Hydrological Monitoring of TBIWRDP programme watersheds 2009-2012 Anteneh Kibret, TBIWRDP, BoWRD.

Slides:



Advertisements
Similar presentations
Volunteer Water Monitoring Support through the UWSP Center for Watershed Science and Education Nancy Turyk Citizen-Based Monitoring Conference August 2004.
Advertisements

Nelly Smith EPA Region 6. - Develop or revise bacteria reduction program for consistency with new TMDL requirements and allocations - Develop or revise.
Summary of First Sampling Effort for the Washington Roads Sub-Basin Scale Effectiveness Monitoring Project Presented by: Kathy Dubé.
Evaluating Potential Impacts of Climate Change on Surface Water Resource Availability of Upper Awash Sub-basin, Ethiopia rift valley basin. By Mekonnen.
Subwatershed Outlet (B1 project area) Hydrological Monitoring Institutional strengthening The newly established Tana Basin Organisation have been trained.
DESIGNING MONITORING PROGRAMS TO EVALUATE BMP EFFECTIVENESS Funded by grants from USDA- CSREES, EPA 319, NSF Nancy Mesner - Utah State University, Dept.
1 The 2 nd Green Mekong Forum International Conference on “Green Mekong Initiative” Water Resources Management in Lao PDR By: Mr. Phousavanh Fongkhamdeng.
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Watershed Characterization System (WCS) and its Modeling Extensions
Real-Time Water Quality Monitoring for Investigating the Strengths and Weaknesses of Existing Monitoring Techniques Little Bear River Basin Jeffery S.
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
Determining the effectiveness of best management practices to reduce nutrient loading from cattle grazed pastures in Utah Nicki Devanny Utah State University,
Quality Assurance/Quality Control Policy
Second Sudan Consortium March 2007 Water Supply and Sanitation Service Delivery and Challenges in Southern Sudan Ministry of Cooperatives and Rural Development.
8. Sampling and National System for Regional Groundwater Monitoring Jiri Sima.
PERFORMANCE AUDIT REPORT ON MANAGEMENT OF PRIMARY HEALTH CARE (A CASE STUDY ON HEALTH CENTERS) 8/16/20151 Dr. Anna Nswilla CDHSMoHSW.
Impact of Climate Change on Flow in the Upper Mississippi River Basin
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Survey on Institutional Arrangements for NMHSs.
Workshop on Effective Implementation of IWMP
Watershed Monitoring and Evaluation (WME) component of the Tana Beles Integrated Water Resources Development Project (TBIWRMP) in Ethiopia Hydrological.
Subtitle, Date, Presenter Optimizing intensified Runoff from Roads for Supplemental Irrigation, Tigray Region,Ethiopia March,13/ 2014 By:Meseret Dawit.
CMP and High Technologies Case of BSG Beshah Mogesse.
An Analysis of the Pollutant Loads and Hydrological Condition for Water Quality Improvement for the Weihe River For implementing water resources management.
Hydrological Monitoring– Status June 2012 Mikaela Kruskopf, TBIWRDP WME, BoARD.
ADB Grant 0133-CAM: Public Financial Management in Rural Development Ministries (Component 1) Analysing Budgets March ,
Conjunctive use and conjunctive management..  Physical / Chemical Interaction – water balance / quality implications  System Dimensions: time / flow.
Watershed Monitoring and Evaluation (WME) component of the Tana Beles Integrated Water Resources Development Project (TBIWRMP) in Ethiopia 7 th April 2009.
Developing Monitoring Programs to Detect NPS Load Reductions.
WMO Blue Peace - Water Security in the Middle East: Strategic Management of Hydrological and Meteorological Data and Information Product Generation Al-Hamndou.
Water for America Initiative Eric J. Evenson Advisory Committee on Water Information February 20, 2008 U.S. Department of the Interior U.S. Geological.
Hydrological Monitoring Microwatershed Monitoring Subwatershed Monitoring as part of overall hydrological network Lower Gumara Fogeda River Enkulal Outlet.
Promoting CARICOM/CARIFORUM Food Security (Project GTFS/RLA/141/ITA) (FAO Trust Fund for Food Security and Food Safety – Government of Italy Contribution)
1 Polish SAI (NIK) experience in the field of EU funds Piotr Szpakowski Najwyższa Izba Kontroli Prague, 6-8 November 2006.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
1 Status of PSC recommendations (January December 2007) Portfolio Committee on Public Service and Administration 14 March 2008.
Drought Management in Lao PDR Department of Water Resources (DWR) Ministry of Natural Resources and Environment (MONRE) Lao PDR ASEAN Drought Workshop.
Engineering Hydrology (ECIV 4323)
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
HYDROLOGY PROJECT I HYDROLOGY PROJECT II HYDROLOGY PROJECT Project Period 1996 to 2004 Total Outlay 12.5 Crores Project Period 2006 June to May 2014 Total.
PAKISTAN CONFERENCE ON SANITATION (PACOSAN) Presentation by ….. USMAN GUL 28 May 2009 FATA - NWFP.
Monitoring water resources, water use, water pollution and compliance IWRM for River Basin Organisations.
M INISTRY OF WATER AND ENERGY M ODELING E XPERIENCE N OV, 2012.
11-12 June 2015, Bari-Italy Coordinating an Observation Network of Networks EnCompassing saTellite and IN-situ to fill the Gaps in European Observations.
Shingle Creek Chloride TMDL Abby Morrisette and Josh Kuhn 9/10/11.
Joint MRC- Russia Conference on the Exchange of Experiences in the Sphere of Water Resources Management November 2015, Moscow, Russia Water Quality.
Joint MRC- Russia Conference on the Exchange of Experiences in the Sphere of Water Resources Management November 2015, Moscow, Russia Monitoring.
Carshena Gordon, Meteorologist Haime Pieter, BSc Engineering, Meteorological Department of Curaçao & St. Maarten
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
Regional Workshop on SoE water quantity reporting of ETC/ICM with West Balkan Countries Skopje January 2013.
MicroLoan Foundation: Creating balanced staff incentives Daniella Hawkins, Social Performance Manager.
1 Malawi Public Expenditure Review: Road Sector 21 November 2007.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Tanzanian German Programme to Support Health Monitoring and Evaluation Susanne Pritze-Aliassime.
DevInfo in Egypt DevInfo 5.0 Regional Training September 2006 DevInfo in Egypt Current Status & Way Forward.
Regional Accreditation Workshop For Asia and Eastern Europe Manila, Philippines th March, 2012.
Role of DSS to Manage Reject Water and Address Source Sustainability By Subhash Jain Independent Development Consultant, New Delhi
Amman | Johannesburg | London | Mexico City | Ramallah | Washington Land Investment for Transformation Programme (LIFT)- Ethiopia Department for International.
Palestinian Environmental Information System November, 2013.
Coastal Aquifer Management in the Caribbean Workshop 14 th -16 th December 2011 The Water Resource Management Agency Ministry of Sustainable Development,
EVALUATION SYSTEM FOR NIGER REPUBLIC Dr TARINGUE WAZIRI GAMBO.
Predicting the hydrologic implications of land use change in forested catchments Dennis P. Lettenmaier Department of Civil and Environmental Engineering.
Strengthening Industrial Statistics in the Lao PDR
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
Anticipating Impacts of AWM Interventions
Roads for water security water for roads Safety Ongoing activities Kitui County Mekelle, February 2017.
Image courtesy of NASA/GSFC
State of Water Information and Management Systems in Ontario
SELECT COMMITTEE ON FINANCE PUBLIC HEARINGS ON CONDITIONAL GRANT
Presentation transcript:

Hydrological Monitoring of TBIWRDP programme watersheds Anteneh Kibret, TBIWRDP, BoWRD

Contents 1.Background and status of hydrological monitoring 2.Results – Decrease in sediment concentration 3.Institutionalization and post-project plan

Objective: Design and establish a hydrological monitoring programme, which will provide baseline and monitoring data regarding sediment and water balances in the Project Area 1.According to PIM, monitoring should take place at ”various scales” 2.According to PIM, 10% reduction in sediment load is to be detected  In order to detect change in a natural system, sampling frequency must be high  Microwatershed monitoring ( 100km 2 ) Objective and framework

Agreement of institutional ”home” (WB Finland mission 2009) MMP  BoWRD Counterparts assigned 2009 Counterparts trained 2010 Budget allocated 2011 and idenpendently operational Operative to some extent – but not providing timely data Subwatershed Monitoring Programme  MoWE Hydrology department Capacity weak, little staff  TsBO in 2012 Subwatersheds identified, measured, design and procurement plan drawn up Routing for access roads made and design study ongoing

Indicators for hydrological monitoring programme 1.Hydrological monitoring programme functional, providing timely and accurate data 2.Hydrological monitoring program institutionalized and operated by a competent local institution with adequate financial resources 3.An increase in dry season baseflow or its duration 4.A 10% reduction in suspended sediment load measured over the project life.

Microwatershed Based Monitoring Programme – Status in December 2012 Data collection on the central parameters since August stations established at the outlets of 15 microwaterhseds 12 stations within the TBIWRDP area, while 5 stations are in ”control” waterhseds (no project activities taking place) >9000 samples collected August 2009 – August 2012

Number of observations and samples in MMP 2009 – 2012 (August) Flow measurements (190 with current meter, >200 float measurements, crest and Dipper data) Database (HYDATA) housed at BoWRD

Sediment concentration analyses

Indicator 2: Baseflow Decrease? No increase in surface runoff detected yet. On some stations initial increase , but clear decrease Average of all 17 stations monthly and moving annual average Concurrently, recharging of natural springs and increase in groundwater level reported in the managed watersheds!

Sediment Yield and flow analyses Sediment load reaching tonnes / month in 2011 Sediment yield reaching 25 tonnes / ha/ month in 2011 Dry season flow increased in 2011, but decreased in 2012

Institutionalisation of MMP – Securing Sustainability MMP scale within BoWRD - two counterparts on part-time BoWRD well capable to carry out MMP operations Operational budgets prepared for MMP level O&M Woreda Water Offices trained in equipments and sampling Inclusion of Woreda level in MMP assessed – post-project plan is to integrate the MMP work in the Woredas routine operations

BoWRD Budget Utilisation ActivitiesYear Utilized budget (ETB) Operational, laboratory analyses, salary, per diem, fuel & oil, stationery, maintenance 2011 ( EFY) * 2012 ( EFY) *USD (rate 18.3), € (rate 23) In 2010 the TB WME financend the MMP operations by 41000€ ( ETB), not including petrol and oil and per diems.

Challenges MMP While the BoWRD is well capacitated to carry out routine operations, the entering of data and QA of entered data is not done timely Weak capacity for supervision and data analyses Vehicles not available for routine monthly sample pick-up High-tech equipments not useful at MMP due to the nature of the floods, lack of capacity (no maintenance done, staff time not allocated) Conclusion: Routine operations well integrated in BoWRD work, but budget for continuous operations required, as well as full-time staff for MMP operations.

Action Plan Maintenance and improvement of MMP stations during dry season 2013 and 2014 Proceed with subwatershed outlet stations (TaSBO) QA and analyses of 2012 data Analyses of crest stage, flow, dipper and sediment load data (linking with TaSBO and universities, use of data for modelling)

Action Plan Training of old and new staff members in procedures, update manual Collection of flow and integrated sediment measurements throughout rainy season Analyses of baseline vs actual data – comparisons between land use, erosion control measures and sediment concentration data Continue interaction with BDU students, and other projects currently underway in the Tana subbasin (TsBO, A1, BDU/Ghent ”Tana Basin water balance”, other students (AA, Helsinki, Stockholm etc).

Action Plan Institutionalize information production from data analysis Plan for post-project MMP monitoring – reconsider which stations, what equipment?

ENTRO documentary making in March 2012 for Regional Capcity Building

Thank You!