Operating the Indian Electricity Grid Challenges and Future Outlook R.P.Singh Chairman and Managing Director Power Grid Corporation of India Limited.

Slides:



Advertisements
Similar presentations
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
Advertisements

Study Committee Representatives Annual Report December, 2012
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
CHALLENGES IN DEVELOPMENT OF INDIAN POWER SYSTEM Mr. V. Ramakrishna Member (Power System), CEA.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Generation Peak Demand : 132 GW Growth Rate: 9 – 10 % (per annum) India - Present Power Scenario Total Installed Capacity – GW (As on )
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
NORTHERN REGIONAL GRID SYSTEM CONTINGECY AND RESTORATION.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
Supergrid Modelling for the Indian Subcontinent Farhan Beg Global Energy Network Institute With Inputs from Mr. Peter Meissen and Mr. Paul Michael Dekker.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
Africa Geospatial Forum Geospatial Empowering Utilities.
The SEC Power Forum Wolfgang Braun CEO Energy Transmission Middle East, SIEMENS Session IV: Opportunities in Transmission & Distribution Related Industries.
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
1 TECHNOLOGICAL CONSIDERATION ON ENERGY COOPERATION OF N-E ASIA OCTOBER, 18, 2002 SUNWOO, HYUN-BUM.
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
Smart Grid in Transmission Engineering Cell, GETCO, Vadodara.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Turkish Power System Overview March 2012
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
DEVELOPMENT OF SOUTH ASIAN GRID. WHY SOUTH ASIAN GRID ? Optimal Utilization of Natural Resources Opportunity of Energy Trading Economy of Scale Advantage.
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Accelerate the Construction of the UHV Power Grid and Promote the Sustainable Development of Chinese Power Industry Liu Zhenya State Grid Corporation of.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Indian Power System Peculiarities & Solutions S K Soonee Executive Director NRLDC.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
SRLDC 1 POWER SYSTEM OPERATION A FRESH PERSPECTIVE Power Grid Corporation of India Limited New Delhi, India.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
NLDC 1 Ancillary Services in Indian Context. NLDC 2 Outline Definition Drivers for Ancillary Services Ancillary Services in Indian Context.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
ABB Power Technologies Network Management ABB Industrial IT for Network Management.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
Overall National Grid Development: Constraints & Options
POWER SECTOR, ENERGY RELATED RESEARCH POTENTIAL in LITHUANIA by dr. Anzelmas Ba čauskas Lietuvos energija AB, Lithuania CENTRAL-EASTERN EUROPEAN ENERGY.
UTILITY OF MODERN LOAD DISPATCH COMMUNICATION SYSTEMS
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
Imagination at work. Paddy McNabb Senior Engineer January 2016 Grid Stability Applications Wide Area Monitoring System.
Southern Regional Power Committee Central Electricity Authority.
POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication.
STATE ELECTRICITY BOARD
Introduction to the course
A Project Review On POWER QUALITY IMPROVEMENT IN GRID USING STATECOM
Damitha Kumarasinghe Director General
IG BASED WINDFARMS USING STATCOM
Operationalizing One Nation One Grid
REGIONAL GRIDS IN INDIA – QUICK FACTS
IN ADDITION OF UI RATE CORROSPONDING TO FREQUENCY OF 49
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
EE6501 POWER SYSTEM ANALYSIS
Congestion regulations
India Smart Grid Week, 2016 Yogendra Patwardhan
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
EU-IPA12/CS02 Development of the Renewable Energy Sector
Mid-Continent Area Power Pool
POWER GRID INTERCONNECTIONS IN CHINA
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Operating the Indian Electricity Grid Challenges and Future Outlook R.P.Singh Chairman and Managing Director Power Grid Corporation of India Limited

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.2 Indian Power System Overview Guiding principles –Sufficient Quality Reliable and Affordable power Generation –Owned by Central sector, State sector and Private sector Transmission –Transmission & System Operator (TSO) –Five Geographical Regions, Three Electrical Regions –Non-discriminatory Open Access in Transmission Distribution –State owned utilities, Private utilities, Cooperative societies Moving towards distributed generation and distribution

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.3 Coal Hydro Hydro potential in North east and upper part of Northern Region Coal reserves mainly in Eastern Region Distribution of energy resources and consumption centres are extremely unbalanced Necessitate power transfer over long distances Energy Resource Map

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.4 TRANSMISSION VOLTAGE OWNERSHIPTOTAL CENTRALSTATE Circuit Kilometer kV HVDC 4,3721,5045, kV charged at 400 kV , kV40,85422,60763, kV9,22098,521107, kV*2,15293,12695,278 Total57,515216,167273,682 EHV Infrastructure (as on ) * 132 kV network as on

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.5 30,500 MW 16,000 34,543 MW 35,511 MW Installed capacity & Inter regional links Inter regional Link MW capacity NER-ER1,850 ER-NR700 ER-SR1,200 ER-WR1,650 SR-WR1,200 WR-NR900 Talcher Kolar HVDC Bipole 2,000 Total as on ,500 Target for ,000 Three synchronous systems -North, Central & South 33,142 MW 16,561 MW 2,443 MW Installed Generation Capacity As on : 122,200 MW Target for Year 2012 : 200,000 MW

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.6 All India Generation (as on ) Coal (67,688 MW) Hydro (31,745 MW) Gas (12,171 MW) Diesel (1,201 MW) Nuclear (3,310 MW) Renewable (6,158 MW) Total Installed Capacity: 1,22,275 MW Total market size587.3 BU Thermal486.0 BU Hydro84.5 BU Nuclear16.8 BU Market Composition State Sector long term PPA46 % Central Sector long term PPA 37 % IPP generation9 % Electricity Trading3 % Balancing market5 %

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.7 Domestic 84 kWh Commercial 26 kWh Industrial 117 kWh Public Lighting 4 kWh Traction 9 kWh Agricultural 81 kWh Others 71 kWh Predominantly Agricultural & Domestic Highly weather sensitive Wide variation in peak & off peak demand Behavior of each state different from others Per capita consumption Load Characteristics

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.8 Planning Philosophy Year 1975 to 2000 –Regional self-sufficiency –Asynchronous Inter regional links for emergency assistance and limited transfer of operational surplus –Focus on evacuation of Power plants Post Year 2000 –National optimization of resources –Stage wise development of transmission capacity –Focus on stability, system strengthening –Emphasis on distributed generation Macro Planning –Centralized Perspective Plans by Central Electricity Authority (CEA) Micro Planning –By Central Transmission Utility (CTU) in the interstate level –By State Transmission Utility (STU) in the intrastate level

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.9 Challenges in Planning Achieving capacity adequacy –In Generation & Transmission Optimization of power transmission corridors –400 kV multi circuit, 765 kV AC, kV HVDC Bipole Enhancing transfer capability of existing lines using –Series compensation –System Protection Schemes –Phasor Measuring Units (Wide Area Measurement) Formation of National Grid by 2012 –Total investment required: INR 710 Billion (US $ 15.7 Bn) –Investment by POWERGRID: INR 500 Billion (US $ 11.1 Bn) –Investment by private investors: INR 210 Billion (US $ 4.6 Bn) Address deficiencies in sub-transmission system –High Voltage Distribution System, Distribution Management System Managing international power transactions

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.10 Regional Grid Management Grid Operation philosophy –Decentralized Operation & Control (Loose power pool) –State power system treated as Notional (flexible) Control Area –Very tight control of actual interchange by utilities not mandated –Deviations from pre-committed schedules appropriately priced Unity of Command –National Load Despatch Centre (NLDC) –Regional Load Despatch (RLDC) apex body within the region –State Load Despatch Centre (SLDC) apex body within the state

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.11 Ensuring System Security & Stability Protection Coordination at Regional level –Under frequency, df/dt relays, under voltage relays Hybrid operation of Long HVDC & EHV AC system Use of Dynamic Compensation- FACTS, SVC Frequency Controller on HVDC Back to Back Using Advanced tools of System Visualization –SCADA, EMS, Unified Network Database Dedicated communication system Real-time Balancing by operator complemented by –Frequency linked Pricing for Active Power imbalance –Voltage linked Pricing for Reactive Power imbalance

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.12 Open architecture based unified data acquisition system Moving towards operation by exception through –Intelligent alarm processing –Drawing operator attention through blinking/colored/dotted displays –Utilization of classical energy management tools Thrust on use of enhanced visualization techniques –Geographical maps & 3-dimensional displays Simplification of navigation in application software –Ease-of-use end result Improving system data reliability through –Quality flags –Ensuring availability of communication network Seamless confluence of SCADA and the MIS Skill enhancement through training, simulator exercises –Experienced Operators work with fresh engineers Empowering the grid operator

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.13 NLDC RTU SUB LDC SLDC RLDC 23 Nos. 51 Nos Nos. 5 Nos. Plant/Sub Station Level Group of District Level State HQ Level Region Level National Level Data Acquisition & Communication System Dedicated communication system For data and speech

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.14 Compressing gestation period of transmission projects –Satellite imaging for detailed survey & route alignment –Standardization of tower design Enhancing transfer capability on existing line –Series Compensation, Flexible AC Transmission system –Reconductoring using aluminum alloy conductors Optimization of power transmission corridors –400 kV multi circuit, 765 kV AC, kV HVDC Bipole Adoption of higher voltages for loss reduction Installation of switched shunt reactors Gas insulated substations Switching over to numerical relays Convergence of Communication & Transmission –Optical Fibre Ground Wire (OPGW) Applying technology

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.15 Grid performance Number of Grid Disturbances have come down Inter regional Power exchanges have increased manifold

Monday, October 24, 2005POWER GRID CORPORATION OF INDIA LTD.16 Challenges in Grid operation Secure & Reliable operation of large synchronous system –Synchronous operation of Northern Region with Central Grid –By 2006 we shall have only two electrical regions Development of a competitive power market Harmonizing interests of stake holders Building mutual trust Ensuring the ‘Right Man’ behind-the- wheels Capturing wealth of operator experience in form of expert systems SOUTHE RN REGION WESTER NREGIO N EASTER N REGION NORTHER N REGION NORTH- EASTER N REGION ELECTRICAL REGIONS Same frequency from Gujarat to Arunanchal Pradesh with effect from March 2003 About 2800 kilometers apart

Thank you for your attention Namaskar !!!