Kaizen SMED Forms FORMS.

Slides:



Advertisements
Similar presentations
Airbus Production System
Advertisements

Standard Work Making the “new way” become the standard way
Total Productive Maintenance
ISO 9001:2000 Certified Next Steps? Where do we go from here?
Overall Equipment Effectiveness (OEE) 1 OVERALL EQUIPMENT EFFECTIVENESS (OEE) Factory Pulse Logix Automation Systems Pvt. Ltd.
Overall Equipment Effectiveness (OEE)
Supplier Development Kaizen Implementation Kit
WHAT IS TPM. W H A T I S TPM ? A well defined methodology to optimize resources & improve performance A culture change - “never be satisfied” Team-work.
Lean Manufacturing Cellular Manufacturing One Piece Flow for Workteams
TOTAL PRODUCTIVE MAINTENANCE
ABB Reliability Fingerprint
 2000, QualityToolBox.com, LLC, all rights reserved 1 A STRATEGY FOR PERFORMANCE EXCELLENCE ( One Step Setup) Set-up and changeover reductions for equipment,
10/20/20081 Lab 6 – More State Machines. Multiple processes.
Problem solving tools 1 Problem solving tools We need tools to: –improve designs: increase the chance that we are making what the customer wants. –identify.
10/13/ Lab 6 - Algorithmic State Machines ECE238L 10/13/2009.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 13 Tools for Process Improvement.
Lean Training Standard Work. Agenda What is it? What’s it for? How does it work? When do you use it? What’s an example?
Total Productive Maintenance OVERVIEW. Target Audience : Senior Management Purpose of Module : To understand the need for TPM and the commitment required.
How to Effectively Implement Set-up Reduction in Any Organization.
BASIC KAIZEN TOOLS TARGET PROGRESS REPORT STANDARDIZED WORK SHEET
Total Productive Maintenance (TPM)
Process Management Process improvement (for Chronic problems) Process control (for Sporadic problems)
Tools and Techniques for Performance Excellence
What are the Benefits? Action AKA TPM, Total Preventative Maintenance Total Productive Maintenance Breakdowns 1 Setup / adjustment 2 Idling / minor stoppages.
9/10/2015 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequel.
1 Maintenance Performance Measures Management needs information of maintenance performance for planning and controlling the maintenance process. The information.
Overall Equipment Effectiveness
Nyttige implementeringsværktøjer Praktiske eksempler fra Lean Six Sigma Bo Maach-Møller.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
Total Productive Maintenance (TPM)
TPM is a new technique of equipment maintenance that strives to achieve perfect production:  No Breakdowns  No Small Stops or Slow Running  No Defects.
10/25/2015 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequel.
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Activity Of The Product. 2freeleansite.com Activity Of The Product Activity of the product focuses the “Product or Thing” from “start” to “finish”. -
Multi-company Project Management applied to Manufacturing Improvement
1 Project Management C53PM Session 3 Russell Taylor Staff Work-base – 1 st Floor
 Discussion 40 minutes  Break 10 minutes  Discussion 40 minutes  Will understand what Standard Work is, and is not  Will be able to study and understand.
Chapter 13 Tools for Process Improvement MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1.
Introduction to OEE (Overall Equipment Effectiveness)
KANZEN INSTITUTE ASIA PACIFIC 1 What is OEE ? OEE Overall Equipment Effectiveness Why is a high OEE important for the department ? OEE Calculation How.
Why Measure?. What Would You Do First? What Would You Do First?
Key Performance Indicators will: Provide performance measurements for all core processes. Add value for our customers and the company. Support company.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
Sustain & Spread Implement/ Control Test Changes Develop/ Identify Changes Assess High Level Project Timeline PROJECT TITLE Project Co-Leads: Sponsor:
WORK STUDY HOW THE TOTAL TIME OF A JOB IS MADE UP (IE411)
Ordering Process Dep. At Atlas Copco
Six Sigma Approach.
Problem Solving Sheet Guidelines
IENG 451 / 452 Stability: Total Productive Maintenance
TOTAL Productive MAINTENANCE
Dr. S. Poornachandra Dean EIE & BME SNS College of Technology
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
Name of Machine or Process Sub-title Name of Company
IENG 451 / 452 Standardized Work: TAKT Time, Standardized Work Charts
Manufacturing Planning
Total Productive Maintenance © Imants
Service for increased productivity
PROJECT SCOPE Scope : SMT Machine in both plant I and plant III.
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
DMAIC STANDARD WORK TEMPLATE
Name of Event Name of Event
Department | Website | Phone Number
Service for increased productivity
DMAIC STANDARD WORK TEMPLATE
4/29/2019 Overall Equipment Effectiveness (OEE) “Strategic Management is an exciting process that allows an organization to be proactive rather than.
OVERALL EQUIPMENT EFFECTIVENESS (O E E)
Name of Event Name of Event Date, location, department
5/10/2019 Overall Equipment Effectiveness (OEE) “Strategic Management is an exciting process that allows an organization to be proactive rather than.
LEAN Principles Total Productive Maintenance (TPM)
Presentation transcript:

Kaizen SMED Forms FORMS

WASTE ANALYSIS Event: Team: Date: Location:

OPPORTUNITY SELECTOR No Opportunity Ref No Opportunity Ref Event: IMPLEMENTATION REF Event: Team: Date: Location: No Opportunity Ref No Opportunity Ref

ACTION CHART Event: Team: Page of Date: Date: Location:

ACTION CHART No. Comment Measure Who When Prog. Event: Team: Page of Date: Date: Location: No. Comment Measure Who When Prog.

SPAGHETTI DIAGRAM Process: Team: Date: Location:

OPERATIONAL SEQUENCE CHART Process: Team: Date: Location: Operation:

SMED SET-UP TIMES Part: Team: Tool: Date: M/C:

TOTAL PRODUCTIVE EFFECTIVENESS Process: Team: Date: Location: Availability Rate: (Equipment failure, Set-up & adjustment, Tool change, Start-up) Available Time - Down Time = Availability Rate % = Available M/C Time X = TPE % = Standard Time x Units made = Performance Rate % = Operating Time Performance Rate: (Minor stops & idling, Speed loss) Parts Count - Defects = Quality Rate % = Parts Count Quality Rate: (Scrap & rework) Alternatives: Performance Rate = (Op Time - Perf. loss)/OpT Quality Rate = (Productive time - Defect time)/Prod Time

TPE OBSERVATION Equip.: Name: Date: Part: Start End Run Time Equip Failure Set-up/adjust Tool Change Start-up loss Avail. Loss Stops/Idling Speed loss Perform. Loss Scrap/Rework Quality Loss Remarks

Effectiveness Improvement Sheet Department: Machine: Date: Eater Problem Description and suggested improvement Job begins on the Job ends Time Before Time After Improvement Dates Measurement downs, Start-up Break- Change Tool Adjustment Set-up & stoppages and speed Idling, minor loss Scrap & Rework Process owner Responsible for follow-up