CERN 7-11-5 adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Status Update on Mechanical Prototype in Rome November 6,
Walls crates cables gas chambers electronics CERN adb.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
T.Schneider/LHCb Muon EDR
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
January 25, 2005GRETINA 2004 Review1 GRETINA 2004 Annual Review Steve Virostek Lawrence Berkeley National Lab Mechanical System.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Status of RICH mechanical design at PNPI E.Vznuzdaev for PNPI group: V.Dobyrn, A.Khanzadeev, E.Kormin, V.Lebedev, N.Miftakhov, V.Polyakov, V.Samsonov,
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Installation of the T600 at Fermilab CSN2, September 22,
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
Installation of the T600 at Fermilab Fermilab, February 15,
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Update on Pavia MM mechanical prototype
VELO-installation meeting CERN, January 17, 2006
nSW Alignment Installation
Far Detector Activities Late 2017 – Early 2018
Pierre-Alexandre Thonet
Module/Ladder Assembly
A 6 mm cable with a length of 15 m has been installed
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled prior to installation - Plans for the Installation of the support panels

2 m 2,4 cm

1,5 m M2 prototype at LNF transport & positioning M2 proto

precision pin glue rivets assembly steps M2 proto

3 panels 4 panels M2 proto

photogrammetry (50  m) in horizontal position of the holes for rivets (our main reference; much better than our needs  0,5 mm) M5 real

Accuracy of Industrial photogrammetry Accuracy of Cospal’s industrial photogrammetry = 1/ (certified by GSI) 8 microns per 1,0 meter of object size Conditions: Photographs: from at least 2 different heights and from varied geometry. Coded targets: 8 or more (we use 14 coded targets). Scale bars: 2 or more (we use 2 scale bars). Observations: each point seen at least 6 times. Plan quality factor: between 1.00 and Image space RMS: < 0.3 micron Scale bar agreement: better than 0.05 mm Point RMS: better than mm in each direction. slide from COSPAL

Accuracy of Industrial photogrammetry The measurement was performed on a 3D- measuring machine, type PM , brand Leitz, at MAN Technologie AG in Ausburg (Germany). This type of measuring machine scans the surface mechanically whit a tip. The machine is installed in an air-conditioned room on a concrete plate which is supported by air bearings for vibration insulation. The measuring error is about 6 micron (absolute). For having a comparison reference on the measurements we have carried out through the photogrammetry system, we have measured one panel using a different measuring system having a better accuracy. Cospal’s photogrammetryRms 54,5 micron MAN 3D-Measuring machine (DEA)Rms 54,2 micron slide from COSPAL

delivery of two half-stations (PS & UZ) at the same time: long term stockage (3 - 4 months) M5 real M5 ready before end November; then two half-stations every two weeks (delivery completed at end of January)

lifting tools prototype design fixation joints

activities before installation SC document under preparation by Alessandro summarizing the calculations done to ensure that the walls and their assembling are adequate for our purpose: panels, connections, fixation joints, chamber supports final lifting system design (structural analysis) resistance verification of lifting system material procurement (all orders sent before middle December) PPSPS under preparation by Alessandro to finalize procedures for a safe assembling in the area transport to the pit of materials and installation tools (January) + working spaces organization

- panels arrival at Bld 156/similar spaces - lifting tools installation in the pit - panels transport to the pit installation sequence 1 panel in vertical position 2 chamber supports fixation 3 grounding copper braid fixation 4 cable supports 5 panel lifting 6 positioning of the following panel 7 gluing & riveting 8 safety electrical soldering (metallic structure) 9 alignment check of some chamber supports (with ruler) next day (glue hardening) less than one working day for each panel: one half-station a week 2 3 4

installation plan for the supporting structure Start cryo side (US) middle January (12/1/6) 2 weeks for the first half-station M5 (16/1-29/1) 1 week for the first M4 half-station (30/1-5/2) 1 week for the first M3 half-station (6/2-12/2) 1 week for the first M2 half-station (13/2-19/2) Switch to pit (PZ) side on March 4 weeks for M5-M2 (20/2-19/3) M1 immediately after