HFM-EuCARD, GdR, 14 October 2010 11 EuCARD magnet development Gijs de Rijk CERN EUCARD - HE-LHC'10 ACCNET MINI-WORKSHOP ON A “HIGH-ENERGY LHC” Malta, 14-16.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Optimisation of Roebel cable for HTS accelerator magnets
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Superconducting Large Bore Sextupole for ILC
EuCARD 2012 Collaboration Meeting Warsaw University of Technology 22 th April 2012 WP-7 / Task 4 Very high field magnet Introduction/objectives/partners.
EuCARD’13, Progress--HFM, 11 th June 2013, GdR 1 Progress in EuCARD and plans for EuCARD2 Gijs de Rijk 11 th June 2013 CERN.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
October 30 th Advances in Heat Transfer in High Field Accelerator Magnet B. Baudouy CEA/Saclay - Dapnia/SACM Annual meeting CARE October.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
EuCARD2 Magnet Status and action plan
Superconducting R&D – Now Strand and Cable R&D FERMILAB Magnet Systems Department – Now SC Materials Department (TD) HTS Insert Coil Test in External Solenoid.
Towards Nb 3 Sn accelerator magnets, challenges & solutions, history & forecast Shlomo Caspi Superconducting Magnet Group Lawrence Berkeley National Laboratory.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Dr Owen Taylor Institutes Science and Technology Facilities Council (STFC) UK –Daresbury.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
Irradiation of insulators for EuCARD Workshop on Accelerator Magnet, Superconductor, Design and Optimization CERN Maciej Chorowski, Jaroslaw.
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
CERN Accelerator School Superconductivity for Accelerators Case study introduction Paolo Ferracin CERN, Geneva Claire Antoine
HFM-WP7 Status, FK & GdR, April WP7 HFM Status F. Kircher (CEA Saclay) and Gijs de Rijk (CERN) EuCARD Annual meeting RAL, April 2010.
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.
WAMSDO-2013, New Techniques, GdR WAMSDO, January 2013 Gijs de Rijk CERN 1 NEW TECHNIQUES.
Harold G. Kirk Brookhaven National Laboratory High-Field Solenoids for a MC Final Cooling System AAC 2012 Austin, Texas June 11-15, 2012.
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
AccNet-HE, , Magnet R&D Eu, GdR Joint Snowmass-EuCARD/AccNet-HiLumi LHC meeting 'Frontier Capabilities for Hadron Colliders 2013’ February.
BNL High Field and HTS Magnet Program Ramesh Gupta BNL, NY USA H T.
CERN Accelerator School Superconductivity for Accelerators Case study 3 Paolo Ferracin ( ) European Organization for Nuclear Research.
HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC High Field Magnet program and HE-LHC Luca Bottura & Gijs de Rijk CERN 1.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
CEA DSM Irfu - J-M Rey - EUCARD WP 7 Meeting - GRENOBLE 22/03/ HTS insert preliminary design and solenoid prototypes Mélanie Bruchon, Sandrine Cazaux,
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
Fresca2 Technical meeting, 9 th june 2015, Gdr, relevance for FCC 1 Relevance of SMC/RMC/Fresca2/Inserts for FCC Gijs de Rijk 9 th June 2015 CEA Saclay.
CERN plans on high field magnet development ¤ Present situation of the LHC ¤ Sc magnet activities beyond LHC start ¤ R&D topics ¤ On going ¤ Conclusions.
Next Steps in Magnet R&D Steve Gourlay LBNL EuCARD Workshop on a High Energy LHC Malta October 14, 2010.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
EuCARD WP 7 – High Field Magnets Task 7.2 Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2 Status report EuCARD HFM collaboration.
Report from Session 2 Main Dipoles. P. McIntyre 2005 – 24T ss Tripler, a lot of Bi-2212, Je = 800 A/mm2 E. Todesco T, 80% ss 30% NbTi 55 %NbSn.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The air core magnets.
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
A model superconducting helical undulators wound of wind and react MgB2 and Nb3Sn multifilamentary wires Center for Superconducting & Magnetic Materials.
The R&D programme on High Field Magnets (HFM)
Task T HTS Dipole Magnet Design and Construction
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
WP-7 / Task 4 Very high field magnet
Task 6: Short period helical superconducting undulator
Task 6: Short Period Nb3Sn Superconducting Helical Undulator
EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task summary
To be presented at Nb3Al R&D Review,
EuCARD2 WP 10.2 HTS Conductor
Qingjin XU Institute of High Energy Physics (IHEP),
Presentation transcript:

HFM-EuCARD, GdR, 14 October EuCARD magnet development Gijs de Rijk CERN EUCARD - HE-LHC'10 ACCNET MINI-WORKSHOP ON A “HIGH-ENERGY LHC” Malta, October 2010

HFM-EuCARD, GdR, 14 October 2010 EuCARD WP7 High Field Magnets 2 HFM: Superconducting High Field Magnets for higher luminosities and energies, 13 partner collaboration, CEA, CERN, CNRS-Grenoble, Columbus, BHTS, INFN-LASA, KIT, PWR, SOTON, STFC-D, TUT, UNIGE 5 R&D tasks: 2.Support studies, thermal studies and insulation radiation hardness 3.High field model: 13 T, 100 mm bore (Nb 3 Sn) 4.Very high field dipole insert (in HTS, up to ΔB=6 T) 5.High Tc superconducting link (powering links for the LHC 6.Short period helical superconducting undulator (ILC e + source) Duration: April 2009 – April 2013 Budget 6.4 M€ total, 2.0 M€ EC contribution.

HFM-EuCARD, GdR, 14 October Task 3: High field model (1) Jean-Michel Rifflet (CEA)CEA, CERN, PWR Objective: Design, build and test a 1.5 m long, 100 mm aperture dipole with a design field of 13 T, using Nb 3 Sn high current Rutherford cables. The key component in a SC magnet is the conductor. In order to develop high field magnets it is essential to have a facility to tests the cables (not ‘just’ the strands) up to the maximum field. This magnet is intended to replace the present 10 T magnet in the Fresca cable test station at CERN. The target field for EuCARD is B=13 T but the real target is B max =15 T. 3

HFM-EuCARD, GdR, 14 October 2010 Task 3: High field model (2) A 15 T magnet with a 100 mm bore is a challenge. It is important to learn from existing HFM projects 2 approaches: –Classical: scale up from magnets with a cos  coil –Innovative: design a block coil (working models exist) Issues: –Conductor (quality and availability) –B max on coil –Forces and stresses –Stored energy –Quench protection –“makebility” 4

HFM-EuCARD, GdR, 14 October Task 3: High field model: coil design 5 Design version sequence for the coil 1.  June 2010: Cos  vs Block coil (156 turns per pole, 2 double layers) 1.Cos  turns, first cable at 60 mm 2.Block coil turns, first cable at 60 mm choice based on winding tests 2.Summer 2010: Block coil 156 turns : , 56 mm 3.October 2010: Block coil 156 turns : , 58 mm

HFM-EuCARD, GdR, 14 October 2010 High field model: Structure design 6

HFM-EuCARD, GdR, 14 October 2010 High field model: 2D stress analysis Global study at CEA Details (of components) at CERN Stress in coil and structure in the lifecycle: –Room temp. with prestress (bladder and keys), –at 4.2 K, –at 2.6 T, 6.5 T and 13 T 7

HFM-EuCARD, GdR, 14 October 2010 High field model: 3D design Making a detailed 3D model is important: the devil is in the detail 3D turn by turn model 8

HFM-EuCARD, GdR, 14 October Task 3: High field model: planning 2010: detailed magnet design (20-21 Jan 2011 design review) Structure ready by 30 April 2011, LN2 test with dummy coil April-June 2011 Components and tooling design: Nov March 2011 Conductor procurement ongoing (2 vendors) –deliveries: Sept10, Dec 10, March 10, July11 (2x15 km), Nov11 (40 km) –This is the critical path for the project First double pancake coil (½ pole) : end March 2012 Assembly first full coil set in magnet: end Febr 2013 First full test: April

HFM-EuCARD, GdR, 14 October Task 4: Very high field dipole insert (1) 10 Pascal Tixador (CNRS Grenoble-INPG )CNRS, CEA, KIT, INFN, TUT, UNIGE,PWR Objective: Design and realization of a high temperature superconductor (HTS) very high field dipole insert (6-7 T), which can be installed inside the 13 T Nb 3 Sn dipole of task 3 This is a very first attempt to approach 20 T in a dipole geometry. (13 T + 6 T or 15 T + 6 T) Very challenging Issues: I c of the HTS conductor: need an averaged J c of ~300A/mm 2 HTS coil fabrication Forces ( ~1000 t/m) Fixing into dipole Coupling, quenching First make small solenoids and only then a dipole

HFM-EuCARD, GdR, 14 October Task 4: Very high field dipole insert (2) Conductor procured for characterization (CERN & CNRS) - Bi-2212 round wire, 37 x 16 filaments (25 %) OST ( m) Nov YBCO coated conductors SuperPower (3 x 100 m) February 2010 AMSC (2 x 38 m) Dec 2009 ( CNRS order) 11

HFM-EuCARD, GdR, 14 October Task 4: Very high field dipole insert (3) 12 Characterization: Measurements at the various labs Cross calibrations in progress Understand differences between vendor and user measurements Quench modelling: TUT and INFN have each a model: Benchmarking on a Nb-Ti solenoid Insert quench (T hot spot) studies (depends on conductor used and properties data) outsert quench interference on insert: study in progress First result: Insert will fully quench and thus be autoprotected Critical characteristics of SuperPower tape 4.2 K: CERN, T > 4.2 K: CEA

HFM-EuCARD, GdR, 14 October Task 4: Very high field dipole insert (3) 13 Test of solenoid inserts under high B New Large” Variable temperature cryostat in 20 T, 160 mm high field LNCMI Grenoble 20 T High field magnet, Ø bore =160 mm Variable temperature (4.2 K - 80 K) Gas and conduction cooling Outer cold Ø ~ 130 mm First YBCO test solenoid was made (Øi = 22 mm, Øe = 52 mm, h = 37 mm) with 3 double pancakes and 2 end pancakes some issues with local damages Connections to be improved

HFM-EuCARD, GdR, 14 October Task 4: Very high field dipole insert (4) Dipole insert Magnet design: Various options being studied: prospecting as nobody did this before ! A design was made using uses 12 mm wide YBCO coated conductor The 6 T central field can be reached with 250 MA/m 2 as overall current density. The internal aperture is 20 mm in diameter. The current in a 12 mm tape is 610 A The HTS dipole in inside a 3 mm thick steel tube to contain the Lorentz forces ( MN/m) (in B=13 T from the outer dipole) 14

HFM-EuCARD, GdR, 14 October Task 2: Support studies (1) Macej Chorowski & Jarek Polinski (PWR) PWR, CEA, CERN sub-tasks: Radiation studies for insulation and impregnation 15 1)Workshop on insulator irradiation 4 th Dec 2009 at CERN 2)Radiation Working Group created 3)List of 7 candidate insulators (impregnation schemes) established for possible usage in accelerator magnets 4)Literature search for insulator irradiation tests done (PWR) 5)Dose spectra for LHC upgrade situations made available 1)RAL mix 71 ; DGEBA epoxy + D400 hardener 2)Epoxy TGPAP-DDS(2002) 3)LARP insulation; CTD101K + filler ceramic 4)Cyanite ester (pure) AroCy L10 5)Cyanite ester epoxy mix T2 (40% AroCy L10) 6)Cyanite ester epoxy mix T8 (30% AroCy L10) 7)Cyanite ester epoxy mix T10 (20% AroCy L10)

HFM-EuCARD, GdR, 14 October Task 2: Support studies (2) 6)Irradiation sources selected (IJP, Swierk, Po) 7)Equivalent doses known (50 MGy) (CERN simulations Cerutti at al.) 8)Irradiation program established ( samples sizes, sample materials ) 9)Test cryostat for mechanical and electrical tests designed 10) Manufacture of test plates started (RAL, S. Canfer et al) (in common with the thermal sub-task) 16

HFM-EuCARD, GdR, 14 October Task 2: Support studies (3) 2)7.2.2 Thermal studies 1)CEA-Saclay has started the thermal test of unirradiated samples of insulation material candidate RAL mix 237 2)PWR is commissioning a new cryostat for thermal tests 3)CEA Saclay continues developing the thermal model of the magnet coil for steady state conditions (2D conduction model without helium) 3)PWR and CERN are developing the superfluid and helium solvers in OpenFOAM code 17

HFM-EuCARD, GdR, 14 October Task 5: High Tc superconducting link (1) DESY has left the task due to lack of interested personnel, the 11 PM were re-distributed over CERN and SOTON Conductor choice: between Y-123, Bi-2223 and MgB 2 all pre-reacted and in the form of tape Long lengths (> 1 km) of MgB 2 tape from Columbus and of Bi-2223 tape from BHTS are available. Short lengths of Y-123 tape from BHTS are available from stock A set-up for the electrical characterization at liquid nitrogen temperature of long lengths of Bi-2223 and Y-123 tapes is available at BHTS 18 Amalia Ballarino (CERN) CERN, COLUMBUS, BHTS, SOTON

HFM-EuCARD, GdR, 14 October 2010 Task 5: High Tc superconducting link (4) 19 Semi-horizontal link ( m) Vertical link H = 100 m 1.1 mm MgB 2 wire Courtesy: A. Ballerino SC links needed for the LHC upgrade: Directly linked to this task

HFM-EuCARD, GdR, 14 October 2010 Task 6: Short period helical undulator (1) Short period undulator for the ILC positron source Jim Clarke (STFC-DL) STFC (DL and RAL) Period 11.5 mm, field >1 T Aim : fabricate and test a short helical undulator prototype using Nb3Sn wire. With: 11.5 mm period and winding bore of 6.35 mm. Nb 3 Sn usage for high current density and large thermal margin to go higher than the 1.15 T achieved for Nb-Ti Primary challenges: Nb 3 Sn insulation system (compatibility with heat treatment at 650C) Thin insulation (high current density). 20

HFM-EuCARD, GdR, 14 October 2010 Task 6: Short period helical undulator (2) Electromagnetic design done –Cu beam pipe –Steel helix –27 turns of 0.5 mm strand –Field on coil ≅ 4T Conductor selected Conductor characterization in progress Insulation mm braided glass fibre Winding tests in progress Reaction and impregnation tests soon to follow. 21

HFM-EuCARD, GdR, 14 October 2010 EuCARD-2 ?! 22 ESGARD request for ideas for an EuCARD successor FP7 call end of 2011 Probably less budget available than for EuCARD