UNCLASSIFIED JLOTS 2014 Port of Anchorage Tacoma Port of Tacoma Anchorage Concept of Operation Mission Statement: 622 nd Transportation Detachment will deploy to Anchorage, Alaska beginning 08 MAR 14 IOT conduct Joint Logistics Over- the-Shore Operations (JLOTS) and will conduct in-transit visibility(ITV) of cargos, Units, personnel and supplies moving over multiple lines of communication by planning, routing, scheduling, controlling, and coordinating responsibility for movements operations. Purpose: To validate the Unit’s(622 nd MCT) ability to perform detailed planning and execution of movement control operations in conjunction with sister services and other interagency capabilities during peace and war time operations. End state: The 622 nd MCT deploys safely and effectively, while providing Movement Control Support during JLOTS to sister services. 622 nd MCT fully trained and ready to provide theater port opening capabilities and to execute JLOTS and theater operations in any global environment. Concept of the Operation: (conducted in five phases) Phase I: Planning Phase II: Personnel/Equipment Preparation/ Deployment Phase III: Arrival of Personnel/Equipment and Rehearsals/ADVON Party (08 Mar – 01 Apr 2014) Phase IV: Execution (02-07 April 2014) Phase V: Redeployment/ Recovery/AAR ( April 2014) Timeline: ROC Drill (13-17 Jan 2014) Rehearsals (30-31 MAR 2014) Execution (02-07 APR 14) Recovery /AAR (08-30 APR 2014) FOR OFFICIAL USE ONLY
UNCLASSIFIED Marshaling/Staging Yard Location
UNCLASSIFIED Power Generator ECPs Interrogators Parameter Traffic Flow Operations and Warming Tent Marshaling Area for Containers Staging Area Marshaling and Staging Yard 200ft x 40ft Double stacked 200ft x 40ft Double stacked 200ft x 40ft Double stacked 100 per
UNCLASSIFIED Port of Alemeda, California
UNCLASSIFIED Port of Tacoma, Washington
UNCLASSIFIED 6 2xLCUs LSV Port of Anchorage Strategic Vessel 2xSmall Tugs Large Tug P otential Lighterage Landing Area Cargo Staging Area BD Crane 11 th Trans BN Mobile Crane BARGE IPDS
UNCLASSIFIED Cargo Staging Area Potential Beach Landing Area BD Crane LCU LSV Large Tug Small Tug Strategic Vessel Traffic Pattern Port of Anchorage, Alaska FOR OFFICIAL USE ONLY
UNCLASSIFIED BD Crane LSV LCU Port of Anchorage, Alaska FOR OFFICIAL USE ONLY 11 th Trans BN HQ Mobile Crane
UNCLASSIFIED Ship Offload 11 th TOC To the CSA N Port of Anchorage, Alaska Ground Through Put Route Legend Command Post Warming Tent Light Set RFID Interrogator Porta John Notes: Locations are estimates. Confirmation of actual locations can be made at the FPC.
UNCLASSIFIED Port of Anchorage, Alaska Container Staging Area (CSA) N CSA To the Port Notes: Locations are estimates. Confirmation of actual locations can be made at the FPC. Legend Command Post Warming Tent Light Set RFID Interrogator Porta John
UNCLASSIFIED JBER Hospital Information 11 Main Entrance ER JBER Hospital 5955 Zeamer Ave JBER, AK General Hours: M-F, 7:30am-4:30pm Information Desk: (907) Emergency Hours: 24 / 7 / 365 For Urgent Care, please call JBER Hospital operates an Emergency Room Department that is open 365 days and provides 24/7 services for valid medical emergency.
UNCLASSIFIED 12 Medical Assests th BN Area of Operations 1 x 68W on ground 1 x 68W with BD Crane 2.Vessel Medical Support 1 x 68W per authorized vessel (Large Tug, 2 x LCU, LSV) 1 Medic/Corpsman with Coast Guard
UNCLASSIFIED 13 LSV: 1 x 68W ST: No medic LT: 1 x 68W LCU: 1 x 68W BD Crane: 1 x 68W th BN: 1 x 68W
UNCLASSIFIED rd ESC/7 TB(X) Area of Operation Surgeon (T) 68W x 2 (SFC & SPC) 68G- Patient Administration 2.JBER Hospital/ ER
UNCLASSIFIED Ship to LSV/ LCU 50 minutes LSV/ LCI to Port 20 minutes Water Water Ops Times moving across the water are subject to change.
UNCLASSIFIED Port Ops Total time to move 6 containers from container ship to staged in the CSA: 170 minutes (2 hours & : 50 minutes) for 6 Containers CSA Return 10 min Download 10 min Transit (Cont) Load 10 min Pier Transit 10 min Return (Cont) 2 Connexs 22 min