AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.

Slides:



Advertisements
Similar presentations
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Advertisements

L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013.
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
NSS Requirements Review: Labs and Workshops Michelle Everett Lab Coordinator Scientific Activities Division November 12,
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
ON IT 1 Con Edison Energy Efficiency Programs Sustaining our Future Rebecca Craft Director of Energy Efficiency.
Construction and Installation of the CLIC Experimental Area
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
CENF secondary beam study group 1 st meeting - 7 th May 2013 M. Calviani (EN/STI)
Francois BUTIN CERN EN/MEF.  Future of AD is clearer and deserves investment  New AEGIS experiment being prepared, requires new control room  Existing.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini TE-EPC TEEPC.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Update on the Laser Beam Line
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
R2E Point 5 mini safe room cooling / ventilation A. L. Perrot, 30 th April 2013.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
Integration of CLIC TBM in CLEX Electronics allocation and cables tracing Wilfrid Farabolini (CEA/IRFU) 16 October 2013.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Kitakami Side AHCAL Assembly or anywhere in any detector.
ELENA Integration F. Butin / ELENA collaboration.
Update on the PSB Cooling and Ventilation Systems
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
ELENA installation and commissioning status
Experimental hall design in Japanese site
EXTENSION ELENA = BUILDING 193 Status of integration
Budget specification EHN1 Extension: Infrastructure (WG2)
CERN Neutrino Project 26th November, 2013 M.Nessi.
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
ELENA Technical Coordination
A very first look at siting issues
Maintenance at ALBA facility: Strategy for the conventional services
Experimental Areas – LS2 planning
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

AD/ELENA (B193) Hall Extension F. Butin

Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept 2010 Designed building v1 with CE in Dec 11 Specific presentation to GTPE on 12/01/2012 Shown in Site Committe by P. Collier on 23/02/12 Recommended to proceed with MS/CfT in SPSC on 23/02/12 Specification document with all services integration is ready on EDMS ( ) Decision from directorate still expected F. Butin

Reasons for an extension of AD hall F. Butin Four main goals for an extension of AD hall: 1. Accommodate for ELENA ring and experimental areas 2. Relocate the existing workshop 3. Provide short term storage space for experiments 4. Host the magnetic horns test bench

New building details Surface needed:  Storage: 180 m2  Kickers: 200 m2  Workshop: 50 m2  Horn test bench: 70 m2  CV installation: 10 m2  Circulation: 60 m2  Total: 570 m2 F. Butin / S. Maury IEFC 24th of February 2012

Extension building proposal F. Butin / S. Maury IEFC 24th of February m2 AD hall extension Sketch: A. Kosmicki

TT2 TTL2 TT7 Booster 193 Extension 181 Sketch: A. Kosmicki F. Butin

Accès 193 Extension Blocs à évacuer Butte à excaver Sketch: A. Kosmicki

New building details F. Butin Complete CE project by A. Kosmicki and L. Lopez on EDMS# Sketch: A. Kosmicki

F. Butin Magnetic horns test bench (10 x 7 m2) Workshop (5 x 10 m2) Offloading area (8x2.3 m2) Storage (5 x 9 m2) Storage (7x4 m2) Storage (14x2 m2) Storage (7x2 m2) Kickers 12.7 x 14.7 m2 Test bench 7 x 10 m2

Magnetic horns test bench F. Butin

Workshop layout F. Butin Workshop (5 x 10 m2 ) Drill Machine tool Sink

EL integration F. Butin Cable trays Main cabinet

EL integration Distribution cabinet on NE wall Kickers: 380 V – 200A Crane (10t, 6m below hook): 380 V – 15 kW HVAC: 380 V – 80 A plus 380 V – 25 A Power sockets blocks (3 x 16 A + 1 x 32 A) every 7 m, plus additional in workshop 3x 63 A sockets, 1 for test bench Lighting on the ceiling F. Butin

EL integration F. Butin Cables trays have to go

CV integration HVAC system for 20 kW internal heat load Demineralized water for detector cooling tests (100 l/s) Tap water, sink Compressed air (6 outlets) Smoke extraction F. Butin

CV integration, HVAC system F. Butin Y. Body, EN/CV

Misc IT network: Wifi + internet sockets Access control: on all doors, same access rights as AD hall Radiation classification: Supervised area Radiation monitoring: Interlock with TT2 operation. 80 cm thick slab above void surrounding AD F. Butin

Conclusion  A new multipurpose building is urgently needed for : - AD/ELENA kickers generators - Short term storage for delicate physics detectors, for existing and future experiments - Workshop for the experiments - Magnetic horn test bench  It is absolutely mandatory if Gbar exp is approved  This will give vital space for ELENA machine, approved experiment (Gbar) and new antiproton experiments in the future.  We are in the starting blocks ! F. Butin / S. Maury IEFC 24th of February 2012