1 Operational availability Optimizing LHC L. Ponce With the (un)intentiona lcontribution of all OP crew.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

LHC Beam Operation WorkshopM. ZerlauthDecember 2010 Thanks to : CERN Machine Protection Panel, EICs, et al 1v0 Do we understand everything about MP system.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
How to improve operational efficiency ? [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] Beam Commissioning Workshop, Evian Jan 2010.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
Introduction to availability modelling in ELMAS Arto Niemi.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
Premature Dumps in 2011 Acknowledgements: A.Macpherson, G.Papotti, M.Zerlauth M.Albert LHC Beam Operation Workshop December 2011.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
TRACKING OF FAULTS AND FOLLOW-UP Accelerator Fault Tracking project Jakub Janczyk (TE-MPE-PE / BE-CO-DS) with input from: Andrea Apollonio, Chris Roderick,
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
1 Machine considerations and constraints for the Safe Injection Flag and Safe Beam Flag Jörg Wenninger AB-OP-SPS Introduction to ‘injection flags’ Machine.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
1v2 LHC Availability Tracking: Past and Future B. Todd, A. Apollonio, L. Ponce on behalf of the LHC AWG.
1 Commissioning and Operation of the machine protection system L. Ponce Acknowledgements: M. Zerlauth, J. Wenninger, D. Wollmann, V. Chetvertkova, G. Valentino,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
LHC Beam Commissioning Meeting V. Kain & R. Alemany
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
SPS extraction, transfer lines, injection
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
Summary of week 7 Hardware Commissioning:
Operational Issues L. Ponce.
Turnaround: from LHC to FCC?
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Monday 11/07: Recovery Plenty of accesses.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Summary of Week 16 G. Arduini, J. Wenninger
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Scrubbing progress - 08/12/2012
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Summary Tuesday h23: Machine closed. Precycle started.
Friday 15th February - morning
Another Immortal Fill….
Presentation transcript:

1 Operational availability Optimizing LHC L. Ponce With the (un)intentiona lcontribution of all OP crew

What do I call “Operational availability”? 2 “everything which is not an equipment fault“  It includes:  dumps due to exceeded thresholds  Hidden effects (no PM, no fault):  set-up time  “Cooling” time  mistakes (expert/OP)  Not discussed today:  Cycle or sequence optimization (ramp/squeeze…)

Contents 3  What dumped the beams (other than a trip)?  From the Post Mortem files  Disentangle the dump causes which just need a restart  What cost extra time in the cycle?  From the OP e-logbook  Try to find what is not the nominal preparation time

Source of data 4 Post Mortem server:  1 PM file for every dump  All PM files signed (= commented) by operator  All PM above injection energy analyzed by MPP List of predefined cause: ­ Access ­ Coll ­ Losses ­ Transverse instabilities ­ QPS ­ Programmed dump ­ Other ­...

Source of data 5 OP e-logbook:  Manual entry for each fault (= 1 line)  Manual entry for start and end time Also list of predefined faulty system, but different: ­ Beam Instr. ­ Coll ­ Controls ­ Cryo ­ Injection ­ QPS ­ RF ­ SPS ­ PS ­ Technical services ­ Vacuum ­...

Post Mortem : Dump Cause – Test End of Fill 345 dumps B. LHC Beam Operation Workshop Evian 2012 only above injection energy

Different numbers from PM 7 PM category End Of Fill9711% HW fault % threshold25230% Expert/OP errors708% MPS test12514% Total870 All PM from 2012 classified by hand :  870 = Total number of PM from 1 st of March till 6 th of December  Category based on OP comment Threshold = BPM, BLM, AG thresholds or SIS limits exceeded (whatever are the running conditions) => Can restart without repair  Potential high gain if we manage to decrease the occurrences

Details by system 8 Dumps causeTotal 2012HW*Thresholds*Errors* Beam losses + UFO QPS56 00 PC35 00 Electrical Supply + Water RF + damper Feedback Vacuum17890 BLM Cryogenics14 00 Collimation12525 Controls12 00 BPM8350 SIS + orbit4220 Exp10352 BCM Access System2200 Not specified in PM server Looking at the occurrences only (EOF and test excluded = 135 dumps) Purely “dynamic” Purely HW Mixed

Details “thresholds exceeded” 9  Including the dumps at injection: Dumps causeOnly above injection All dumps Beam losses + UFO RF + damper (inc. setting-up)27 Feedback44 Vacuum914 BLM11 Collimation (inc. TDI)28 BPM560 Orbit16 Exp55 BCM1113 OP12 Test and development88 Injection quality (BLM/BPM)024 Set-up09 Significant contribution:  from UFO and losses above BLM thresholds  from BPM “false trigger” at injection)  from injection “quality” (first input =BPM or BLM or Orbit)

Possible gain? 10  Even if dumps at injection energy are faster to recover, still could easily gain 30min (PM signature + recovery sequence, back to pilot…)  How can we reduce the number of dumps?  BPM setting-up for each new type of beam  Better preparation for beam set-up/MD  revisiting BLM thresholds: UFO and BLM working groups)?  But we already relaxed/adjusted thresholds in 2012

Closer look at fault duration 11  The goal was to try to understand the components of the average turn-around time to be able to extrapolate for higher energy run  What is the precycle contribution, what are the “hidden” downtime?  Source of data is the OP e-logbook fault entries (manual)  E-logbook is first a track of OP facts and actions  With the statistics tool:  Inconsistent data, not really satisfactory

Faults in the e-logbook 12  Some numbers :  515 entries (all manual for LHC) in Beam Setup, MD or Proton Physics machine mode subtracting injectors problems.  Only 182 are related to an automatic PM entry  To be compared with the 648 PM unprogrammed entries  169 are followed by a precycle (fixed time)  191 needed an access to fix the problem  Precycle give a fix extra duration in the turn-around  Frequency of access also linked with the precycle number  Far from complete picture of what happened

Problem in the data 13  Definition of a “fault” for the machines = period without beam (automatic entries based on BCT data for SPS)  Does not work for LHC as long preparation time (ramp down or precycle)  Duration of a fault is not fair:  Precycle included or not  Parallel faults are added  Not possible to suspend a fault  Exemple: network glitch fault of 1 s at 10:06, beam back only at 14:30 because a patrol was needed  More discipline, clear definition needed  slightly modified tools also needed to have realistic statistics  Most of what is needed is already in the logbook but need adaptation based on 2012 run experience

details by equipment 14 Fault categorytotalrelated to a PMPrecycle needed Access needed Access Beam dump28929 Beam instrumentation Collimator29202 Controls21524 Cryogenics Injection31445 Miscellaneous Operation2200 Power converters QPS RF Technical Services Vacuum  More discipline needed to have realistic statistics

MKI Heating 15  Appeared with higher intensity  Was registered in the logbook from the ready to inject:  More than 23 extra hours waiting  After LS1:  Ceramic chamber changed (24 stripes instead of 24)

TDI heating 16  Appeared also with high intensity circulating beams  Steps lost  Blocking injection: cannot restore the injection settings, experts intervention needed  Some 25 hours lost at injection in Spring 2012  Cured by opening to parking position when circulating beams  After LS1:  Complete service of the step motors during LS1+ parking position as soon as injection completed

Transfer line steering 17  Mandatory set-up time:  Limit injection losses and injection oscillations  Experts needed  Really difficult to evaluate the time spent in steering from the logbook data:  Some 10 hours recorded, but under-estimated  Improvement along the run:  Shift crew to do “standard” steering  After LS1:  Properly tag the time spent in steering  Need of better diagnostics (TL steering or beam quality in the injectors)

Future 18  Difficult to conclude on the operational availability because of not precise enough tracking  To improve the situation after LS1, we need:  To really have a fault or an event register for each PM  To register if precycle/access is needed  to quantify where time is spent abnormally in the cycle (mainly at injection)  Based on the previous analysis attempt, a list of requirements to adapt the e-logbook and the PM server is ready:  To allow a proper flag of the different beam set-up phases: test cycle, TL steering, commissioning...  To ease the tracking on a weekly basis : 1 OP responsible  Now that we know a bit more what to look at, we know better what we need to register