W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February.

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
P. Chumney, U. Wisconsin, CHEP, March 2003 CMS Regional Calorimeter Trigger - 1 Level-1 Regional Calorimeter System for CMS P. Chumney, S. Dasu, M. Jaworski,
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
US LHC Detector M&O Evaluation Group, February 5-6, 2004: Trigger1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep Global Trigger Global.
W. Smith, August 2002 U. Wisconsin Task T - 1 Task T - CMS at LHC Personnel: Professors. D. Carlsmith, S. Dasu*, D. Reeder, W. Smith* Senior Scientist.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
W. Smith, U. Wisconsin, LHCC CMS Review, May 6, 2008 Trigger Coordination - 1 Trigger Coordination Report Wesley H. Smith U. Wisconsin CMS Trigger Coordinator.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
P. Klabbers, U. Wisconsin, LECC September 2006 CMS Regional Calorimeter Trigger - 1 Integration of the CMS Regional Calorimeter Trigger into the Level-1.
W. Smith, U. Wisconsin, IEEE, November 1, 2006 CMS Regional Calorimeter Trigger - 1 The CMS Regional Calorimeter Trigger Electronics Integration W. H.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
W. Smith, US CMS Meeting, April 8, 2006 CMS Trigger - 1 Click to edit Master title style US CMS TriDAS 2006 US CMS Meeting Wesley H. Smith, U. Wisconsin.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
CMS Trigger Supervisor Framework
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
CMS November Upgrade Week
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Major Production Complete
Darin Acosta University of Florida
Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager
SLB Synchronization in H4 Beam (LIP - Lisbon)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CSC Trigger Meeting Summary
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
Sector Processor Status Report
Plans for the 2004 CSC Beam Test
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February 17, 2006 Outline: Calorimeter Trigger Status Endcap Muon Trigger Status Installation/Commissioning Plans Upgrade R&D This talk is available on:

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 2 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator DC-DC Adder mezz link cards BSCAN ASICs PHASE ASICs MLUs Back Bar Code Front Regional Cal. Trigger Milestone: Production & Testing Complete Receiver Card: Electron Isolation & Clock: Jet/Summary: Receiver Mezz. Card BSCAN ASICs Sort ASICs BSCAN ASICs Phase ASIC 132/153 tested (126) 153/154 Tested (126) 23/25 tested (18) 22/25 tested (18) 26/28 Custom Backpl Tested (18) fraction tested* (needed) EISO Clock Front Back *will test rest for extra spares

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger RCT Full Crates Operating at CERN - U. Wisconsin Rear of Full RCT crate fully cabled to HCAL trigger primitive logic Front of Full RCT crate with Jet Capture Card that continuously samples output, checks on the fly for errors and provides readout of 256 crossings Used for integration tests & board checkout after shipment

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 4 Endcap Muon Trigger Milestone: Production & Testing Complete Mezzanine card TLK2501 serializers OptomodulesGTLP Receivers VME Interface (glue logic) Muon Port Card (Rice): Final production done (tested 67) Total needed: 60 (75 incl. spares) Sector Processor (Florida): Backplane produced (1 needed) 20 SP produced (12 needed): Muon Sorter (Rice): Sorter produced (1 needed)

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 5 CSC trigger operations Preparing for Cosmic Challenge Currently set-up in SX5 as operated in 2004 beam tests Connected 10 chambers in ME+2 & ME+3  20 ° full slice on YE+2 CSC Track-Finder will provide a cosmic muon trigger based on a coincidence of LCTs in two or more disks Currently 50Hz with 2-station coincidence CSC track finder has already provided triggers used to pass data from the CSCs to the global DAQ. SP

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 6 Operate fully functional trigger electronics at CERN Employed in myriad tests & preparation activities Tests in Electronics Integration Center Labs & row of racks for electronics subsystems Test interfaces & integration as much as possible before move to USC55 Surface & “Magnet” tests in SX5 With both HCAL and EMU More during magnet test Verify trigger functions & interfaces w/detectors on surface. Installation in Underground Counting Room (USC55) Expect start by April ‘06 --”ready for crates” Racks, Infrastructure installed & operational Trigger Upgrade R&D Start initial design work & technology investigations Underground Counting Room Trigger Activity in 2006

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 7 Electronics Schedule (8) month slip wrt. schedule as of Feb ‘05 (‘04) Start USC55 Installation was Dec ‘05 (June ‘05) in Feb ‘05 (04) (access/cooling:USC55) Start USC55 Installation date is now April 2006

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 8 Electronics Integration Center (Building 904) User Labs LV Tests System Tests Trigger Tests Assemble one each of critical racks in central trigger core in underground counting room Readout & trigger electronics testing labs See Next Slide

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 9 HCAL ECAL RCT GCT GT/ GMT TTC DTTF CSCTF Central Integration Racks in Electronics Integration Center Large scale integration tasks in central racks: Example: Calorimeter trigger operating with CMS timing & control infrastructure Successful integration tests with regional calorimeter trigger, global calorimeter trigger, HCAL and ECAL trigger primitive logic

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 10 Bldg. 904 Integration Tests

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 11 Status of 904 All users in place Safety system validated. 24/7 operation Procedures in place for DSS/DCS operation Integration in central racks now focus of work DAQ burn-in Integration of TTC/RCT/ECAL/HCAL/GCT/GT Integration of GMT/CSCTF/DTTF/GT/RPC Extensive burn-in debugging taking place in labs HCAL/ECAL/RCT/TTC/GCT/GT/TKR/EMU/RPC Subsystems have been profiting from the availability and gaining valuable experience in integration/commissioning Problems are being found - and fixed Often subtle problems which only show up in the integration environment of trying to run many systems at once.

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 12 HCAL-SLB-RCT Integration in EIC - Maryland, Lisbon, Wisconsin Sent synchronous jet data from HCAL HTR Cards thru 6 SLB over 10m copper 4Gb/s Vitesse Links to 6 Regional Calorimeter Trigger Receiver Mezzanine cards, thru Receiver Cards, Backplane and Jet Summary Card to Jet Capture Card that records the output of 256 crossings. Observed output jets on all channels in expected crossings.

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 13 CSC Track Finder Integration - Florida, Rice, UCLA Slice Test: cosmics running now! preparing full readout and self triggering of a whole trigger sector (60 o ). Since April 05 self-triggering with as close to nominal CMS setup as possible used to pass data CSCs to global DAQ. Goal: magnet test with 1/12th of the fully functioning CSC detector system EIC Integration Integration tests with Drift Tube Track Finder underway Have CSC TF crate running in EIC Now have full crate working at Florida (above)

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 14 CSC Trigger Integration with Global Muon & Global Triggers Muon Sorter Board Rice Muon Sorter sorts Sector Processor muons & transmits to Vienna Global Muon Trigger: Integration Test successful

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 15 DStore Cell (TS) Cell (GCT) … Cell (GT) DB HTTP interface (JSP/TOMCAT) RC session (FM) TS client (Web page) Cell (ECAL) DB SOAP interface (XDAQ) Run Control Trigger Supervisor Database side Configuration / conditions DB Trigger Software Configuration data Use CMS Configuration DB Infrastructure Trigger Supervisor (see below) Integrate with Run Control and trigger sub-systems Trigger testing and monitoring Translate Integration Test Plans into Software  Bldg 904 setup Trigger Online Monitoring  Use DAQ Monitoring Infrastructure

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 16 The Trigger Supervisor GUI Vienna & Wisconsin Integrated with RCT, ECAL, GT, CSC, GMT All subdetectors producing TPGs are being integrated with configuration DB with Trigger Supervisor

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 17 Trigger Supervisor Demonstrator Central Cell GT Cell RCT Cell GMT Cell gtswpc1.cern.ch: :1972 Pcyestercm.cern.ch:1972 Pcwiscms.cern.ch:1972 Web browser Marc, Wisconsin Philipp, HEPHY Tobias, HEPHY Monika, Wisconsin Ildefons, HEPHY 3 nations, one trigger supervisor! Switzerland FranceAustria

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 18 Install/CommissionInstall/Commission Magnet Test (a.k.a. Cosmic Challenge) : Drift Tube Trigger: Main trigger along with RPC Trigger with dedicated logic CSC Trigger: 40  (or 60  ) Slice: 24 CSCs from Sector 5, overlaps DT sectors 10, 11 SP  Clock & Control Board  Local Timing Controller Calorimeter Trigger: Existing HCAL  RCT  JCC system brought to point 5 on demand provides full HCAL module trigger Trigger provided to all participating subsystems USC55: Planned start April 2006 All trigger systems first tested in Prevessin 904 Nothing is installed in a rack for the first time in USC55

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 19 Commissioning Tasks in 2006 Engineers: Revise firmware Replace testing firmware with operations firmware Monitoring Implement voltage/temperature detector controls Timing & Control Build up timing & control signal distribution systems Software Develop APIs for integration with software Physicists: Diagnostics, emulators, simulation code, interfaces and integration with other CMS systems.

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 20 Trigger Install Schedule - I Install/Commission Trig. Crates: Apr ‘06 - Sep ‘06 Tested Trigger Crates installed, re-tested, interconnected, inter-synchronized Regional and Global Detector trigger systems integrated with each other and Global Trigger Integrate w/Detector Elect.: May ‘06 - Oct ‘06 Phase 1 in USC55, Phase 2 in UXC55 Cal Trig connected to E/HCAL USC55 electronics Muon Triggers connected to optical fibers carrying trigger data from detector in UXC55 Global Trigger connected to TTC distribution system Operation with Local DAQ

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 21 Trigger Install Schedule - II Integrate w/Central Trig. & DAQ Oct ‘06 - Mar ‘07 Subset of triggers available to detectors in UXC55 Dedicated testing with individual detectors Detailed synchronization testing of all systems Testing with Central DAQ System CommissioningApr ‘07 - Aug ‘07 Full capability of trigger system available Tests with all detectors and trigger operating simultaneously together and partitioned Trigger and DAQ can operate in 8 separate partitions Ready for Data Taking August, 2007

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 22 SLHC Upgrade Planning Luminosity upgrade x10 – SLHC : L = cm -2 s -1 Extends LHC mass reach by ~ 20-30% with modest changes to machine Detector upgrades needed -- especially the trigger & tracker Time scale ~ 2015 Attempt to restrict upgrade to post-Trigger Primitive electronics as much as possible where detectors are retained Only change where required -- evolutionary -- some possible pre-SLHC? SLHC Upgrade Committee Members - Tracker: G. Hall, ECAL: P. Busson, HCAL: A.Baden, Muon: C. Wilmott, Trigger: W. Smith, Computing/Physics: D. Acosta, Microelectronics: A. Marchioro, Opto- electronics: F. Vasey, Electronics Coordinator: J. Nash, Spokesperson, Deputy Spokesperson, Technical Coordinator, Deputy Technical Coordinator Meeting During Electronics & CMS Weeks Next Meeting: CMS Week March 2006 Planning for April Workshop April 3/ Perugia

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 23 SLHC Trigger Upgrade LHC: Level 1: Regional to Global Component to Global SLHC Proposal: Combine Level-1 Trigger data between tracking, calorimeter & muon at Regional Level at finer granularity Transmit physics objects made from tracking, calorimeter & muon regional trigger data to global trigger Implication: perform some of tracking, isolation & other regional trigger functions in combinations between regional triggers New “Regional” cross-detector trigger crates Leave present L1+ HLT structure intact (except latency) No added levels --minimize impact on CMS readout

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 24 SLHC L-1 Trigger R&D New Features: 80 MHz I/O Operation Level-1 Tracking Trigger Inner pixel track & outer tracker stub Reports “crude” P T & multiplicity in ~ 0.1x 0.1    Regional Muon & Cal Triggers report in ~ 0.1 x 0.1    Regional Level-1 Tracking correlator Separate systems for Muon & Cal Triggers Separate crates covering    regions Sits between regional triggers & global trigger Latency of 6.4  sec R&D program & technologies motivated by needs: Complicated Algorithms & Low Latency: FPGA’s: faster, more logic -- less custom logic -- programmable Faster and larger memories Moving more data at higher speed: Link technology: speed & integration Backplane technology: connectors & newer interconnect technology Higher Crossing Frequency: High speed clocking: low jitter - design for links Overall Complexity: Design for test, diagnostics, algorithm validation

W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 25 Trigger 2006 Summary Good Progress on all fronts: CAL & EMU Triggers finished production Operations at CERN underway Integration tests complete or underway Software is in use and development continues Main Activity in ‘06-7: Installation: Time is tight to accomplish the necessary tasks Steps taken, planning established to meet schedule Tests: Surface Tests in SX5, incl. Magnet Test in Spring ‘06 Extensive use of Electronics Integration Center Careful layout and plan for USC55 starting Apr. ‘06 Upgrade R&D: Design work: build on evolving concepts for higher luminosity Investigate enabling technologies to understand implementation