing package for voice/data services 4.Self Help portal to provide online quota purchases 5.Display real time usage details online and via 6.Shape access where Internet quota has been exceeded 7.Provide voice and data billing reports to users and supervisors

Information Services Top Technical Requirements 1.Handle and process Internet traffic at 10G 2.Support AARnet's Internet charging model using Border Gateway Protocol communities or file import (on-net, off-net and off-peak) 3.Inspect & identify Internet traffic down to the protocol level including support for multicast and IPv6 4.Web-based components of the IAS solution can be deployed behind a load-balancing solution (F5 BigIP LTM) 5.Support standard monitoring tools through open APIs and MIBs to enable integration into the Griffith University Network Management System

Information Services Top Support Requirements 1.Be available 24hrs a day, 7 days a week 2.Account for Internet traffic in the event of a disruption 3.Support regular updates of the underlying operating systems 4.Vendor support resources within Australia 5.Well established troubleshooting, escalation & problem resolution 6.Provide extensive documentation & training services

Information Services Any Questions?