INTERPRET in a nutshell by Carles Arús. Basic objective of INTERPRET? To develop a decission support system (DSS) to help Radiologists increase their.

Slides:



Advertisements
Similar presentations
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
Advertisements

Chubaka Producciones Presenta :.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy.
Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 1 Introduction TEAMwork TEAMwork Project (IST )
End User End User Product/ Service Product/ Service Commercial Prototype Commercial Prototype Technical Prototype Technical Prototype Applied Research.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
VITA- Virtual Learning for the Management of successful SMEs LEONARDO DA VINCI PROJECT – TRANSFER OF INNOVATION January 2009 – December PTI-LEO
Ambient Assisted Living, AAL Joint Programme Overview – and preliminary results and experiences of the first call Silas Olsson AAL Association, Central.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
1 The AccessText Network An Association of American Publishers Digital Text Portal Information Session July 23, 2009.
IST WP8: Project management Žiga Turk 2nd SciX Review Luxembourg, 17 th Nov IST
IIIrd SeaSearch Full Group Meeting Limassol, Cyprus Tuesday May 25-27, 2004 SeaDataNet-Design Study proposal.
Lactate glx tCr tCho mI ppm lipids INTERPRET International Network for Pattern Recognition of Tumours using Resonance lactate glx tCr tCho mI
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
Riccardo Genghini - Ws E-Sign Chairman – IETF PKIX San Francisco March Electronic Signature infrastructure for Europe Riccardo Genghini Cen/Isss.
CLARIN work packages. Conference Place yyyy-mm-dd
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Presented by: Craig A. Mathews, Executive Director AHRQ Annual Grantee Meeting – October 27, 2007 Transforming Quality Through Health Information Technology.
Project overview objectives, work plan, milestones and deliverables Mark Stevenson, University of Sheffield Kate Fernie, MDR Partners PATHS Final Project.
HySafe Coordination Committee Meeting, October 18, 2005, Karlsruhe Status of WP5- The Hydrogen Incident and Accident Database Update October 2005 Christian.
An Investigation of the INTERPRET Spectra using Automated Pattern Recognition Techniques Rosemary Tate St George’s Hospital Medical School,
Identity Management in DEISA/PRACE Vincent RIBAILLIER, Federated Identity Workshop, CERN, June 9 th, 2011.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
WP1- Management EuroVO-DCA 1 st PCT Meeting – 3&4 May 2007 Mathias DEPRETZ – EuroVO-DCA Project Manager 1 st PCT meeting 3&4 May 2007 Strasbourg EuroVO.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
HySafe Coordination Committee Meeting no. 8, December 13, 2005, INASMET San Sebastian Status of WP5- The Hydrogen Incident and Accident Database Update.
Business to Nature: Interregional Approach to SMEs and Entrepreneurship in Natural Areas 1 B2N PROJECT ANALYSES Magdalena Wątorska-Dec (LP)
© Services GmbH Project work plan 2/20/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
SciencePAD Open Software for Open Science Alberto Di Meglio – CERN.
WELCOME SEE.ERA.NET KICK-OFF Monday, 20 September 2004.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
BHL-Europe Biodiversity Heritage Library for Europe – ECP-2008-DILI – Kick-off meeting – Berlin – May 2009www.biodiversitylibrary.org Biodiversity.
Auto N omous, self-Learning, OPTI mal and comp L ete U nderwater S ystems NOPTILUS FP7-ICT : Information and Communication Technologies NOPTILUS.
Periodic Reporting Europe and North America Progress report and future strategy 11 March 2004 Information Meeting UNESCO Headquarters.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
AMICI WP1 – Management, coordination and dissemination
Social Dialogue Plenary Meeting
Year One: Project implementation overview
CSI - History June 2006 Original $250,000 Grant from CHCS to OHIC - Contract with QPRI to manage October 2006 Original Stakeholder members convened - Kick.
Universitat de Barcelona / FBG
Administrative / Financial guidelines
ERA-NET Plus Infravation
From a project idea to the kick-off meeting
CEOS & Work Plan Status Steven Hosford WGCV-44 28th August 2018
Dr. Drini Imami Agricultural University of Tirana
AMICI WP1 – Management, coordination and dissemination
2300 (11PM) September 21 Blue line is meridian..
State of play TRACES Working Group, Oct
on Priority Substances Strategic Coordination Group
TOP6 – WP4 Coordination and Management JPICH Coordination Office
ESSnet on Linked Open Statistics
ITDG meeting of of October 2011
McDonald’s calendar 2007.
PLUG-N-HARVEST ID: H2020-EU
Natura 2000: points of information
Steering Committee, Eurostat, Luxembourg, 4 February 2011
ESS.VIP ADMIN – Status report Item 4.1 of the draft agenda
WP 1 Management and Coordination
McDonald’s calendar 2007.
EU legislation on noise emission in the environment by equipment for use outdoors: latest developments September 2018 European.
TOP6 – WP4 Coordination and Management JPICH Coordination Office
Aurora Hoxha & Drini Imami
2015 January February March April May June July August September
Presentation transcript:

INTERPRET in a nutshell by Carles Arús

Basic objective of INTERPRET? To develop a decission support system (DSS) to help Radiologists increase their performance when using MRS in the diagnosis of human brain tumours.

The beggining... Project requested on June 1999 (3.05 Meuros). SGHMS (John Griffiths) as coordinator. Project granted (retained) for negotiation on August 1999 (2.0 Meuros). Negotiation phase September- November Incoporation of new industrial partners, PRAXIM, Siemens (2.2 Meuros). UAB (Carles Arús) as coordinator. Contract signed on December Project start January 1st, 2000 (3 years).

lactate glx tCr tCho mI ppm lipids INTERPRET International Network for Pattern Recognition of Tumours using Resonance lactate glx tCr tCho mI ppm lipids IST

INTERPRET participants (IST ) Universitat Autònoma de Barcelona, ES St George’s Hospital Medical School, UK IDI-Bellvitge, ES Centre Diagnòstic Pedralbes, ES. INSERM U438-Université Joseph Fourier, FR. University Medical Center Nijmegen, NE. Katholieke Universiteit Nijmegen, NE. University of Sussex, UK. PRAXIM, FR Siemens AG, DE. Advisory group data contributors: - Medical University of Lodz, Poland. - FLENI Buenos Aires, Argentina.

Project Co-cordinator EU Comission Project Officer Project Management Committee Clinical Data Validation Committee Advisory Group Project Administrator Scientific Manager Quality Evaluators (QAU-UAB) External Evaluators WP7 - D&I WP1 - PM WP6 - A&E WP4 - GUI WP2 - DB WP3 - PR WP5 - IPCE WP8 - CP Project Administrator Partner 2 SGHMS

Managing related items 4 plenary meetings. 19 PMC meetings. 6 technical meetings. 7 CDVC meetings 3 Annual technical reviews succesfully endured. 1 Consortium agreement signed. 1 Contract amendment (pending of signature at Brussels).

What was needed to produce a good DSS? Automate processing of raw MRS data. Good classifiers. Good Graphical user interface (GUI).

What was needed to produce a good DSS? Automate processing of raw MRS data. Good classifiers. Good Graphical user interface (GUI).

Development of automated raw MRS data processing. Software modules for automated (SV) or semiautomated (CSI) processing from raw fid to spectra in canonical INTERPRET formats.

What was needed to produce a good DSS? Automate processing of raw MRS data. Good classifiers. Good Graphical user interface (GUI).

Requirements for classifier development Large number of MRS compatible spectra originating from clinically validated data. Consensus MRS acquisition protocols, available by June Final version of clinical validation protocols and ICR questionnaire ready by March Protocol for QC of scanners and MRS data available by April 2001 and January 2002, respectively. Database to store and retrieve data, ipDB until september 2001 and iDB since then.

Requirements for classifier development Large number of MRS compatible spectra originating from clinically validated data.. Consensus MRS acquisition protocols, available by June Final version of clinical validation protocols and ICR questionnaire ready by March Protocol for QC of scanners and MRS data available by April 2001 and January 2002, respectively. Database to store and retrieve data, ipDB until september 2001 and iDB since then.

Consensus acquisition protocols for SV and CSI. SV: TE/TR, 30 and 136/2000 ms PRESS. CSI: TE/TR 20/2000 STEAM and 136/2000 ms PRESS. MRS acquired post-contrast administration.

Requirements for classifier development Large number of MRS compatible spectra originating from clinically validated data.. Consensus MRS acquisition protocols, available by June Final version of clinical validation protocols and ICR questionnaire ready by March Protocol for QC of scanners and MRS data available by April 2001 and January 2002, respectively. Database to store and retrieve data, ipDB until september 2001 and iDB since then.

14 yr Anaplastic astrocytoma

Shape TrianglesStars Colour Blue Green PR Good classifiers...

Classifiers developed. SV, supervised approach on short echo time (20-32 msec) spectra. CSI, unsupervised (clustering) and supervised on short echo (20 msec) spectra. CSI supervised on long echo (272 and 135? msec) spectra.

What was needed to produce a good DSS? Automate processing of raw MRS data. Good classifiers. Good Graphical User Interface (GUI).

Graphical User Interface Scientific prototype for SV spectra. Scientific prototype for CSI short echo spectra (Siemens). Scientific prototype for CSI long echo spectra (Philips). Industrial prototype of DSS for SV spectra.

Graphical User Interface Scientific prototype for SV spectra. Scientific prototype for CSI short echo spectra (Siemens). Scientific prototype for CSI long echo spectra (Philips). Industrial prototype of DSS for SV spectra.

Graphical User Interface Scientific prototype for SV spectra. Scientific prototype for CSI short echo spectra (Siemens). Scientific prototype for CSI long echo spectra (Philips). Industrial prototype of DSS for SV spectra.

Graphical User Interface Scientific prototype for SV spectra. Scientific prototype for CSI short echo spectra (Siemens). Scientific prototype for CSI long echo spectra (Philips). Industrial prototype of DSS for SV spectra.

Example - case 6: HGG HGG (3)HGG (2)? Metastasis (1)?

Graphical User Interface Scientific prototype for SV spectra. Scientific prototype for CSI short echo spectra (Siemens). Scientific prototype for CSI long echo spectra (Philips). Industrial prototype of DSS for SV spectra.

Diffusion and Exploitation 17 publications or articles in press related to INTERPRET. 50 communications/posters/conferences related to INTERPRET. Prototype demonstration at ISMRM, ESMRMB, RSNA meetings and smaller workshops. Industrial prototype in certification path to obtain CE marking.

The final rush and the future... A preliminary clinical evaluation of the CSI 272 msec scientific prototype has been carried out and a similar one for SV and short echo time CSI prototypes is in progress. How can we improve what has been accomplished?. Should we do it?.

Acknowledgements. I thank you all for making INTERPRET possible...