AMS TIM & General Meeting ACC Testbeam Performance & KSC Cosmic Data Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, JSC Gilruth Center Houston, 24th.

Slides:



Advertisements
Similar presentations
Dec/02/04 Su DongCaltech Trigger/DAQ/Online workshop1 Level 1 Trigger: Introduction L1 trigger objects and strategy Implementation features L1 composition.
Advertisements

AMS Software Review ACC Slow Control Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
Invariant mass plot for different geometry schemes using HSD generator Hemen Kalita*,B Bhattacharjee*, P Bhaduri and S Chattopadhyay * Dept of Physics,
E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
The performance of Strip-Fiber EM Calorimeter response uniformity, spatial resolution The 7th ACFA Workshop on Physics and Detector at Future Linear Collider.
13/02/20071 Event selection methods & First look at new PCB test Manqi Ruan Support & Discussing: Roman Advisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua))
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
1 W’  tb  lnubb: the first read. 2 introduction sample: W’  tb  lnubb generator: PYTHIA number of events: 5000 will only use events in the good run.
Study of two pion channel from photoproduction on the deuteron Lewis Graham Proposal Phys 745 Class May 6, 2009.
The Time-of-Flight system of the PAMELA experiment: in-flight performances. Rita Carbone INFN and University of Napoli RICAP ’07, Rome,
T. Horn, SHMS Optics Update SHMS Optics Update Tanja Horn Hall C Users Meeting 31 January 2009.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
PPR meeting - January 23, 2003 Andrea Dainese 1 TPC tracking parameterization: a useful tool for simulation studies with large statistics Motivation Implementation.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
K1.8 meeting Report from E05 group Toshiyuki Gogami 26 Dec 2014.
Tracking at LHCb Introduction: Tracking Performance at LHCb Kalman Filter Technique Speed Optimization Status & Plans.
Spasimir Balev /CERN/ mrad 3 LKr simulation: – very slow, so only events with interesting topology are fully simulated: –  + with.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
SLAC, HiRes T-461: “FLASH” part 1 Justin Findlay.
Lake Louise Winter Institute, 23rd February, Cosmic Ray Velocity and Electric Charge Measurements in the AMS experiment Luísa Arruda on behalf of.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
1 Energy loss correction for a crystal calorimeter He Miao Institute of High Energy Physics Beijing, P.R.China.
21 Jun 2010Paul Dauncey1 First look at FNAL tracking chamber alignment Paul Dauncey, with lots of help from Daniel and Angela.
MEG Run 2008 液体キセノンガンマ線検出器 東京大学 素粒子物理国際研究セン ター 西村 康宏、 他 MEG コラボレー ション 2008 年秋季物理学会@山形大学小白川キャンパス.
Search for Electron Neutrino Appearance in MINOS Mhair Orchanian California Institute of Technology On behalf of the MINOS Collaboration DPF 2011 Meeting.
W-DHCAL Analysis Overview José Repond Argonne National Laboratory.
Electroweak and Related Physics at CDF Tim Nelson Fermilab on behalf of the CDF Collaboration DIS 2003 St. Petersburg April 2003.
Secondary Vertex reconstruction for the D + Elena Bruna University of Torino ALICE Physics Week Erice, Dec. 6 th 2005.
PID simulations Rikard Sandström University of Geneva MICE collaboration meeting RAL.
Start and Vertex Detector W. Boeglin, A.Klein Current Design: 3300 scintillating fibers 1mm diameter 3 double layers (1 axial, 2 stereo) cylindrical geometry.
Optimization of Analysis Cuts for Oscillation Parameters Andrew Culling, Cambridge University HEP Group.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
1 Muon Veto System and Expected Backgrounds at Dayabay Hongshan (Kevin) Zhang, BNL DayaBay Collaboration DNP08, Oakland.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
1 M2-M5 Efficiency and Timing checks on 7TeV beam data Alessia, Roberta R.Santacesaria, April 23 rd, Muon Operation
AMS Software Review ACC DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
Progress Report on GEANT Study of Containerized Detectors R. Ray 7/11/03 What’s New Since Last Time?  More detailed container description in GEANT o Slightly.
Tomas Hreus, Pascal Vanlaer Overview: K0s correction stability tests Jet-pt correction closure test Study of Strangeness Production in Underlying Event.
Know How at LLR Ultra-granular calorimetry AFTER vs CHIC 1F. Fleuret - LLR11/05/ LPSC.
TOF Reconstruction, Calibration & Test-beam Simulation Jiang Linli 2005/6/1 (13th BES Annual Meeting )
LAV efficiency studies with photons T. Spadaro* *Frascati National Laboratory of INFN.
AMS Software Review ACC Analysis Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
MEG 実験 2009 液体キセノン検出器の性能 II 西村康宏, 他 MEG コラボレーション 東京大学素粒子物理国際研究セン ター 第 65 回年次大会 岡山大学.
Testbeam analysis Lesya Shchutska. 2 beam telescope ECAL trigger  Prototype: short bars (3×7.35×114 mm 3 ), W absorber, 21 layer, 18 X 0  Readout: Signal.
M. Ellis - MICE Collaboration Meeting - Wednesday 27th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
1 Report on analysis of PoGO Beam Test at Spring-8 Tsunefumi Mizuno July 15, 2003 July 21, 2003 revised.
Mitglied der Helmholtz-Gemeinschaft Hit Reconstruction for the Luminosity Monitor March 3 rd 2009 | T. Randriamalala, J. Ritman and T. Stockmanns.
MICROMEGAS per l’upgrade delle Muon Chambers di ATLAS per SLHC Arizona, Athens (U, NTU, Demokritos), Brookhaven, CERN, Harvard, Istanbul (Bogaziçi, Doğuş),
PEBS: Positron Electron Balloon Spectrometer Henning Gast
New TRD (&TOF) tracking algorithm
The MiniBooNE Little Muon Counter Detector
Theoretical Motivation Analysis Procedure Systematics Results
Gamma-ray Large Area Space Telescope
Tracking System at CERN 06 and 07 test beams
Interactions of hadrons in the Si-W ECAL
SAC/IRC data analysis Venelin Kozhuharov for the photon veto working group NA62 photon veto meeting
Muon momentum scale calibration with J/y peak
DT Local Reconstruction on CRAFT data
Slice Test: Preliminary Data Analysis The Ohio State University
Reddy Pratap Gandrajula (University of Iowa) on behalf of CMS
Rick Salcido Northern Illinois University For CALICE Collaboration
GEANT Simulations and Track Reconstruction
Hall C Users Meeting 31 January 2009
Mini Tower Preliminary Results
Michele Faucci Giannelli
Contents First section: pion and proton misidentification probabilities as Loose or Tight Muons. Measurements using Jet-triggered data (from run).
Covering a Large Area ILC-TPC endplate
Presentation transcript:

AMS TIM & General Meeting ACC Testbeam Performance & KSC Cosmic Data Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, JSC Gilruth Center Houston, 24th January 2011

August Testbeam → ACC Inefficiency Studies Beam Rotation stand

August Testbeam Configuration 4 positions for ACC-test (1) panel (8mm thickness), exchanged PMT(3) slit region (2x4mm thickness), shared PMT (2) panel (8mm thickness), original PMT(4) slit region (2x4mm thickness), separate PMT 180 GeV proton-beam Ø beamspot: ~ 3 cm

4 Event Selection Requirements: - Trigger from Upper TOF - Single reconstructed TRD-Track - TRD-Track matching beam config. - matching TOF-hit positions

5 TOF-hit matching TRD track TRD track – center of TOF panel good event

6 Event Selection Requirements: - Trigger from Upper TOF - Single reconstructed TRD-Track - TRD-Track matching beam config. - matching TOF-hit positions

7 Requirements: Trigger from Upper TOF Single reconstructed TRD-Track TRD-Track matching beam config matching TOF-hit positions Event Selection

8 Inefficiency (only TRD-Track) ACC inefficiency: I < 6.00 · % CL) requirement: Idesign < 10-4 Missed Events Panel (8 mm thickness) (P1, P2): 0 out of259,245 → I < 1.16·10 -5 Slit region (2x4mm thickness), shared PMT (P3): 0 out of125,010 → I < 2.40·10 -5 Slit region (2x4mm thickness), different PMT (P4): 1 out of144,268 → I < 4.00·10 -5 ~6cm P4P1P2P3 8mm panel region: ~73% slit region: ~27%

9 Event Selection using Tracker Requirements: - Trigger from Upper TOF - Single reconstructed TRD-Track - TRD-Track matching beam config. - matching TOF-hit positions - Tracker information Tracker information (3 Tracker-layers below TRD)

10 Requirements: Trigger from Upper TOF Single reconstructed TRD-Track TRD-Track matching beam config matching TOF-hit positions min. 2 matching TrCluster-hits on first 3 layers below TRD linear fit / check for chi² track predicts ACC-hit Event Selection 322,884 events after all cuts

11 TrCluster: - distance from all Cluster-hits to extrapol. TRD-track - x & y coordinate of nearest hit is within TRD-track- uncertainty (~1cm) Matching Tracker-hits

12 Matching Tracker-hits TrCluster: distance from all Cluster-hits (incl. multiplicity) to extrapol. TRD-track x & y coordinate of nearest hit is within TRD-track- uncertainty (~1cm) multiplicity

13 Fit Quality of Tracker track min. 2 matching hits on 3 Tracker-layers below TRD fit linear Track through points, not including bending in y-direction check for chi²

14 Dimensions panel width:22 cm beamspot Ø: 3 cm Slit region (nut & spring) width of slit region between panel: 0.6 cm Inefficiency Missed Events and Inefficiency Panel (8 mm thickness): 1 out of304,022 → I < 1.90·10 -5 Slit region (2x4mm thickness), shared PMT: 0 out of 9,450 → I < 3.17·10 -4 Slit region (2x4 mm thickness), different PMT: 0 out of 9,412 → I < 3.18·10 -4

15 ~97% ~3% of total scintillator-area ACC Inefficiency: I < 1.89 · % CL) requirement: Idesign < 10-4 Inefficiencies Panel (8 mm thickness): I < 1.90·10 -5 Slit region (2x4mm thickness), shared PMT: I < 3.17·10 -4 Slit region (2x4mm thickness), different PMT: I < 3.18·10 -4 single inefficiencies weighted corresponding to area Dimensions panel width:22 cm beamspot Ø: 3 cm Slit region (nut & spring) width of slit region between panel: 0.6 cm Inefficiency

16 ADC-Spectra for 180 GeV p-Beam Typical ADC-spectra as input for MC-studies

17 TDC-Spectra for 180 GeV p-Beam Typical ADC-spectra as input for MC-studies

KSC Cosmic Data Period → ACC Stability

19 - TRD-track for prediction of ACC-hit - only the center of panel is taken into account 2010 KSC Cosmic Data Period Wake Ram

KSC Cosmic Data Period ACC Signal MOP / 10,000 events Zoom..

KSC Cosmic Data Period ACC Stability ACC Signal MOP / 10,000 events In the same configuration period, all 16 PMTs are stable less than 2% level

KSC Cosmic Data Period ACC Stability Wake +ZRAM +Z Wake -ZRAM -Z