UK National Grid Service Andrew Richards NGS Executive Director Gillian Sinclair NGS Liaison Officer NGS IF08 – Manchester 4-5 th November www.ngs.ac.uk/innovationforum.

Slides:



Advertisements
Similar presentations
NeSC: National e-Science Centre. NeSC Mission Help the UK develop international strength in Grid computing Industry, Commerce, Scientific Research, …
Advertisements

The National Grid Service and OGSA-DAI Mike Mineter
Supporting the UK e-Science community and their international collaborators Steven Newhouse.
Spatial Data e-Infrastructure UK e-Science ALL HANDS MEETING September, Edinburgh, UK Higgins, C., Koutroumpas, M., Sinnott, R.O., Watt, J.,
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
UK Campus Grid Special Interest Group Dr. David Wallom University of Oxford.
Grid Infrastructure in the UK Neil Geddes. Why this talk ? LHC to 2020 –GridPP to 2011 –SRIF3 to 2010 ? Who was successful in SRIF3? –Thereafter ? PPARC.
GEODE Workshop 16 th January 2007 Issues in e-Science Richard Sinnott University of Glasgow Ken Turner University of Stirling.
Open Library Environment Designing technology for the way libraries really work November 19, 2008 ~ ASERL, Atlanta Lynne O’Brien Director, Academic Technology.
The UK National Grid Service Using the NGS. Outline NGS Background Getting Certificates Acceptable usage policies Joining VO’s What resources will be.
Technology on the NGS Pete Oliver NGS Operations Manager.
1-2.1 Grid computing infrastructure software Brief introduction to Globus © 2010 B. Wilkinson/Clayton Ferner. Spring 2010 Grid computing course. Modification.
15th January, NGS for e-Social Science Stephen Pickles Technical Director, NGS Workshop on Missing e-Infrastructure Manchester, 15 th January, 2007.
Outreach at the NGS Gillian Sinclair NGS Liaison Officer.
UK National Grid Service, a production grid infrastructure for a heterogeneous provider and user community David Wallom Technical Director.
1 Open Library Environment Designing technology for the way libraries really work December 8, 2008 ~ CNI, Washington DC Lynne O’Brien Director, Academic.
14 July 2004GridPP Collaboration BoardSlide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
QCDgrid Technology James Perry, George Beckett, Lorna Smith EPCC, The University Of Edinburgh.
UK National Grid Service Andrew Richards NGS Executive Director NGS IF08 – Manchester 4-5 th November
National Grid Service Enabling Collaboration Edinburgh 09 March 2010.
South West Grid for Learning Educational Portal Awareness Event.
The RRCP Program A Framework for Change Presented to our SPDG Partners June 2010.
The National Grid Service User Accounting System Katie Weeks Science and Technology Facilities Council.
Next Steps Guy Warner
Deakin Richard Tan Head, Information Technology Services Division DEAKIN UNIVERSITY 14 th October 2003.
CaLP RCWG – 28 th January 2015 Start time : 3 – 5pm (Thailand) Presenters: Rebecca Vo – CaLP Asia Regional Focal Point Wadel S. Cabrera III – CaLP Asia.
The UK NGI Claire Devereux NGI Manager. Overview What is it? Who does it include? How does it work? Why do we need it? How is it evolving and what does.
3 June 2004GridPP10Slide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
Neil Geddes GridPP-10, June 2004 UK e-Science Grid Dr Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations Support Centre.
Part of the. “Our mission is to support self-sustaining improvement from within local government.” Improvement and Development AgencyE Government directorate.
09/09/15 TF-MSP Meeting: 09/09/15. CSC/FUNET. Espoo, Finland 1 JANET Reach Programme Mark Tysom, Jisc.
Dr Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations Support Centre.
EMI INFSO-RI NA2 – Outreach and collaborations Status Report Emidio Giorgio (INFN Catania) Work Package Leader EMI First EC Review 22 June 2011,
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA3 Resources Robin McConnell.
DAME: A Distributed Diagnostics Environment for Maintenance Duncan Russell University of Leeds.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Next steps with EGEE Gergely Sipos
NW-GRID Campus Grids Workshop Liverpool31 Oct 2007 NW-GRID Campus Grids Workshop Liverpool31 Oct 2007 Moving Beyond Campus Grids Steven Young Oxford NGS.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
EGEE-II INFSO-RI Enabling Grids for E-sciencE The GILDA training infrastructure.
Next Steps: becoming users of the NGS Mike Mineter
Utility Computing: Security & Trust Issues Dr Steven Newhouse Technical Director London e-Science Centre Department of Computing, Imperial College London.
Tony Doyle - University of Glasgow Introduction. Tony Doyle - University of Glasgow 6 November 2006ScotGrid Expression of Interest Universities of Aberdeen,
Status Organization Overview of Program of Work Education, Training It’s the People who make it happen & make it Work.
STESEG taskforce on timeliness and benchmarkingJune The Short-term economic statistics: STES Timeliness Framework Richard McKenzie OECD.
Rob Allan Daresbury Laboratory NW-GRID Training Event 26 th January 2007 Next Steps R.J. Allan CCLRC Daresbury Laboratory.
The National Grid Service Mike Mineter.
The National Grid Service User Accounting System Katie Weeks Science and Technology Facilities Council.
1 Porting applications to the NGS, using the P-GRADE portal and GEMLCA Peter Kacsuk MTA SZTAKI Hungarian Academy of Sciences Centre for.
INFSO-RI Enabling Grids for E-sciencE NA2 Dissemination and Outreach Joanne Barnett, EGEE External Relations Officer, TERENA Secretariat.
Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations Support Centre.
National Grid Service and EGEE Dr Andrew Richards Executive Director NGS e-Science Department, CCLRC.
Grant Writing for Digital Projects September 2012 IODE Project Office IODE Project Office Oostende, Belgium Oostende, Belgium Sustainability and.
UK Grid Operations Support Centre All slides stolen by P.Clarke from a talk given by: Dr Neil Geddes CCLRC Head of e-Science Director of the UK Grid Operations.
Championing e-infrastructure Gillian Sinclair, NGS Liaison Officer Claire Devereux, NGI Manager.
The UK National Grid Service Andrew Richards – CCLRC, RAL.
Paul Needham Franklin-Wilkins Building (Waterloo) 14 October 2009 The PIRUS2 Project is funded by:
NGS Outreach Dr Gillian Sinclair NGS Liaison Officer.
VizNET and Visualization activities at STFC Lakshmi Sastry Applications Group E-Science Centre Science & Technology Facilities Council
SCI-BUS project Pre-kick-off meeting University of Westminster Centre for Parallel Computing Tamas Kiss, Stephen Winter, Gabor.
Bob Jones EGEE Technical Director
The European Energy Poverty Observatory
Ian Bird GDB Meeting CERN 9 September 2003
Stephen Pickles Technical Director, GOSC
The European Energy Poverty Observatory
BioMedBridges – Work Packages 2 & 12
Strategy
Presentation transcript:

UK National Grid Service Andrew Richards NGS Executive Director Gillian Sinclair NGS Liaison Officer NGS IF08 – Manchester 4-5 th November

History of NGS Full production since September 2004 Phase 2 started in October 2006 New hardware at four core sites in September 2007 Work in progress to transition NGS to a SLA defined service

The NGS Core, Partners & Affiliates, June 2008

New Members in the pipeline NW-Grid –NW England regional grid, Manchester, Liverpool, Lancaster and Daresbury Lab. HECToR –UK National Supercomputer Brunel University –GridPP, Tier2 Durham University –GridPP, Tier2 Liverpool University –GridPP, Tier2 Royal Holloway –GridPP, Tier2 EDINA and MIMAS –National Data Centres Aberystwyth Aston Daresbury –CATS hybrid cluster Hull Plymouth RAL –Visualization Cluster WRGrid –NE England regional grid, Sheffield, York and Leeds DIAMOND –National Synchrotron resource

Types of Member Site Core –Dedicated compute and/or data focused hardware purchased through the project Partner –Regularly tested installation of NGS defined interfaces –Supporting the NGS users Virtual Organisation –Complete a service level description (SLD) Affiliate –Regularly tested installation of NGS defined interfaces –Maintains control over permitted users

What does the NGS offer? Compute services –Access to more and different resources –Different ways of running jobs e.g. multi site MPI Data services –Access to data storage –Support and advice –New ways of accessing data Access Services –Methods to use collected externally available resources

Applications Many applications installed on the NGS! Standard compilers on all core sites Other applications include: –Abaqus –Amber –Siesta –Gaussian –Octave –Gadget –Fasta –NAMD –LAMMPS –BLAST –R –ROOT –GAMESS –DOCK –DL_POLY And more…..

User access to the NGS Directly submit jobs using an installation of the Globus Toolkit on user workstation GSI-SSH terminal to connect to the resource broker or a site –Web applet or easy install stand alone application Applications repository for web-based access running applications P-GRADE portal for workflow Application Hosting Environment for MPI across the WAN gLite UI system

Econometric analysis Molecular Dynamics Examples Protein - drug interactions Astrophysics data storage and analysis

NGS Future

Business as Usual The following services are classed as the core components needed to support grid/e-infrastructure related research within the UK. –This service list is not fixed and can be increased or decreased dependant on specific service demand or changing service requirements of the NGS project partners. –The list of core services provided will be reviewed every 6 months to ensure developing customer requirements are met. Service Management Outreach Training UK CA Support service Auxiliary Services e.g. MyProxy, VOMS, Accounting Exchange Service, Monitoring Operational Security OPN International engagement/interface

Project Work-packages 1.Project Management –Day to day project management to oversee transition from project to service. 2.Service provision –Oversee ongoing service management. 3.Transition to SLA –To define and SLA that meets the service requirements of the JISC and facilitates cross funding body work and the ability to define and meet specific requirements with other such funding bodies. 4.Accounting and charging models –Implement a national accounting exchange framework to facilitate exchange of accounting data between institutes and enable institutes to charge for resource usage. –Explore charge models, and mechanisms for charging, that an institute may adopt to facilitate provisioning services on a charged for basis 5.Partner support and development –Provide support (buddying) to HEI’s to assist with installation and becoming an NGS partner resource. –Development of tools to meet HEI requirements to assist with joining NGS –Increase participation in NGS Operations forums to facilitate community support across HEI’s

Commissioned Services Additional services and resources above and beyond those of the core ‘business as usual’ services –Through either direct funding from the NGS or other funding sources. N.b. Some additional service could be free e.g. provision of lightpaths at no cost to NGS/resources as ja.net provisioned to provide –During the transition phase of NGS-3 some of these services will initially be funded from the NGS grant and transitioned to separate partner/commissioned services which are sustained in line with user requirements through direct funding or appropriate cost recovery/charge models. Examples: –Compute services (free and charged for) –Data Storage –Visualisation –Specialist training facilities –CSE type support –Light Path connections –Etc.

Next steps Broad discussion with stakeholders –Users, HPC-SIG, Campusgrid-SIG, GridPP… Include key people in proposal development –DB, PELC … Develop ideas/proposal through September Proposal to JISC late October –And to EPSRC too Input from GridPP...

The Users Gillian Sinclair NGS Liaison Officer AHM 2008, Edinburgh

Who are they? Over 700 active users from UK academia (and beyond in some cases) All subject areas represented from arts and humanities to particle physics Many users from non-member institutions User survey over spring / summer 2008

People are aware of?

Why are people using our resources? 51% of people saved time by doing their research on the NGS

The Compute Resource 85% know of other compute resources they could use at their institution NGS is more reliable Better support and documentation with the NGS NGS offers a wider variety of options – ideal for the beginning of your research NGS is an additional resource to use as well as institutional ones giving added benefit The NGS often has smaller queues than local resources “NGS has facilitated use of new techniques for me, this is a potential job-winner. Also the ability to run simulations with a short turnaround in emergencies has been a lifesaver in many contexts”

Potential barriers Grid certificates –roaming RAs Computing knowledge –NGS portal Not of relevance to all subject areas –Software and case studies for a range of subject areas Lack of support –Helpdesk, local support at core sites

Outreach Mailing lists – NEWS and STATUS –fortnightly updates Outreach section of NGS website –Events, newsletter, pdfs of promo material Conference and event attendance –14 conferences attended over the last 12 months, over 13,300 delegates reached

Outreach plan Articles for publication –iSGTW, EPSRC Connect, NeSC News etc Press releases –9 so far with 5 more in the pipeline Publicity material –new generic leaflet, posters, user case studies NGS News newsletter –3 editions with 4 th due out in Sept.

Gillian Sinclair NGS Liaison Officer