The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.

Slides:



Advertisements
Similar presentations
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
Advertisements

DOUG BOSWELL MECHANICAL OPTION APRIL 16, 2008 Temple University Tyler School of Art.
Chilled Beam Presentation
The Hearst Tower 959 Eighth Avenue New York, NY
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
Stanley A. Mumma, Ph.D., P.E. Prof. Emeritus, Architectural Engineering PSU, Univ. Park, PA Web: Chilled Surfaces:
BRE Energy Efficient Office of the Future
1 Meeting ASHRAE Fundamentals, Standard 55 & 62.1 with Chilled Beams Displacement Ventilation.
BIMception Proposal Thomas Villacampa Alexander Stough Christopher Russell Stephen Pfund.
Morofsky1 Low-energy Building Design, Economics and the Role of Energy Storage Canadian possibilities based on the Model National Energy Code for Buildings.
Jacksonville, FL The Pennsylvania State University Department of Architectural Engineering Zachary Polovchik Mechanical Option Advisor – Dustin Eplee Duval.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
BENTLEYVILLE, PENNSYLVANIA KYLE COURTNEY | MECHANICAL OPTION | DUSTIN EPLEE.
North Pocono High School
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
HVAC for Educational Facilities
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
SENIOR THESIS PRESENTATION
Brian Ault – Mechanical OptionSpring 2008 Senior ThesisBarshinger Life Science & Philosophy Ann & Richard Barshinger Life Science & Philosophy Building.
Name of Building(s) or Project Speaker(s) Organization(s)
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
NRUCFC Headquarters Building Sterling, VA Architectural Engineering Senior Thesis Margaret McNamara | Mechanical Option Advisor | Dr. Stephen Treado.
Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.
Army Reserve Center Newport, Rhode Island Alexander Hosko Mechanical Option.
Des Places Residence Hall Duquesne University Pittsburgh, PA Peter Edwards – Mechanical Option Advisor - Dustin Eplee Des Places Residence Hall Senior.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
University of Delaware Center for the Arts Newark, DE Karen Schulte Mechanical Option Spring 2006.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Naval Network & Space Operations Command (NNSOC) Christopher Ankeny Lighting/Electrical Option Senior Thesis 2007 Advisor: Dr. Richard Mistrick Electrical.
Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
The regional learning alliance At Cranberry Woods. CAITLIN HANZEL MECHANICAL OPTION THE PENNSYLVANIA STATE UNIVERSITY THE DEPARTMENT OF ARCHITECTURAL ENGINEERING.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Alexander Radkoff Mechanical Option | Spring 2014 Advisor: Dr. Stephen Treado 123 Alpha Drive Pittsburgh, Pennsylvania
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Villanova University: School of Law Jason Greer The Pennsylvania State University Architectural Engineering Lighting/Electrical Option Senior Thesis –
Maryland Transportation Authority Police Training Facility
Harley-Davidson Museum
ENVIROCENTER PHASE II JESSUP, MD
David Anderson Mechanical Option
Redifer Commons Addition & Renovation Project
Grunenwald Science and Technology Building
Conduction Cooling Loads
Iron Forge Educational Center: U. S
The Benefit of Including Energy Recovery System Analysis
Biobehavioral Health Building, University Park, PA
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
Senior Thesis Presentation
Architectural Engineering, The Pennsylvania State University
RiverView Condominiums II Chicago, IL
Presentation transcript:

The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.LCC 6.Pros versus Cons The Sunshine Elementary School is located in Climate Zone 5. The design has met all ASHRAE requirements of this climate zone. ASHRAE Climate Chart (Fundamentals, 2009) General Information of Project Size- 103,000 Square Feet 2 Levels Overall Cost- $16,599,000 Brick Facade Gable Roofs Construction Dates- March June 2011 Silver LEED Accreditation Goal

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.LCC 6.Pros versus Cons Water-to-Air Heat Pumps Tied to Ground Loop Original Design Components 144 Vertical Geothermal Wells- 12 x 12 grid Water-to-Air Heat Pumps- each room Energy Recovery Units CO 2 Sensors AHU’s for gym and cafeteria eQuest © Energy Model- LEED approved 42% more efficient then Baseline Model

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.LCC 6.Pros versus Cons Radiant Heating and Cooling Enough Capacity? Radiant heating and cooling was designed in the gymnasium, 1 st through 5 th grade classrooms and kindergarten classrooms.

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.LCC 6.Pros versus Cons Using coefficients found by Bjarne W. Olesen the Radiant heating and Cooling capacities were found. The cooling Capacity of a radiant slab is less then that of heating. Radiant Capacity = Coefficient* Floor Area * ∆T

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.LCC 6.Pros versus Cons Conditioning Ventilation air will increase the system capacity but will prove to still not be enough. Radiant Capacity + (1.08 x CFM x ∆T) = Total Capacity By adding daylighting controls to the building the peak cooling demand is now met.

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.LCC 6.Pros Versus Cons Low Velocity Displacement Ventilation couples well with radiant systems by increasing the stratification of the space. The combined effect of radiant systems and low velocity displacement ventilation treats the load where the demand is located. (Price, 2007)

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.LCC 6.Pros versus Cons The Air Change Effectiveness (Ez) is increased to 1.2 allowing of 30% increased outdoor air while reducing CFM by 13%. Increased Outdoor Air and contaminant controls greatly improves the indoor environment. (Price, 2007)

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.LCC 6.Pros versus Cons Additional benefits are added by reducing needed ductwork to typical classrooms. Original DuctworkRedesign Ductwork Without the need for ductwork above the suspended ceiling building height can be lowered by 32”.

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.LCC 6.Pros versus Cons IESNA Lighting Design Guide the task of using a #2 pencil and softer leads is a performance of high contrast and large size. Typical 1 st Classroom South Sept. 21 at 12pm Typical 2 nd Classroom South Sept. 21 at 12pm The North facing classrooms receive less daylight then the South facing classrooms but still have dimming potential. Typical 1 st Classroom North Sept. 21 at 12pmTypical 2 nd Classroom North Sept. 21 at 12pm

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.LCC 6.Pros versus Cons The redesign of the ventilation system changed the noise criteria rating of the air supply to the classrooms. The noise criteria is reduced from a NC-39 to a NC-19 due to more attenuation within the duct work.

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.LCC 6.Pros versus Cons Using RS Means a cost comparison was calculated for all changes made to original design. Overall the redesign was a 5% increase when compared to the initial cost.

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.Life-Cycle Cost Analysis 6.Pros versus Cons Annual Energy Savings of the proposed redesign compared to the original design were calculated. The savings in electric were then calculated using the electrical rates supplied by the designer.

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.Life-Cycle Cost Analysis 6.Pros Versus Cons The Analysis showed a payback period of 10.5 years for the changes to the original design. A Life-Cycle Cost Analysis was performed for the annual energy savings versus initial cost.

Presentation Outline 1.Project Overview 2.Existing Conditions 3.Depth 1.Radiant Heating and Cooling 2.Low Velocity Displacement Ventilation 4.Breadths 1.Daylighting 2.Acoustics 5.Overall Cost 1.Initial Difference 2.LCC 6.Pros versus Cons The increase indoor environment is a major benefit of the proposed redesign. The redesign is considered to be feasible and is recommended. Questions? Increased IAQ Contaminant Control Warm Floor for Kindergarten Increased Thermal Comfort 6% Energy Reduction Con’s 5% Increased Initial Cost Increased Construction Time 30% Increased Ventilation Decreased Mechanical Noise 225K Payback over 25yrs Reduced Absences Increased Test Scores Pros