Northside Transportation Network Community Meeting November 17 th, 2010 UROC.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
West 181 Street, Hall of Fame Terrace & University Avenue/ MLK Boulevard 2 children killed by vehicles in five years - tied for most dangerous.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Right and Left Turns.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Reston Master Plan Thoughts on transportation. Focus is important Without the proper transportation groundwork other plans will fall through.
Transport.tamu.edu Options for Access Improvements Near MSC Wednesday, December 7, 2011.
Jan. 16, 208 CoW1 - Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Committee of the Whole January.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Contact: Beth Morris
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Slide 1. Slide 2 Introduction How did you get to school as a child?
PTO Back to School Night Introduction to our new Access Drive “We are committed to making our school and community safer”
Boston Cyclists Union Gateway East Needs a Safe Bikeway for Everybody.
We start at Stars and Stripes Park Hefner Lake, South by ball diamonds– here we have a group gathering, instructions, distribute maps. Head.
East 169 Street & Third Avenue 24 children hit by vehicles in five years - tied for 4th most dangerous.
SOUTH TAMA COUNTY COMMUNITY SCHOOL DISTRICT SAFE ROUTES TO SCHOOL
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Unit 2 Places.
With Pictures.  Bus Bus Schedule CarBike BicycleTruck.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Safety Belt All passengers must be belted & may be ticketed for violation of the law. Fitting: Lap belt should be worn across the hip bones. It should.
The Roads Ahead Leroy D. Alloway, Director Community Development.
INTERSECTION SAFETY PERFORMANCE AND AUDIT Andy Loonan Basak Aldemir-Bektas Intersection: Welch Avenue & Lincoln Way.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Prepositions of Movement
South Parkway Refinement Plan F Context of the plan F Goals of the plan F Major issues F Parkway/Third Street alternatives F City of Bend, ODOT assess.
San Juan Greenway WJI PRODUCTIONS Cycling and Walking Centennial Trails Project.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
1 Traffic-Intolerant Bicyclists and Boston’s Greenway Network Peter G. Furth Professor Department of Civil & Environmental Engineering Northeastern University.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
The Main Street Bike Lane Project LADOT Bike Program.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
STA Safety Project PID #76439 December 12, 2006.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Kentwood Fire and Transportation. Windshield Survey  Avenue G and Third Street are the main roads going through the town. They are also the only roads.
Montana Parking Rules LET’S GO! NEXT BACK Park by white curb markings to pick up or unload passengers only.
Light Rail Project Community Light Rail Support Plan Committee 14 August 2014 Kensington Kingsford.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
PROJECT UPDATE LRT ALIGNMENT. LRT ROUTE MAP ALIGNMENT OVERVIEW B-line Primarily centre-running; segregated by curbed barrier 13 stops Majority of stops.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Pioneer Road Relocation and Reconstruction Project
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
2008 Dirty Dog Run Course St Rt 46 North Main Street
Lyle Parkway to SR 540 (Winter Lake Road)
Presentation transcript:

Northside Transportation Network Community Meeting November 17 th, 2010 UROC

2 Alignments LRT/BRT alignment options studied in Alternatives Analysis

3

4

Golden Valley Station (D1 alignment)

6

LRT on Broadway (D2 Alignment)

LRT on Penn (D2 Alignment)

LRT of Penn (D2 Alignment)

Segment D2 Sub-alternatives 10 Segment D2 (a) LRT on Penn Avenue (east side of street) Northbound car traffic to Oliver, southbound on Penn All on ‐ street parking would be eliminated from Penn. One lane of parking would remain on the east side of Oliver Avenue. Properties on the west side of Penn between Broadway and 23 rd would be acquired by the project. Partial property impacts on the west side of Penn for bus stops at each cross street and around Penn/Plymouth to fit the station at that intersection. East ‐ west traffic crossings would be located at Golden Valley Road, 16th Avenue, Oak Park Avenue, and Plymouth Avenue.

11 Segment D2 (b) LRT on Oliver (either east or west side), two ‐ way Penn traffic Northbound and southbound traffic would remain on Penn. No vehicle traffic on Oliver. The remaining space on Oliver would be made into a bike/pedestrian trail with emergency vehicle access only. Loss of on-street parking on Oliver. Stays within the space between sidewalks on Oliver Avenue. Partial property impacts around the Oliver/Plymouth and Oliver/Broadway. East ‐ west traffic crossings at Golden Valley Road, 16th Avenue, Oak Park Avenue, and Plymouth Avenue. All other cross streets would be dead-ended at Oliver and potentially converted to community parking bays.

12 Segment D2 (c) LRT on center of Penn Avenue, two-way traffic on Penn Virtually all properties along one side of Penn Avenue would have to be acquired. On other side of Penn, partial property impacts for bus stops at each cross street. East ‐ west traffic crossings at Golden Valley Road, 16th Avenue, Oak Park Avenue, and Plymouth Avenue, allowing. All other cross streets would be converted to “T” intersections at Penn, allowing for right turns onto or off of Penn, but not for movement across the tracks.

Other proposed sub-alternatives LRT on Penn Ave. Southbound traffic on Oliver, northbound traffic on Queen- both would become one way streets Potential loss of car parking on one side of street on both Oliver and Queen Penn would also contain lanes for bus-only traffic Minimal property impacts (partial impacts likely near stations) Stoplights on Golden Valley Road, 16th Avenue, Oak Park Avenue, and Plymouth Avenue, allowing east‐west traffic to cross the LRT tracks. All other cross streets would be dead-ended at Oliver and potentially converted to community parking bays. 13 Segment D2 (d)

14 Segment D2 (w) Route would widen Penn, allow for two-way traffic, LRT down center Would impact front yard space of houses on Penn

15

16

17

18