C. Fernández Bedoya on behalf of DT Upgrade group.

Slides:



Advertisements
Similar presentations
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Advertisements

C. Fernández Bedoya, A. Navarro, I. Redondo. C. Fernández Bedoya November 29th, Goal: Replace SC crate with simple CuOF electronics and place TSC.
CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
LECC 2004 – Boston – September 13 th L.Guiducci – INFN Bologna 1 The Muon Sorter in the CMS Drift Tubes Regional Trigger G.M. Dallavalle, Luigi Guiducci,
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
C. F. Bedoya. C. F. Bedoya May 13th, * The goal was to establish a baseline plan for DT in Phase 2, (although some aspects of phase 1 also needed.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
Status of NA62 straw electronics Webs Covers Services Readout.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
C. F. Bedoya. C. F. Bedoya April 9th, LS1 projects: * Theta TRB: (talk from Fabio). * SC relocation (next slides) Phase 1 Trigger : * L1 TDR finalized.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
DT UPGRADE STRATEGY M.Dallavalle for the DT Collaboration 6/26/12 Muon IB1.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
C. Fernández Bedoya on behalf of DT Upgrade group.
New ROS design + gradual installation New TSC design + gradual installation Bottleneck at increased luminosities Improves maintainability and performance…
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
CMS Drift Tubes Gruppi di Bologna, Padova, Torino G.M. Dallavalle
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
F. Odorici - INFN Bologna
Sector Collector Electronics
Novosibirsk, September, 2017
ESR for the muon DT Minicrate System
PID meeting SNATS to SCATS New front end design
Sector Collector Electronics
OFCU-RO status and plans
The Ohio State University
Ideas and design concepts, and challenges
T1 Electronic status Conclusions Electronics Cards:
Optical data transmission for
CMS November Upgrade Week
DT Consolidation Summary
Jan Królikowski Warsaw University
ESR for the muon DT Minicrate System
Front-end electronic system for large area photomultipliers readout
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
PID meeting Mechanical implementation Electronics architecture
RPC Electronics Overall system diagram Current status At detector
(Not just) Backplane transmission options
Plans for the 2004 CSC Beam Test
Presentation transcript:

C. Fernández Bedoya on behalf of DT Upgrade group

C. Fernández Bedoya May 6 th, PHASE 1 ( ) * Replacement of theta TRB (Trigger boards) * Relocation of Sector Collector from the cavern (UXC) to the counting room (USC) PHASE 1 following steps (not strictly tighten to LHC shutdowns): * Replacement of DTTF (DT Track Finder) * Redesign of the TSC boards (Sector Collector trigger) * Replacement of the ROS boards (Sector Collector read-out) PHASE 2 * Connection with the tracker in the Level-1 trigger system * Replacement of Minicrate electronics (aging…)

C. Fernández Bedoya May 6 th,

Present rumors… We should not plan accordingly though! C. Fernández Bedoya May 6 th,

MOTIVATION * Large number of TRB failures during installation and commissioning of the detector (1%) * Failure rates related to thermal stress of the BTI ASIC bonds (repeated power cycles) * Although a large number of BTI spares were produced, mortality was high and we remain with 3% spares * We need to enlarge the number of BTIM spares: * BTIM technology is obsolete, no more ASICs can be produced * Migration of the BTIM algorithm to an FPGA * Under Padova´s responsibility (R&D since a few years). C. Fernández Bedoya May 6 th, F. Montecassiano

PRESENT STATUS * They have successfully integrated one full BTIM in one FPGA (4 full BTI inside an Actel ProAsic3 A3PE300) => 8 FPGAs per TRB * Radiation tests have been performed in most of the devices and no major problem was found: - FPGAs Actel A3PE3000 (8 per board) - IC MAX4375 current-sense supervisor (1 per board) - IC DS18S20 1-wire digital thermometer (1 per board) - Power MOSFET PMOS IRF7425 (1 per board) * Pending: -IC DS2450S 1-wire A/D + remote controlled switches (2 per board) -IC LTC3251 charge-pump step-down low noise (8 per board) to be tested with neutrons this summer * Unfortunately it seems that Microsemi/Actel 65nm could be not in time for this project (it would have reduced from 8 FPGAs to 1 FPGA per board) (Samples only available beg. 2012) C. Fernández Bedoya May 6 th, F. Montecassiano

PLAN * Produce new theta TRB to substitute all the boards in MB1 station (50 chambers) => ~100 boards - Option 1 is changing all MB1 and it is driven by detector uniformity and upgrade considerations. - Option 2 is driven by maintenance and access considerations/concerns (various stations in YB+/-2). * Make sure we have a good testing system ready (during 2 years shutdown cooling, power and other central services would likely not be available) - Impact of improving the resolution has been studied (no big improvement at present but possibility is open) C. Fernández Bedoya May 6 th, F. Montecassiano

Prototype test Production + parts procurement Bench Test + REPLACEMENT SCHEDULE Assume replacement takes ~1 chamber/day => 12 days with full access to each wheel (Assume max 3 months full replacement 1 station) C. Fernández Bedoya May 6 th, F. Montecassiano

Low impact modifications: compatible with present system and with possible future upgrades Present system Proposed upgrade C. Fernández Bedoya April 14 th, Motivation is not the physics performance but the fact that aging and other risks may jeopardize detector operation and contribute to an accelerated degradation -We believe is a necessary step to allow future upgrades -Make a “simple” 1 to 1 copper to OF conversion at UXC -Motivation is not the physics performance but the fact that aging and other risks may jeopardize detector operation and contribute to an accelerated degradation -We believe is a necessary step to allow future upgrades -Make a “simple” 1 to 1 copper to OF conversion at UXC

C. Fernández Bedoya May 6 th, PRESENT ARRANGEMENT - Responsibilities assigned according to previous know-how - Lack of manpower basically everywhere - In contact with other institutes that may be willing to participate CuOF in UXC: Torino with help from Padova for Slow Control Fibers layout and installation: Torino Integration in USC: Nobody at present OFCu in USC for RO: Madrid OFCu in USC for TSC: Bologna

C. Fernández Bedoya May 6 th, G. Mazza, G. Dellacasa, S. Masselli

C. Fernández Bedoya May 6 th,

C. Fernández Bedoya May 6 th, Estimated power budget <1kW, similar to present system - Possibility to reduce input voltage from 5.2V to 3.3 V to reduce power consumption - Improve mechanical design is possible to optimize cooling performance POWER CONSUMPTION AND COOLING INPUT CABLES -RJ45 connectors have latch in opposite direction in ROS and TSC => To have identical CuOF we need to redo the layout of the LVDS cables (hard work) POWER DISTRIBUTION -Independent power to ROS and TSC CuOF to minimize the impact of a failure in 1 A3100? => How is the power going to be distributed inside the crate? => We want to modify the A3100 to have two independent outputs? SLOW CONTROL -In principle, few bandwidth required and slow protocols such as I2C acceptable. -Padova has offered help in the design of the Slow Control interface. Expecting to hear news. OUTPUT FIBERS -8 MTP connectors could be a problem for matching to USC depending on the OFCu option

C. Fernández Bedoya April 14 th,

C. Fernández Bedoya April 14 th,

C. Fernández Bedoya May 6 th, Options: -Blowing fibers from CERN -72 connector cable -144 connector cable 5000 €/cable (~300 k€) but large uncertainty in the fan-outs -Not yet an estimation -Fit the connectors in the cable chains? >500 kCHF? -No space for the patch pannels Schedule: -Fibers (and patch panels) should be purchased 6 months in advance -One fiber to test probably should be purchased before mid Installation time ? -End 2013 Commissioning

C. Fernández Bedoya April 18 th, Possibilities: 1. Use the empty slot (where the ROS or TSC previously were allocated) for the OFCu => it means purchasing 20 crates instead of 10 => besides money (around 12keuros/crate), it means doubling the required space in USC…. 2. Install an additional crates with the OFCu => 10 9U VME crates + N crates unknown size 3. Use the rear transition modules of the 9U VME crates

C. Fernández Bedoya April 18 th, ROS TSC READOUT 5 VME crates 9U 12 ROS/crate 1 crate /wheel 12*4 A + 3 A= 51 A TRIGGER 5 VME crates 9U 12 TSC/crate 1 crate /wheel 12*10 A + 3 A= 123 A We remain with 10 crates in total (as before): Power supplies A, A, A (no problem for current needs) Cooling to be verified

C. Fernández Bedoya April 18 th, ROS / TSC OFCu - Rear transition modules can be 6U or 9U - For the 9U modules we need to discuss with Wiener the location of the power supply and the extension of the fan tray (already in contact) 6023 Wiener

C. Fernández Bedoya April 18 th, Splitting ROS and TSC implies modification of the TIMBUS backplane (J3) 6021 Wiener * Got no answer regarding use of TSC data, but I think it would be good to keep it if possible (for commissioning of the system after changes (remember DCC will also be modified)) * The rear transition module could include another link for the TSC-ROS exchange: - 1 extra fiber/OFCu - 60 fibers to be routed from TSC to ROS location

C. Fernández Bedoya April 18 th, Ethernet cables: 8/board => 96/crate Input optical fibers From the back of the rack OFCu

C. Fernández Bedoya April 18 th, ROS OFCu TSC 16 bit parallel data Ros_ready/trg_strobe Clock40MHz J3 FPGA? TSC Deserializer Power and slow control from J2 or P0? (if signals are bussed through the backplane) -Pluggable OF receivers -Reusable for new ROS/TSC -12 channels -aprox 28 euros/channel (340 € ) 12 ch 25th ch TSC input Dual SFP receiver 25 channels/board

C. Fernández Bedoya April 14 th, Q Prototype production Q1-Q Prototype validation Q Procurement parts Q Final board production Q Installation and commissioning -The pluggable 12-MTP receivers can be reused for new TSC and new ROS -An additional transmitter can be used in some rear transition modules to fan out the input signals to operate simultaneously old and new TSC/ROS SCHEDULE

C. Fernández Bedoya April 14 th, TRB replacement is going ok and schedule looks reasonable -SC relocation architecture is far from being finalized We wanted to have an executive plan by the end of May: we haven´t advance much We need to start taking coherent decisions if we want the schedule to fit

- 2 SC crates per wheel - Located in tower racks in UXC level 2 Near - 60 ROS and 60 TSC boards in the system (1 per sector) - Complex electronic system - Main elements: LINCO, TIM, ROS, TSC LINCO

C. Fernández Bedoya April 14 th, DISCLAIMER * All of our Phase 1 upgrades are focused on technical reasons * LHC 2010 has proven that DT performs superbly * It is a wonderful and unique detector: Although based on drift tubes (drift time of 400 ns), it has proven from the very beginning to provide a robust, efficient, pure trigger with synchronization and timing information with uncertainty well below 1 ns. Goal for Phase 2: * Multiple scattering limits p t resolution in muon system * Priority at higher luminosity: -reduce low momentum muon feedthrough L1: Increasing threshold not very effective High Level Trigger (SW) Big improvement when Tracker is used

C. Fernández Bedoya April 14 th, * Space available for routing the fibers is tight but existing * Passing of connectorized fiber imposes constrains on the fiber selection * Latency of trigger chain is also an important concern

In principle, there is enough space below the false floor in S1 USC to recover extra cable lengths (though it depends on the exact racks to be used). Main problem is to allocate the SC crates in S1: -10 SC crates 11U each -To minimize L1A latency, they should be close to DTTF racks (S1D01 and S2D02) -In DT racks at present there is only space to allocate 6 SC crates (and not very close to DTTF) C. Fernández Bedoya April 14 th,

C. Fernández Bedoya April 14 th, Blowing technique patch panels Structured fibers patch panels Long list of tasks: - Arranging of the fibers and the patch panels - Choice of the optimal form factor - Estimation of the trigger chain latency - Allocation of the crates in USC - Estimation of the power dissipated and cooling capability

C. Fernández Bedoya April 18 th, Why the trigger boards would be different?: * Routing to the RJ45 connectors is different (4 pairs/RJ45 instead of 3) * TSC Output data (serialize, transmit), could be implemented with different firmware in the FPGA * 32/40 inputs instead of 25: -Either you use a third 12-channel receiver (=> 9U board instead of 6U) -Or you use 17 boards/crate in a particular arrangement: Receiver Signal Detect: if you don´t have input in one of the channels SD=0… better to fill up all the receivers

C. Fernández Bedoya April 18 th, Just to start getting ideas… Example of a “home made” patch panel in USC which apparently houses 1440 fibers in 4U