HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

Slides:



Advertisements
Similar presentations
HIGH RADIATION TO MATERIALS WG3 – E XPERIMENTAL A REA HiRadMat project Team Meeting 03/0/2011 T9 transformation Repeatability test of experimental area.
Advertisements

HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA DESIGN Ans Pardons HiRadMat review, 26 th of May 2011 Outline  Location of experimental area & services.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
Collimation Meeting Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility M. Cauchi, D. Deboy, on behalf of the Collimation Team.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
3/7/2002SLTC1 An LHC Beam-Beam Long- Range Simulator for the SPS Miniteam: J-P Koutchouk/BI, G. de Rijk/MS, F. Zimmermann/AP Tech. Coordination: J. Camas/BI.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Compressor status AWAKE Technical Board meeting 19 August 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
RaDIATE October Technical MeetingOctober BLIP Irradiation Planning Radiation Damage In Accelerator Target Environments.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
HRMT "RodTarg“ Technical Board – Feb. 2 nd 2015 Claudio Torregrosa Martin, Marco Calviani, Antonio Perillo-Marcone, Mark Butcher (EN/STI), Luca.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Governance.
AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
News and hot topics Impedance meeting 14/04/2014.
6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
HIGH RADIATION TO MATERIALS 20 TH P ROJECT T EAM M EETING – O CTOBER 14, 2010 Project Team Meeting CERN, October 14, 2010  Beam requests - operation I.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD2 ColMat HDED.
HIGH RADIATION TO MATERIALS Ans Pardons for the HiRadMat project team IEFC Workshop, March 22, 2011 Outline  The HiRadMat facility – Why, What, When,
The HiRadMat Facility Outline  Location  Status  WANF dismantling  Beam line  Experimental area  Schedule  Project management S. Evrard – EN/MEF.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
SPSC114 summary for EATM Lau Gatignon / EN EATM, 15 July 2014 Open Session:OPERA, ICARUS, NA63, COMPASS, CLOUD, P349 (pbar polarization) Closed Session:Neutrinos.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
Adrian Fabich HiRadMat Technical Board CERN, 15th Sep 2016
STI test HRMT-35 and Collimator plans for 2017 Special ColUSM: Material and design readiness for LS2 productions 2th May 2017 I. Lamas Garcia,
Linac4-PSB 160 MeV connection readiness review
Installation new BTV HiRadMat from 2017
HiRadmat requests A. Fabich MSWG, 30. January 2015.
Motivations and Introduction to MultiMat Experiment in HiRadMat
ELENA installation and commissioning status
Proposal TDIS-TZM WP14 TDIS jaw validation testing
TDI Coating test at HiRadMat Proposal 1605 HRMT-35 HiRadMat Technical Board Meeting 15th September 2016 EDMS I. Lamas Garcia, M. Butcher,
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Overview Some useful presentations: Public overview – coffee meeting
Radiation-safe area for electronics, or laser or
CNGS Proton Beam: Introduction
Present and Future test facilities for High-intensity Targetry CERN
Experimental Areas – LS2 planning
Beam Line to the HiRadMat Test Facility
HiRadMat HiRadMat Super Cycle: HRM_LS = 22.8 s, SFTPRO = 10.8 s, MD cycle = 7.2 s → TOTAL = 40.8 s Experiment Number of 288 Bunch Pulses Estimate time.
Summary Tuesday h23: Machine closed. Precycle started.
A. Fabich EuCARD-2 annual meeting 2017, Glasgow
Presentation transcript:

HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement

HiRadMat remainder HRM-TB 2. Feb. 2015A. Fabich2 HRMT 10 – WTHIMBLE – Preparing for PIE HRMT 14 – LCMAT – Exp. Cubicle hosted in build 954 – Mobile table 02 to be recuperated – Use again for HRMT23 HRMT 09 – LCOL – Exp. Cubicle hosted in build 954 – Mobile table 02 to be recuperated, to be returned to HRM HRMT 12 – LPROT – Hosted in TNC – cool-down – Recuperated “today” – EDMS – Table 04 returned to HiRadMat WANF blocks – Disposal scheduled January 2016 – Preparations to be discussed with DGS/RP now

Feed-throughs - status Infrastructure installation removed – (water cooled) cabling – Water piping – Cable trays Drilling w7-8, completed until 19 th Feb Cabling between TNC and TT61 – NE48 x 6 – Additional star point in TT61 – Electricity available – ? Specifications of the transparent feed-through window? – Additional users’ needs? submit to for 6/2/2015A. Fabich3

Demin. water Nous avons 35kW de puissance de refroidissement disponible au niveau des tables avec un débit max de 3m3/h à 27°C. Nous pouvons avoir une pression max à l’entrée de la table à 9 bars. 6/2/2015A. Fabich4

HiRadMat beam times in 2014/2015 6/2/2015A. Fabich5 15 proposals received – including 2 parasitic experiments – HiRadMat Scientific And Technical Committee 9 proposals fully approved Proposals received most recently will be reviewed in the coming months Accumulated SPS cycle time 2012: 48 hours 2014: 8 hours (estimate) 2015: 75 hours (estimate) BLM TPSG4 GlassyC windows BPM diamond Berrylium samples Supra sextupole Collimator jaws Rotating collimator AD target UA9 crystal Microphone High power target Fiber BLM TDI Collimator materials

Proposals 6/2/2015A. Fabich6

6/2/2015A. Fabich7 7 HRM slots Every 4-5 weeks

Scheduling 6/2/2015A. Fabich8 Slots every 4-5 weeks – limited by RP aspects – HRM personnel resources Overall interest being scheduled end 2015 – Highest intensities available – Readiness of experimental HW

Assigned beam slots 6/2/2015A. Fabich9 confirmed

HRM-TB 2. Feb. 2015A. Fabich10

Users’ BPM 6/2/2015A. Fabich11 Requested so far by – proposal 1409 – RodTarg – HRMT24 – BeGrid – proposal 1420 TCDI/TDI – Proposal UA9

BPM requirements 6/2/2015A. Fabich12 ABSOLUTE beam position ~0.1 mm – wrt to experimental setup (metrology) – As close as possible to the experimental setup – just upstream – Integrated in an (typical) experimental setup – on the mobile table ONLINE Single bunch resolution In the full range of the beam parameter space bunches/pulse ppb Provision/maintenance by BE/BI based on standard equipment/procedures Available by August 2015 for commissioning Write-up to be discussed in week Requirements will be presented to BI techn. Board on 19 th Feb.