Slide 1 of 5 COS Monthly Status Review David Soderblom STScI2007-07-17.

Slides:



Advertisements
Similar presentations
FCMAT Response & Preparation: Process Outline October 25, 2006.
Advertisements

April 19, 20003GPP2 report 3GPP2 Steering Committee TSG-A report DRAFT Seoul, Korea April 19, 2000.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Plans for rover operations training at ROCC M. Cinato.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
1 Project Update and Summary of Project Priority List (PPL) Activity RMS August 4, 2015.
June 2014 Performance Report RM Education Stoke BSF and Stoke CIS.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
Five Busy Months for FGS STScI/TIPS 01/15/09 Ed Nelan.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
Session 10: Space Data Support to GFOI R&D DLR Contributing Data Stream Report SDCG-7 Sydney, Australia March 4 th – 6 th 2015 Helmut Staudenrausch, DLR.
1 Project Update and Summary of Project Priority List (PPL) Activity September 10, 2015.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
18 May 2006 Slide 1 of 10 STScI TAGFLASH Ground System Development Current ground system could support immediate COS launch Current ground system could.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
Change with a Purpose Kruger National Park Operations Division 21 st July 2006.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Cosmic Origins Spectrograph
1 Project Update and Summary of Project Priority List (PPL) Activity July 16, 2015.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Status STIC 13 February 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Long-Term Congestion Rights (LTCR) Weekly Testing Call January 5, Project Pinnacle.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
An Early Release Science Program Janice C. Lee STScI Science Mission Office JWST Science Working Group Meeting 29 April 2015.
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
NOAA Fisheries Update MAFAC Meeting Paul Doremus DAA for Operations September 23, 2014.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review CALCOS Requirements Philip E Hodge 14 December 2005.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
Introducing the INS Master Schedule Wayne Baggett.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
Guidance on the new Pathway IT System for Candidates
Report to RMS July 14, 2004.
Timeline Roadmap Template
Contents Progress status SAPO`s role as distribution partner
Updates to the Pathway to Chartership Online System
Updates to the Pathway to Chartership Online System

Guidance on the new Pathway IT System for Mentors
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Next Steps Advisory group debrief call Circulate meeting summary

NEMSIS V3.5.0 Timeline developed at NEMSIS Annual Meeting 2017
Second Independent Evaluation of UNAIDS

Pilot of revised survey
Calendar Overview – Phase II – REVISED April 2019
Presentation transcript:

Slide 1 of 5 COS Monthly Status Review David Soderblom STScI

Slide 2 of 5 STScI COS News TAGFLASH: This mode (TIME-TAG with regular comparison lamp exposures) was added to deal with OSM drifts Timing analysis showed that all lamp exposures were starting slightly late (1 to 2 sec) First flash about 2 sec late; others about 1 sec Initial time pad in commanding too large by ~1 sec; now reduced Latency in lamp turn-on is source of remaining delays; flash durations to be increased to compensate Full analysis of drift from TV2 to be completed in fall; present estimate of S/N looks OK

Slide 3 of 5 STScI COS News Exposure Time Calculator (ETC): Spectroscopic ETC is complete, but testing showed need for change (double precision in bin sizes needed, depending on platform) Acquisition and imaging ETC in progress, to be tested soon Will coordinate testing and verification with IDT Bright Object Protection checks: APT now includes access to Galex information Final check of this in APT requires ETC completion to check count rates Documents: First draft of COS Instrument Handbook in revision Second draft to be ready July 23 IDT review of second draft requested Released with CP in December

Slide 4 of 5 STScI COS News STScI-IDT SMOV Coordination: SMOV Requirements Review held at GSFC in March STScI is reviewing SMOV4 requirements; will prepare list of candidate activities STScI COS effort led by Tony Keyes COS IDT lead at STScI is David Sahnow Expectation is 50/50 split of SMOV responsibility between STScI and IDT Summary of activities to be prepared in August GSFC activity summary review scheduled for mid-October

Slide 5 of 5 7 Aug SM4 Launch 21 Mar Requirements Review by HSTP Reception area Proposal Descriptions COS SMOV4 Activity Timeline 1 March September September Jan High Priority (alignments, etc) Phase II Due Apr-Sep Activity Summary (Phase I) preparation STScI/IDT 1 Aug Reserved Target List Due (GTO) 31 Mar ERO and Balance of SMOV Phase II Due 30 Jun GTO Phase II Due 25 Oct Activity Summary Review by HSTP 1 March 2008