Update of master schedule and report from SLAC G. Riddone 2008.10.08.

Slides:



Advertisements
Similar presentations
F October 4, 2001David Finley to FARDOG at FermilabSlide 1 Status of X-Band Structures Fabrication Our First X-Band Structure Progress of RF Factory at.
Advertisements

ENGINEERING DESIGN OF RF STRUCTURES
TD18 – post mortem analysis Inspection 11WDSDVG1KEK SLAC.
Fabrication and evaluation of HDDS cells Dec. 1012, ISG9, KEK T. Kume, KEK (Presented by T. Higo) Mechanical evaluation of HDDS cells and estimation toward.
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
X-band Structures Test Results at NLCTA Faya Wang Chris Adolphsen, Christopher Nantista 9-Feb-11.
CLIC RF structure master schedule and CERN production
News from structure production task force – T18_CERN G. Riddone on behalf of the task force team GR, BE/RF,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Summary of the change request from KEK KEK suggested 4 changes to be made on the AFC. We have looked into the request carefully and discussed the implications.
Richard F Boyce Injector UpdateL0-1 Accelerator 3 November L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
New test structures: Status report and technical documentation review
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
F D. Finley / Fermilab FARDOG / January 4, FARDOG 04JAN01 Discussion of FY01 Budget and Goals for RF Structures.
Fabrication of accelerator structures for CLIC study CLIC Workshop Oct , CERN T. Higo, KEK.
October 25, 2001David Finley to NLC SLACSlide 1 Status of X-Band Structure Fabrication at Fermilab Our First X-Band Structure Progress of RF Factory.
NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
CLIC RF structure development meeting Structure cost study (introduction) G. Riddone,
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
PASI OsC meeting 12th July 2012
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
5 th CLIC-ACE Structure production in laboratories and industries G. Riddone, 02/02/2010 (contribution from KEK/SLAC colleagues) 1.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
Engineering design of the V-supports J.Huopana Input from: G.Riddone, A.Samoshkin, R.Nousiainen, D.Gudkov, N.Gazis.
TBTS Test Program & Schedule G. Riddone
TD18 High Power Test Results Faya Wang Chris Adolphsen May 3, 2010.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Title 2 nd X-band Accelerator Structure Design and Test-Program Collaboration Meeting Discussion with WebEx on March 17 between CERN and KEK W. Wuensch,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
Cell to cell alignment on GLC structures 24 Nov. 2014, CERN Toshi Higo (KEK) 2014/11/23CLIC Structure Review1.
2.4 – Solving Equations with the Variable on Each Side.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 CEA SACLAY CLIC R&D Activities F. Peauger, A. Hamdi, M. Desmons, W. Farabolini, P. Girardot.
The reading is 7.38 mm. The reading is 7.72 mm.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
LCWS11 WG4 Fully featured accelerating structure engineering design
CERN – Zanon discussions
Complementary ISTC Projects #3888, 3889p
N. Catalan Lasheras on behalf of a very large team
Alberto DEGIOVANNI CLIC Workshop CERN
Tolerances: Origins, Requirements, Status and Feasibility
Rf structure development meeting TBTS component status and use/test at KEK and SLAC G. Riddone, I. Syratchev
Disk-damped versus Quadrant-damped from engineering view point
continued on next slide
SLAC Production Status
Summary of the checking items of the Module-C design
Forces.
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Thermal test (lab modules)
Presentation transcript:

Update of master schedule and report from SLAC G. Riddone

Master Schedule See EDMS#844300, v3 -Status -Master schedule by test station and by types -Rf components

T18 - Alignment Optical measurement (from two sides) ex. T18#4 (OD 45 mm)

T18 - Bonding T18_vg2.4_disk_4 Before bonding - OD 45 mm - 2 tuning holes per cell only Then - Brazing of the couplers - Brazing of the studs

Tuning C10 – KEK drawing

Tuning C10 2. stud: the disk is systematically equipped with studs 3. The tube ends at the tread part of the stud. TK of the tube is not defined

Tuning C10 Test set-up for tuning Position for “pulling” Test set-up for tuning Position for “pulling” Sliding hammer to push and pull Disks with tuning studs

Structure cell with 45° WG

Symmetrical disk No tuning was implemented

NLCTA – T18 reverse and T26