The problem isn’t just the bridges, or the freight system, it’s about Oregon’s economy and quality of life. Oregon Modeling Steering Committee OREGON DEPARTMENT.

Slides:



Advertisements
Similar presentations
2004 Target Formula Re-evaluation Area Transportation Partnership (ATP) Interviews.
Advertisements

Oregon Freight Plan July 28, Linking Freight Improvements to Economic Growth Travel Time Freight Transportation Improvements Productivity Competitiveness.
State Bridge Program STIP Development Process Oregon Department of Transportation October 3, 2007.
Advancing Alternative Energy Technologies Glenn MacDonell Director, Energy Industry Canada Workshop on Alternatives to Conventional Generation Technologies.
Moving Goods, Creating Jobs: Planning Portland Region Corridors for Economic Growth.
Presented by: Jerri Bohard, ODOT Transportation Development Division Administrator Paul Mather, ODOT Highway Division Administrator Travis Brouwer, ODOT.
Governor’s Freight Industry Summit Draft November 12, 2012 Sandra K. Beaupre’ Wisconsin DOT Governor’s Freight Industry Summit Draft November 12, 2012.
Minnesota Department of Transportation House Transportation Policy & Finance Committee February 23, 2015.
Freight in the Southeast Conference Bob Romig State Transportation Development Administrator Florida Department of Transportation February 9, 2011 Florida’s.
Regional Harmonization Can Yield Multiple Benefits Safety ~ Economy ~ Environment Transportation Infrastructure David Cole Commissioner, MaineDOT Truck.
Economic Analysis Concepts. 2 Is the project justified ?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive.
Designated by US DOT Publication of Draft PFN for Comments - Spring 2013 Initial Designation of the PFN – Fall 2013 National Freight Network Primary Freight.
Freight-Supportive Guidelines ACT Canada – Sustainable Mobility Summit 2012 November 7, 2012 Ontario Ministry of Transportation.
Comprehensive Freight Movement Plan Pennsylvania Rail Freight Seminar May 22, 2013 Pennsylvania Long Range Transportation Plan Pennsylvania Long Range.
Washington State Truck Freight Performance Measure Research Interim Report Dale A Tabat Truck Freight Program and Policy Manager Freight Systems Division.
Transportation Planning Section, Transportation Development Division Oregon Transportation Plan 2005 Modeling Alternative Policy Choices Becky Knudson,
Transportation Planning Analysis UnitPNREC 2006 Transportation Modeling in Oregon: Overview of ODOT Statewide Integrated Model Pacific Northwest Regional.
2015 Interregional Transportation Strategic Plan Active Transportation and Livable Communities August 21, 2014 Scott Sauer.
Transportation Development Division Oregon Integrated Land Use and Transportation Models Part 1: Statewide Model Part 2: MetroScope Part 3: Land Use Scenario.
Framework for Model Development General Model Design Highway Network/Traffic Analysis Zones (TAZs) Development of Synthetic Trip Tables Development of.
COLORADO PERSPECTIVE Cathy Shull Board of Directors Ports-to-Plains Alliance.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Overview of the IT 3 Initiative CONFIDENTIAL Discussion Document September 2008.
WELCOME! Public Informational Meeting July 9, 2003 Davis-Monthan Air Force Base/Tucson Joint Land Use Study.
Transportation/Land-Use Connections Program Program Evaluation Proposal for FY 2009 Program September 5, 2008 Darren Smith, Sarah Crawford Transportation.
Presented to presented by Truck Size and Weight Wisconsin’s Legislative Process AASHTO Subcommittee on Highway Transport 2013 July 10 th Wilmington, NC.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Practical Design in ODOT Roadway Conference April 13, 2010 Cathy Nelson, PE Technical Services Manager/ Chief Engineer.
Florida Transportation Commission TEAMFL January 21, 2011 Stephen Reich, Center for Urban Transportation Research, University of South Florida.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Talking Freight Promoting Economic Revitalization through Enhanced Freight Transportation Eric G. Madden Deputy Secretary for Aviation and Rail Freight.
OREGON ECONOMIC & BRIDGE OPTIONS STUDY The problem is not just the bridges, or the freight system, It is about Oregon’s economy and quality of life. FHWA.
Identifying Priority Projects for Funding Joan LeBlanc GOMC Council Coordinator.
Connectivity & Mobility
Oregon Modeling Improvement Program Oregon Modeling Improvement Program An Innovative Approach to Support Public Policy & Decision-Making Prepared for.
Transportation leadership you can trust. presented to FHWA “Talking Freight” Seminar Series presented by Lance Neumann Cambridge Systematics, Inc. August.
Presentation Topics Oregon Transportation Investment Acts (OTIA) Goals of Statewide Traffic Mobility Program Focus of ODOT’s Mobility Approaches Results.
Statewide Transportation Improvement Program: Proposed Enhance Process for STIP Oregon Transportation Commission Meeting Presented by: Jerri.
Ohio Department of Transportation Steering Committee Meeting #3 Steering Committee Meeting #1May 30, 2012 Steering Committee Meeting #1 WELCOME Steering.
Oregon’s Work Zone Traffic Analysis Program FHWA Work Zone Rule Virtual Workshop November 6, 2008 Irene Toews, P.E. Oregon Department of Transportation.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
Freight Impacts on Ohio ’ s Roadways presented by Suzann S. Gad, AICP The Ohio Depart Of Transportation Office of Urban & Corridor Planning.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
ODOT STIP Process and Funding Jerri Bohard –Planning Section Manager –Transportation Development Division Steve Leep –Program and Funding Services Manager.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Transportation leadership you can trust. presented to Canada/U.S. Transportation Border Working Group presented by Stephen Fitzroy & Brian Alstadt, Economic.
Lakes Region Transportation Workshop November 15, 2013.
Bicycle Advisory Board September 2, 2015 Freight Master Plan.
Regional Funding Allocations 2 TRANSPORT Chris Mitchell.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Transport Integration of cross-border transport infrastructure TEN-T strategy on large cross- border cooperation projects Gudrun Schulze, Team leader,
2060 Florida Transportation Plan Florida Model Task Force Meeting November 10, 2009.
Freight Transportation Plan Savannah, GA AMPO Conference - October 23, 2014.
Addressing Freight in the Planning and Programming Process presented by Jim Brogan Cambridge Systematics, Inc. July 11, 2001 FHWA Freight Planning Workshop.
Presented to presented by Metropolitan Planning Organization Advisory Council January 22, 2015 Jim Wood, Florida Department of Transportation.
Industry Briefing 25 May 2016.
Freight Forum RTC Washoe March 31 st, The reliable, cost effective, and safe movement of goods and products across the State of Nevada and.
0 Freight Activities: Year in Review Dec. 12 th 2015.
Monica Bansal Department of Transportation Planning Presentation to the TPB CAC November 13, 2008 Progress on “CLRP Aspirations” & “What Would it Take?”
Planning Commission Ian Macek May 26, 2016 Freight Master Plan.
Oregon State Rail Plan Update
Freight Transportation Plan Savannah, GA
Oregon Statewide Integrated Model
2011 Prioritization Update to Market Subcommittees
NGTA Halton Planning and Public Works Committee
2017 SCORT Conference Washington, DC
“efficient movement of goods across the entire state of Oregon”
Oregon Freight Plan Amendment
East Coast Route Study November 2016 update.
Gippsland Regional Road Group
Presentation transcript:

The problem isn’t just the bridges, or the freight system, it’s about Oregon’s economy and quality of life. Oregon Modeling Steering Committee OREGON DEPARTMENT OF TRANSPORTATION December 11, 2002 OREGON ECONOMIC & BRIDGE OPTIONS

Restricted/Cracked* Bridges - Today * Medium and high crack density Local Bridges State Bridges Ford’s Bridge Cole’s Bridge Sauvie Island Bridge

Bridge Deterioration would initially Restrict Trucks over 80,000 lbs 1997 Oregon Commodity Flow Truck Survey

MODELING STATEWIDE ECONOMIC IMPACTS Input: Load Limit bridge links in Transport Network Define industry production of “Heavy Goods” Modeled Impacts: Flows: Heavy Trucks detoured - OR- Heavy Trucks lighten loads to avoid restrictions Costs: Increased Shipping costs Increased Production costs Location:Change industry location to reduce costs (in/out of state) Loss of supporting service industries

Initial Model Runs Driven by Bridge Task Force No US97 alternative Functional classification-based Little link to bridge costs

Model Results Statewide Impacts Lighter trucks avoid restrictions, increase truck trips Economic impact of up to $3B in 2025, $17B over 25-years Potential employment loss of 17,000 by 2025 Regional Impacts High shipping costs benefit locations near borders & urban areas Impacts those with highest shipping costs already (heavy goods industry, remote areas) Low shipping costs decentralizes activity Any investment improves state economy Investment location has regional consequences Portland/Willamette Valley - 75% of state production Livability Impacts Detours increased truck miles on unsuitable roads All options increase trucks in habitat/AQ areas

Regional Production Relative to Current Mobility Option TOTALAGFFWOODTECHSERV Allow Deterioration Fix Interstates + Freight Routes +Key Local Routes

Production - All Options

Iterative Model Acceptance BOT Economic SubTeam (October) –Skepticism about unknown model results  Bury Model Results in Appendix Director’s Office (Early November) –Economic/Community impacts are paramount –Use absolute not relative model results –Limit investment options  3 Futures/Courses of Action up-front Flat Funding Flat Funding/Buy Time (proactive posting) Invest Now/Fix All

Regional Production

Local Impacts

Iterative Model Acceptance Met with Trucking Industry Representatives (November) –Concerned with I-5 construction impacts/delays –Backbone Freight Route for all trucks (quick/low cost) BOT Team (Late November) –No recommendation? –No US97 alternative? –Add real-world stories  Create Recommendation with US97 staging for I-5 work  Model one of many tools that led to recommendation

Draft Recommendation Staged Bridge Investment –Open E-W, N-S Heavy Truck Routes ASAP (Replace on I-84, US97, S22) –Incrementally address I-5 (Replace to S58 and link to US97, etc.) –Routes with high cost/benefit –Fix Bridges with unacceptable detours Maintain other key routes, restrict as needed Selected restrictions to extend bridge life

Use of Model Identify the range of impacts –Fix All Bridges (Maximum investment) –Allow Deterioration –Proactively Restrict All Bridges –TBD -- restrict below 64,000 lbs. Statewide Economic Impacts –Damping of State Economy –Employment/Population –Importance of Portland/Willamette Valley connections Sub-State economic trends - industries and regions Temper “sky is falling” approach  Local and impending statewide “crisis”

Lessons Learned New Tool takes time to be accepted/used Model should generate investment options, rather than support a priori expectations Model validation/credibility is critical Need to model “crisis” Model is one of many inputs to process Need time to digest/understand model findings Relative measures difficult to understand

Role of OMSC OMSC Credibility/validation of model structure Past efforts using model OMSC Bridge Sub-Committee Review/assist with model inputs/assumptions Interagency review/comment on model output Recommendations –Importance of Net Present Value and lifecycle analysis –Model output is an incomplete cost-benefit analysis –Suggest/prioritize additional model runs

OVERALL TIMELINE ODOT: Inspect bridges bi-annually or more often cracks identified OTC, Governor, Legislature: Select a strategy to address problem Bridge Task Force: Validate Problem, Emphasize Corridors June 2002 ODOT: Economic and Bridge Options Report Draft: Nov 02 Final: Jan 03 ODOT: Develop implementation strategy. Implement. Track deterioration & priorities. Dec 02 Jan 03 OTC

Extra Graphics

Initial Model Runs