New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.

Slides:



Advertisements
Similar presentations
Session 6 Outline Overview of program requirements. Defining your program. Program components. Overview of BMPs. Maintenance inspection. Employee education.
Advertisements

Los Angeles County MS4 Permit Reissuance: New Directions & Strategy Presented by LA Regional Water Quality Control Board Southern California Water Dialogue.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Pretreatment, Pollution Prevention and Storm Water Committee California’s Storm Water Program Bruce A. Fujimoto State Water Resources Control Board February.
MRP Pollutants of Concern Copper Provisions Monday November 20, 2006 Richard Looker - RWQCB.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Module 7: Construction Phase
Horsley Witten Group, Inc. Public Workshop Typical Maintenance Costs January 19, 2011 Several Slides Courtesy of Center for Watershed Protection Rhode.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Forest harvesting practices are a suite of BMPs that minimize the environmental impacts of road building, log removal, site preparation and forest management.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Introduction to MS4 Stormwater Requirements (2009)
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
EPA Chesapeake Bay Trading and Offsets Workplan June 1, 2012.
Regulatory Refresher What Construction Site Inspectors Need to Know about the MRP Kristin Kerr, P.E., QSD EOA, Inc. Construction Inspection Workshop April.
Illicit Discharge Detection and Elimination 6/4/20161 Illicit Discharge Detection and Elimination.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
NC Phase I Perspective Steps undertaken by Charlotte for Post-Construction Controls SC Stormwater Forum May 8, 2007.
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
Phase II National Storm Water Regulations What’s in it for you?
From the Beginning Design Standards and Other Post-Construction Program Elements.
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
An Overview of our Community’s Stormwater Management Program
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Public Education and Participation 12/25/20151 Public Education and Participation.
Lessons Learned from Past MS4 Audits 1/3/20161 Lessons Learned from Past MS4 Audits.
Using the MS4 Program Evaluation Guide 1/28/20161 Using the MS4 Program Evaluation Guidance.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
Pollution Control: For Field Office Construction Sites.
N.O.T. Paperwork and Recorder of Deed Requirements NPDES & PCSM Permitting Workshop May 24, 2016.
Erosion and Sediment Control Ordinance. City of Southlake Strategy Map Live Our Core Values The City of Southlake provides municipal services that support.
Supervisor, RIDEM RIPDES Permitting Program
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Land Use and Zoning Committee Special Workshop
Sacramento County Stormwater Quality Program
Stormwater Control Transfer Program Overview January 31, 2018
Stormwater Management Program
MS4 = Municipal Separated Storm Sewer System
Sacramento County Stormwater Quality Program
Presentation transcript:

New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment

New Development and Significant Development 12/21/20152 Phase II Minimum Control Measure Post-Construction Stormwater Management in New Development and Redevelopment Develop a program, using an ordinance or other regulatory means, to address runoff from new development and redevelopment projects that disturb > 1 acre Implement strategies with a combination of structural and/or non-structural BMPs Ensure adequate long-term operation & maintenance (O&M) of BMPs

New Development and Significant Development 12/21/20153 Phase II Minimum Control Measure:  The BMPs chosen should:  be appropriate for the local community  minimize water quality impacts  attempt to maintain pre-development runoff conditions Participate in watershed planning efforts Assess existing ordinances, policies, and programs that address stormwater runoff quality Provide opportunities for public participation 3

New Development and Significant Development 12/21/20154 EPA Resources Low Impact Development  Smart Growth   Using Smart Growth Techniques as Stormwater Best Management Practices  Stormwater Guidelines for Green, Dense Redevelopment.  Protecting Water Resources with Smart Growth National Management Measures to Control Nonpoint Source Pollution from Urban Areas  Post Construction Guidance Manual coming Fall 2007

New Development and Significant Development 12/21/20155 Auditing/Inspecting a New Development Program Specific new development requirements can vary significantly within the state How does the MS4 apply the new development standards in the MS4 permit? Does the MS4 have a stormwater manual? Base your audit/inspection primarily on enforceable conditions in the permit If permit is not specific, determine if the MS4’s new development program addresses the following components.

New Development and Significant Development 12/21/20156 Common Program Components Legal Authority Stormwater Design Standards Plan Review and Approval Construction Inspection of New Development Controls Maintenance/Enforcement Tracking and Monitoring Training and Education

New Development and Significant Development 12/21/20157 Legal Authority Does the MS4 have the legal authority (ordinance) to:  Require stormwater considerations during new development and redevelopment planning  Specify contents of plans  Establish standards for BMPs performance  Inspect BMPs during and after construction  Require compliance with the approved plans  Require maintenance of the BMP for the life of the structure What exemptions does the legal authority allow?

New Development and Significant Development State Water Board Order WQ Precedential decision on Standard Urban Storm Water Mitigation Plans (Development Standards) Development standards require treatment controls for new and significant redevelopment projects Regional Board MS4 permits must be consistent with the State Board’s decision

New Development and Significant Development Provisions applicable to all categories Peak storm water runoff discharge rate Conserve natural areas Minimize storm water pollutants of concern Protect slopes and channels Provide storm drain system stenciling and signage Properly design outdoor material storage areas

New Development and Significant Development Provisions applicable to all categories Properly design trash storage areas Provide proof of ongoing BMP maintenance Design standards for structural or treatment control BMPs  Volume or flow based standard

New Development and Significant Development SUSMP Numerical Design Standards Design standards for volumetric treatment control BMPs:  85 th percentile 24-hour rainfall event  Volume of runoff to achieve 80% volume treatmetn  0.75 inch storm event Design standards for flow based treatment control BMPs:  0.2 inches/hour intensity  Two times the 85 th percentile hourly rainfall intensity

New Development and Significant Development 12/21/ Stormwater Design Standards Does the MS4 have clear, specific Stormwater Design Standards? Do the standards:  Set minimally acceptable BMPs and sizing criteria?  Address source controls as well as treatment controls?  Address BMPs for different pollutants?  Provide incentives (credits) for innovative practices (like reduced impervious surfaces, buffers, etc.)  Allow exemptions? What are the minimum thresholds for when the standards apply? Does the MS4’s ordinance require compliance with the stormwater design standards?

New Development and Significant Development 12/21/ Local Stormwater Manuals The Center for Watershed Protection’s Stormwater Manager’s Resource Center summarizes the basic requirements in a local stormwater design manual

New Development and Significant Development Example: City of Los Angeles-BMP Manual

New Development and Significant Development Select the most efficient BMP for the pollutant(s) generated

New Development and Significant Development

12/21/ Plan Review and Approval How does the MS4 review and approve stormwater plans for new development and redevelopment?  How early in the planning process is stormwater addressed (e.g., conceptual planning stage?)  Is the review based on the MS4’s Stormwater Design Standards?  Does the MS4 document the process for plan review and approval (e.g., use a checklist)?  Are requirements for long-term O&M addressed during review?

New Development and Significant Development 12/21/ Plan Review and Approval – File Review Conduct a review of the following types of files: Approved plan(s) for a private project with post-construction controls and one for a public project  Do approved plans follow MS4 standards? Are they detailed? Did the MS4 provide detailed comments to the developer? Approved maintenance agreement(s)  Do the maintenance agreements discuss maintenance responsibilities, inspection requirements, when maintenance may be needed, etc.? Inspection/enforcement file(s) for completed projects with post-construction controls  How detailed are inspection reports? What type of enforcement actions are taken?

New Development and Significant Development Example: Stormwater Requirements Applicability Checklist /pdf/ds-5601stormwtr.pdf

New Development and Significant Development Example: Design Checklist

New Development and Significant Development 12/21/ Construction Inspection of New Development Controls Do construction inspectors verify that “post-construction” BMPs have been installed? Are inspectors trained on post-construction BMP design and installation? Are as-built plans developed? How is this information transferred to maintenance inspection staff?

New Development and Significant Development New Development Example Santa Monica, CA City sends out a form to all owners of structural stormwater controls each year asking if the control had been inspected and maintained Owners who do not respond are prioritized for inspection by the City

New Development and Significant Development 12/21/ Maintenance How often does the MS4 inspect post-construction BMPs?  BMPs on private property; BMPs on public land? How does the MS4 ensure maintenance on private property? (maintenance agreements, MOUs, etc) Who maintains post-construction BMPs?  MS4, private landowner, combination ?

New Development and Significant Development 12/21/ Enforcement What type of enforcement options does the MS4 have to ensure post-construction BMPs are installed and maintained? Does the MS4 have an escalating enforcement plan to document steps that will be taken to address non- compliance Are staff educated on how to use penalty provisions when necessary? How often are the enforcement options used?

New Development and Significant Development 12/21/ Tracking and Monitoring How does the MS4 track the installation and maintenance of post-construction BMPs? Do they collect information on BMP types, locations, owners, maintenance schedules, inspection findings, etc.? How does the MS4 assess the effectiveness of post- construction BMPs?  Is this information sent back to plan review and inspection staff?

New Development and Significant Development 12/21/ Example: BMP Effectiveness Protocols Technology Acceptance Reciprocity Partnership (TARP) – CA, MA, MD, NJ, PA, VA  techservices/tarp/  A uniform method to collect and evaluate data on technology performance and cost Washington’s Technology Assessment Protocol (TAPE)  tape_ctape.html  Intended for ultra-urban treatment technologies and those treatment technologies that do not have a chemical component for treatment

New Development and Significant Development 12/21/ Training and Education What type of training on new development does the MS4 provide to:  Plan review staff  Construction inspectors  BMP maintenance inspectors  Code enforcement, others? Does the MS4 also educate local developers and engineers so they develop adequate plans? Does the MS4 educate property owners on maintenance of BMPs?

New Development and Significant Development 12/21/ In-Field Activities Inspect post-construction BMPs to determine whether they are still installed and maintained  Use final, approved plans for the project  Assess whether both structural and source control BMPs were installed  Were any BMPs removed or modified?  Are the BMPs being maintained?

New Development and Significant Development 12/21/ Common Compliance Problems MS4 lacks specific standards for post-construction controls MS4 lacks review criteria, checklists, or a formal plan review process MS4 does not require maintenance of post- construction BMPs MS4 does not have a system to track structural and source control BMPs for inspections and on-going maintenance