Die folgenden slides werden zur Zeit noch überarbeitet 1 slide pro aktivität Wichtig ist die Information: 1. Motivation: worum geht es? Was sind die Ziele?

Slides:



Advertisements
Similar presentations
– Calice Collaboration Meeting
Advertisements

Clock module for TB spring 2012 Uli Schäfer 1 R.Degele, P.Kiese, U.Schäfer, A.Welker Mainz.
Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 1 Front-End-Electronics for ILC Calorimeter Development G. Blanchard, P. Gay,
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
1 Overview of DAQ system DAQ PC LDA ODR Detector Unit DIF CCC Detector Unit DIF Detector Unit DIF Detector Unit DIF Storage Control PC (DOOCS) DAQ PC ODR.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
30 October 2002Paul Dauncey - CALICE/PRC1 PRC – CALICE Progress Report Paul Dauncey, Imperial College London Representing the CALICE Collaboration.
Calice ECAL Readout Hardware Status report Adam Baird ECAL Meeting 26 Sept 2003 LLR-Ecole Polytechnique.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Status of CCC CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
Mainz hardware activities - clock module for TB spring R.Degele, P.Kiese,U.Schäfer, A.Welker Mainz Uli Schäfer 1.
CALICE: status of a data acquisition system for the ILC calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
Bart Hommels Univeristy of Cambridge EUDET Annual Meeting, Ecole Polytechnique, Paris JRA3: DAQ Overview Objectives System Overview Status of.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
Monday December DESY1 GDCC news Franck GASTALDI.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
1 On- and near-detector DAQ work for the EUDET calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
AHCAL LDA CALICE electronics and DAQ Meeting DESY Hamburg, Dec. 10, 2012 André Welker Bruno Bauss, Volker Büscher, Reinhold Degele, Sascha Krause, Yong.
14.4. Readout systems for innovative calorimeters
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Megatile Studies Yong Liu Johannes Gutenberg Universität Mainz
CALICE DAQ Developments
Wing-LDA Timing & performance Beam Interface (BIF)
AHCAL Beam Interface (BIF)
AHCAL Detector Interface electronics
CALICE meeting 2007 – Prague
CMS High Granularity Calorimeter (HGCAL) Beam H2 2017
Testbeam Timing Issues.
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
C. de La Taille IN2P3/LAL Orsay
CALICE/EUDET Electronics in 2007
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
Reports for highly granular hadron calorimeter using software compensation techniques Bing Liu SJTU February 25, 2019.
Outline of CEPC Calorimeters CDR
Presentation transcript:

Die folgenden slides werden zur Zeit noch überarbeitet 1 slide pro aktivität Wichtig ist die Information: 1. Motivation: worum geht es? Was sind die Ziele? 2. Arbeiten: was ist bislang passiert?, Ergebnisse, Veröffentlichungen (?) 3. Pläne im kommenden Jahr. Uli Schäfer 1

CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL HBU scintillator/PCB sandwich P. Chau Data aggregator and timing unit for CALICE / AHCAL A. Welker/R. Spreckels Optimization of scintillator tile geometries for surface mount (digital) SiPMs Y. Liu Generic Silicon PM R&D S. Krause 2

AHCAL wing LDA and CCC Development of a data aggregator for the Analogue HCAL of CALICE Consolidation of data received from the HBU active detector units FPGA and Xilinx Zynq based Data transmission into DAQ via Ethernet PCB geometries adapted to final detector geometry 1.1m long structure consisting of central body and two wings Status Initial prototype successfully built Firmware work, software integration and tests on-going Development of a timing unit for CALICE Distribution of central clock Synchronous commands to all sub-detectors Busy handling, asynchronous trigger (for beam tests) Status Successful operation in ECAL beam tests Initial version made available to AHCAL collaboration + Development of various test and support modules (FPGA/Zynq based) >>> ongoing development throughout 2013/14 <<< 3

Characterisation of SiPMs Explore properties of analogue SiPMs Signal shapes After pulses Cross talk Uniformity Absolute gain calibration Dark rates Thermal properties Require Optical table, positioning stage / stepper control Pulsed laser diodes Pre-Amp Readout chain for charge measurement Pulse shape determination with FADC Absolute charge measurements via pico-amp current readout (Xe-Lamp / monochromator, calibrated reference diode) Status Setting up readout chain Simulating signal response Working on fast calibration pulser design Components procurement on-going >> Uli Schäfer 4