R+D for future accelerators at Santiago Pablo Vázquez IGFAE-USC Instituto Galego de Gísica de Altas Enerxías Universidade de Santiago de Compostela.

Slides:



Advertisements
Similar presentations
26 June 2001VELO-Overview VELO Overview T. Bowcock University of Liverpool.
Advertisements

Actividades de I+D enIGFAE/USC Pablo Vázquez (IGFAE-USC) IV JORNADAS SOBRE LA PARTICIPACIÓN ESPAÑOLA EN FUTUROS ACELERADORES LINEALES Madrid, 2-3 Diciembre.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Actividades de I+D en IGFAE/USC Pablo Vázquez (IGFAE-USC) IV JORNADAS SOBRE LA PARTICIPACIÓN ESPAÑOLA EN FUTUROS ACELERADORES LINEALES Madrid, 2-3 Diciembre.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
LHCb VELO Upgrade Medipix/Timepix PR01 Testbeam
Abraham Gallas (USC-IGFAE) Strips and Pixels for the VELO upgrade.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1 Pixel Telescope at CERN SPS Present at CERN: Tobias Haas Marcin Jastrzab Uli Koetz Livio Piemontese Philipp.
8/22/01Marina Artuso - Pixel Sensor Meeting - Aug Sensor R&D at Syracuse University Marina Artuso Chaouki Boulahouache Brian Gantz Paul Gelling.
Monolithic Pixels R&D at LBNL Devis Contarato Lawrence Berkeley National Laboratory International Linear Collider Workshop, LCWS 2007 DESY Hamburg, May.
Semi-conductor Detectors HEP and Accelerators Geoffrey Taylor ARC Centre for Particle Physics at the Terascale (CoEPP) The University of Melbourne.
ALBA Synchrotron – 17 June 2010 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona First Measurements on 3D Strips Detectors.
Wire Bonding and Analogue Readout ● Cold bump bonding is not easy ● Pixel chip is not reusable ● FE-I3 is not available at the moment ● FE-I4 is coming.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
SuperKEKB 3nd open meeting, July Hans-Günther Moser MPI für Physik PXD Summary Other talks in software, SVD and DAQ sessions.
ILC VXD Review, Fermilab, October 2007 Ariane Frey, MPI für Physik DEPFET Vertex Detector Simulation and Physics Performance Ariane Frey for the DEPFET.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
Diamond detectors for the LHCb upgrade M. Artuso, A. Borgia, J. Garofoli, R.Mountain, P.Urquijo, J. Wang, Z. Xing 5/5/20101Marina Artuso Velo Upgrade Meeting.
Analysis of Edge and Surface TCTs for Irradiated 3D Silicon Strip Detectors Graeme Stewart a, R. Bates a, C. Corral b, M. Fantoba b, G. Kramberger c, G.
Hybrid Pixel R&D After BTeV As of two years ago: –FNAL-designed readout chip had two minor fatal flaws. –No system demonstration had yet been done. An.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
NEWATLASPIX: Development of new pixel detectors for the ATLAS experiment upgrade Giulio Pellegrini.
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
1/14 Characterization of P-type Silicon Detectors Irradiated with Neutrons M.Miñano 1, J.P.Balbuena 2, C. García 1, S.González 1, C.Lacasta 1, V.Lacuesta.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
IEEE October 16-22, 2004 First Look at the Beam Test Results of the FPIX2 Readout Chip for the BTeV Silicon Pixel Detector First Look at the Beam Test.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
December 7, 2005DESY EUDET in FCAL VINCA, Belgrade Univ. of Colorado, Boulder, BNL, Brookhaven, AGH Univ., INP & Jagiell. Univ. Cracow, JINR, Dubna, NCPHEP,
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
ALIBAVA system upgrade Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia) 1 ALIBAVA system upgrade 16th RD50 Workshop, 31 May-2 June 2010, Barcelona.
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Myself Training Technical Dissemination Impact.
Giulio Pellegrini 27th RD50 Workshop (CERN) 2-4 December 2015 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona 1 Status of.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Haga clic para modificar el estilo de texto del patrón Overall view of Radiation Detectors Group activities Manuel Lozano.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
Giulio Pellegrini Actividades 3D G. Pellegrini, C. Fleta, D. Quirion, JP Balbuena, D. Bassignana.
H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Readout cycle: 10 µs or 20 µs ? Advantages of 20 µs: - smaller.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Page 1 Liverpool January 11th, 2012 LHCb Upgrade Meeting Planar Silicon Detectors I. Tsurin Generic sensor R&D ATLAS-oriented commitments LHCb-oriented.
Giulio Pellegrini 12th RD50 - Workshop on Radiation hard semiconductor devices for very high luminosity colliders, Ljubljana, Slovenia, 2-4 June 2008 Report.
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Karlsruhe probe equipment and QA proposals/expertise
Santiago in DEPFET for SUPERBELLE
TT Upgrade Power Review
 Silicon Vertex Detector Upgrade for the Belle II Experiment
POWER SUPPLY FOR BELLE II PIXEL DETECTOR
Graeme Stewarta, R. Batesa, G. Pellegrinib, G. Krambergerc, M
HR-HV CMOS activities and plans at Glasgow
Silicon Lab Bonn Physikalisches Institut Universität Bonn
BOND/QART Lab and Pixel R&D
EENP2 Silicon Detectors.
The SuperB Silicon Vertex Tracker
TIMEPIX TESTBEAM TELESCOPE FOR AIDA
Report from CNM activities
Peter Kodyš, Zdeněk Doležal, Jan Brož,
Setup for testing LHCb Inner Tracker Modules
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

R+D for future accelerators at Santiago Pablo Vázquez IGFAE-USC Instituto Galego de Gísica de Altas Enerxías Universidade de Santiago de Compostela

P. Vázquez Activities at Santiago 1 Clean room Irradiation facility DEPFET LHCb VELO upgrade New silicon sensors ASIC development Barcelona, 7-8 May 2009

P. Vázquez New Clean Room already available Barcelona, 7-8 May

P. Vázquez Clean room infraestructure 30 m2 upgradable, class , ISO 8 Wedge bonding machinery (bonding machine, pull tester, …) Manual probe station (Karlsus…) Electronics laboratory (Agilent L4450A pattern generator, Scope Tektronics MSO 4104, LV PS, LCR,,…) Laser (1060 nm cwl, 1mW) XYZ table (Newport Driver ESP 300,3 Precision translation stages UTS Series, resolution 0.1 μm) ALIBAVA system for silicon strip sensor readout based on Beetle chips Barcelona, 7-8 May

P. Vázquez Short strips IV/IC characterization Barcelona, 7-8 May

P. Vázquez ALIBAVA system Barcelona, 7-8 May

P. Vázquez New irradiation facility 60 Co with 2034 Ci, 75.3 Tera Bq Available at Santiago by June 09 Large surfaces covered Allow to run several users at the same time To be used in VELO upgrade DEPFET Barcelona, 7-8 May

P. Vázquez DEPFET Power Supply for vertex detector of Belle II System design Regulator boards Gamma irradiation studies on DEPFET PXD6 matrices up to 10Mrad (autumn 09) Later the whole module: matrix + CURO + SWITCHER Laser studies Interpixel charge characterization Testbeams August 09 Test of matrices 128x128 pixels on S3B hybrid Barcelona, 7-8 May

P. Vázquez S3A hybrid DEPFET under laser test Barcelona, 7-8 May

P. Vázquez LHCb VELO upgrade Test beam July 2009 Test the 55x55 μ m 2 Timepix pixel geometry and asses its suitability for a future VELO detector Integration of Timepix into CMS Beam Telescope Test Beam August 2009 Test some issues of the strip option: geometry + fast electronics Integration Beetle into EUDET Telescope and wire bonding Possible construction of a dedicated LHCb Test beam telescope Irradiation programme Irradiation Timepix/Medipix until breaking point (summer 09) Later FPIX beyond 87 MRad Barcelona, 7-8 May

P. Vázquez New silicon sensors nThinned 3D silicon sensor are going to be produced at CNM n Project launched in February 09 n Simulation with Synopsys TCAD and Sentaurus n3D short strips produced at CNM n Characterization CV/IV Barcelona, 7-8 May

P. Vázquez ASIC development nA group from USC (Grupo de Visión Artificial) interested in developing ASICs for High Energy Physics domain n Experience in images real time processing n Interest in 3D vertical interconection 11 Barcelona, 7-8 May 2009

P. Vázquez Thank you Barcelona, 7-8 May