CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.

Slides:



Advertisements
Similar presentations
M1 Installation Schedule Plans Burkhard Schmidt Muon Meeting
Advertisements

M.N Minard SPD cabling overview SPD cable chain & tray SPD cable chain & tray Motorisation PS/SPD Motorisation PS/SPD Work on PS Work on PS.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
The procedure to replace CALO rectifier (AC/DC converter) 1.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
CALO News Pascal Perret LPC Clermont 26 November 2014.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
26JUN08Calo Piquet Training Session - Xvc1 DCS and DSS Xavier Vilasis.
Calorimeter Status: Preparing RUN II & LS2 Pascal Perret LPC Clermont 24 February 2015.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Calorimeter Status Pascal Perret LPC Clermont 22 March 2011.
E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Status PS/SPD of LED tuning Status of tuning on A-side. Some problems Results of tuning.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
PS/SPD VFE Electronics Boxes Repairs Philippe Jacquet, Pascal Perret, Guy Reinmuth LPC Clermont 23 October 2007.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Sept 03:  About ~80 patches are installed, all in the periphery of Outer section:  C-side: voltage control / distribution boxes 1, 2, 3, 4, 8, 9 (partially)
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Calorimeter Status: Preparing RUN II Pascal Perret LPC Clermont 25 February 2014.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 Radiation test of PL500 in TCC2 Conclusion from last test in Louvain –All DCDC converters ran.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
CALO News Pascal Perret LPC Clermont 23 October 2011.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
Pre-LHCb week / CALO meeting, CERN SBBeam plugs for in 1 
CALO News Pascal Perret LPC Clermont 22 January 2012.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008

2  The passive dosimeter sensor boxes are ready (but TLDs are still to come)  We have to install them: SPD A-side: done Other Access ? 17/03/2008 Radiation monitor installation Pascal Perret - LPC Clermont

3  HCAL: activities on C-side (Yuri): End of access & closing on Tuesday  CALO C-side closed  HCAL & ECAL A-side partially opened (aligned) for Muon New access needed for ECAL A-side 1 power line lost = 25 PM Installation of radiation monitors at the same time?  SPD A-side access: SPD VFE & LED Closing on Tuesday morning next week? A-side stoppers installation on Wednesday Installation of radiation monitors  Manpower needed to move the detectors!  Muon survey measurements on Thursday (~3 hours)? 17/03/2008 Detector access and movements Pascal Perret - LPC Clermont

4 Wiener Maraton PS  The 2 nd batch has to be sent on Thursday 20 th (back on April 2 nd ) For C-side: VFE PS/SPD unit: in rack L3B03 HV/LED unit for HCAL: in rack L3A03 HV/LED unit for XCAL: spare in control room For A-side: FE unit for ECAL (crate 21): in rack L3B14 FE unit for PS A-side (crate PRS 7): in rack L3B14 We will need: Spare one for PS/SPD VFE C-side NO HV/LED unit for HCAL A-side (or C-side when access finished)  Last news: all our Maraton have to be sent to Wiener!!! 17/03/2008Pascal Perret - LPC Clermont

5  No L0 CALO  DSS/DCS Alarm information  Have cosmics on A-side with ECAL & HCAL: Thursday go to global commissioning?  LED  PS/SPD: PS/SPD: complete C-side (TELL1), start on A-side Install PVSS project on A-side SPD access this week: LED tuning, mapping, …  “Electronics activities” (LAL): week 15 (April 7 th )  Beam pipe with vacuum from March 27 th until April 1 rst 17/03/2008 Commissioning Pascal Perret - LPC Clermont

Clean up the electronics platform

717/03/2008 Do you find the error ? Pascal Perret - LPC Clermont  Here is a photo of ECAL electronics platform A side (center): Could we have a problem? Yes!!! (next slides …)

817/03/2008 How to have a catastrophe … Pascal Perret - LPC Clermont  The grid fell down without any reason …

917/03/2008 How to have a catastrophe … Pascal Perret - LPC Clermont And push the stool … … 12m below!  Hopefully nothing happened and I don’t describe you what could be …

1017/03/2008 Conclusion or how to avoid a disaster … Pascal Perret - LPC Clermont  We had already 2 problems: Some PS cables have been cut and damaged during detector displacement with a not used pulse generator This stool which falls down  Actions have to be taken: Don’t use anything on the electronics platform which is not absolutely needed! Remove it when you leave Don’t leave anything on the electronics platform which is not absolutely needed! (we will check!)