doc.: IEEE /58 Submission January 2014 Slide 1Thomas Kürner, TU Braunschweig Closing Plenary Meeting Report for SG 100G Group (1/3) Meeting was called to order at am on January 20 and finished at January 2014 at 5.07 pm. Number of meetings: 5 (plus a joint meeting with 802.1/ TG10) Total number of attendees :20 Total number of contributions: 5 Contributions on Monday AM2 Contribution #1 : Thomas Kürner, TU Braunschweig (Germany), “Information on Fronthauling/Backhauling”; (Document thz) Contribution #2 : Hiroyo Ogawa, NICT (Japan),“ Application of RoF-based terahertz fronthauling using optical sub-harmonic IQ mixer to mobile/wireless access systems”; (Document thz) Contribution #3 : Cai Yunlong, Huawei (China), “The Challenge of Phase Noise in 100 Gb/s Express “; (Document thz)
doc.: IEEE /58 Submission Contribution on Monday PM1 Contribution #4 : Rick Roberts, Intel (USA) et. al., “100 Gbps Optical Wireless Tutorial “; (Document thz) Contribution on Tuesday AM2 Contribution #5 : Jochen Antes, Universität Stuttgart (Germany), “High Data Rate Wireless Communication using a 240 GHz Carrier “; (Document thz) Thomas Kürner, TU BraunschweigSlide 2 Closing Plenary Meeting Report for SG 100G Group (2/3) January 2014
doc.: IEEE /58 Submission Tasks completed during the meeting: Working Drafts for PAR and 5C have been finalised for submission to the Working Group (Documents thz and thz). To support the technical claims made in the 5C the living document with references has been updated (to appear as Document thz) Working on the Technical Expectation Document (TED). The content of the TED has been discussed and updated (Document thz. Working on the living document on Study Group items (Document thz) The wish of the group is to establish an IG THz and beyond to discuss applications out of scope of SG 3d 100G. This IG should be established after the transition of the SG to the TG. Thomas Kürner, TU BraunschweigSlide 3 Closing Plenary Meeting Report for SG 100G Group (3/3) January 2014
doc.: IEEE /58 Submission Thomas Kürner, TU BraunschweigSlide 4 Motion to approve the SG 100G PAR and 5C Motion: The Study Group 3d 100G asks the Working Group to put forward the PAR and CSD on “100 Gbit/s over beam switchable wireless point-to-point links” to the EC. Moved by: Richard Roberts Seconded by Cai Yunlong Upon no discussion the vote was taken with the results of ?/?/?, motion January 2014