PROJECT MANAGEMENT Outline What is project mean? Examples of projects…

Slides:



Advertisements
Similar presentations
WBS: Lowest level OBS: Lowest level
Advertisements

Finding the Critical Path
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 Chapter 3 part 1 Project Management. 2 Why is Project Management Important?  Why do I need to know this stuff? –Relevant across functional areas 
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Project Management Operations.
Prepared by Lee Revere and John Large
1 Operations Management Lesson 5 Project Management.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
Chapter 10 Project Scheduling: PERT/CPM
Projects: Critical Paths Dr. Ron Lembke Operations Management.
Project Management Techniques.
J0444 OPERATION MANAGEMENT Project Management Pert 5 Universitas Bina Nusantara.
Roberta Russell & Bernard W. Taylor, III
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 13-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 13.
Irwin/McGraw-Hill Project Management  Project series of related jobs usually directed toward some major output and requiring a significant period of time.
Project Management Chapter 3 BUSI 2106 – Operations Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Operations Management Project Management
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Projects CHAPTER 10. Learning Objectives 1. Explain what project management is and why it is important. 2. Identify the different ways projects can be.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Project Management Project 01 – OFF CLASS. 3 Project Management Project – series of related jobs usually directed toward some major output and requiring.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Operations Management For Competitive Advantage 1 Project Management Operations Management For Competitive Advantage Chapter 3.
Lean Project Management
Intro : Project Management. 1.Project : series of related jobs usually directed toward some major output and requiring a significant period of time to.
1 Chapter 3 Project Management  Definition of Project Management  Work Breakdown Structure  Project Control Charts  Structuring Projects  Critical.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
Project Management (專案管理)
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
Chapter 10. Activity-on-Node Network Fundamentals X Y Z Y and Z are preceded by X Y and Z can begin at the same time, if you wish (B) ABC A is preceded.
To accompany Quantitative Analysis for Management, 7e by Render/Stair 13-1 © 2000 by Prentice Hall, Inc., Upper Saddle River, N.J Quantitative Analysis.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
MBA 8452 Systems and Operations Management
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
© The McGraw-Hill Companies, Inc., Project Management CPM and PERT.
Tata McGraw CHAPTER 3 Project Management. Chapter 3 Project Management.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Operations Management Project Management Chapter 3.
Chapter 16 – Project Management
Project Management.
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management (專案管理)
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
Project Management Chapter 13
Projects: Critical Paths
Critical Path Method (CPM). Background & History Developed in the 1950s by the US Navy & Du Pont. Originally, the critical path method considered only.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Welcome to MM 305 Unit 8 Seminar!
Prepared by Lee Revere and John Large
Chapter 16 – Project Management
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
Presentation transcript:

PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM

What is Project? Project What is the different between normal business activities and Project? Project Unique, one time operations design to accomplish a specific set of objectives in a limited time frame.

Examples of project… Building a house Building a factory Add assembly line in the factory Merging to companies Managing political campaign Designing a new product Soft ware development

Project Management Project Project Management Lengthy network of activities needed to complete a major output. Project Management Planning, execution, and controlling resources to needed to complete the project. 3

Project Life Cycle Definition Planning Execution Termination Why we need to start new project Feasibility Analysis (Cost, Benefit , risk of under taking a project) Planning Details of the work, estimates time, Human resource and cost Execution During which a project itself is done Termination During which closer is achieved

Project Planning, Controlling and Scheduling 1. Setting goals. 2. Defining the project. 3. Tying needs into timed project activities. 4. Organizing the team. Before Project

Project Planning, Controlling and Scheduling Project Scheduling: 1. Tying resources to specific activities. 2. Relating activities to each other. 3. Updating and revising on regular basis.

Project Planning, Controlling and Scheduling Project Controlling: 1. Monitoring resources, costs, quality and budgets. 2. Revising and changing plans. 3. Shifting resources to meet demands. During Project

Work Breakdown Structure Program Project 1 Project 2 Task 1.1 Subtask 1.1.1 Work Package 1.1.1.1 Level 1 2 3 4 Task 1.2 Subtask 1.1.2 Work Package 1.1.1.2 4

Project Control: Gantt Chart The Gantt chart is a popular tool for planning and scheduling simple project. It enables a manager to initially schedule project activities and then to monitor progress over time by comparing planned progress to actual progress

Project Control: Gantt Chart Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Activity 6 Time a b a c b d c d d 6

PERT and CPM PERT (program evaluation and review technique) U.S. Navy Special Projects Office (1958) Polaris missile project CPM (critical path method) J. E. Kelly of Remington-Rand and M. R. Walker of Du Pont (1957) Scheduling maintenance shutdowns of chemical processing plants 15

Questions answered by PERT/CPM When will the entire project be completed? What are the critical activities or tasks in the project, that is, the ones that will delay the entire project if they are late? Which are the non-critical activities, that is, the ones that can run late without delaying the entire project’s completion? What is the probability that the project will be completed by a specific date?

Questions answered by PERT/CPM At any particular date, is the project on schedule, behind schedule, or ahead of schedule? On any given date, is the money spent equal to, less than, or greater than the budgeted amount? Are there enough resources available to finish the project on time? If the project is to be finished in a shorter amount of time, what is the best way to accomplish this at the least cost?

To Find Critical Path ??? To find the critical path, need to determine the following quantities for each activity in the network: 1. Earliest start time (ES): the earliest time an activity can begin without violation of immediate predecessor requirements. 2. Earliest finish time (EF): the earliest time at which an activity can end. 3. Latest start time (LS): the latest time an activity can begin without delaying the entire project. 4. Latest finish time (LF): the latest time an activity can end without delaying the entire project.

CPM with Single Time Estimate Consider the following consulting project: Activity Designation Immed. Pred. Time (Weeks) Assess customer's needs A None 2 Write and submit proposal B 1 Obtain approval C Develop service vision and goals D Train employees E 5 Quality improvement pilot groups F D, E Write assessment report G Develop a critical path diagram and determine the duration of the critical path and slack times for all activities 17

When I can start depends on when predecessors finish. B, 1 C, 1 G, 1 20

Don’t delay the project ES=4 EF=6 D, 2 E, 5 ES=0 EF=2 ES=2 EF=3 ES=3 EF=4 ES=9 EF=14 ES=14 EF=15 LS=7 LF=9 F, 5 A, 2 B, 1 C, 1 G, 1 ES=4 EF=9 LS=3 LF=4 LS=2 LF=3 LS=0 LF=2 LS=9 LF=14 LS=14 LF=15 LS=4 LF=9 22

Critical Path & Slack Duration = 15 weeks ES=4 EF=6 D, 2 ES=0 EF=2 Slack=(7-4)=(9-6)= 3 Wks D, 2 ES=0 EF=2 ES=2 EF=3 ES=3 EF=4 ES=9 EF=14 ES=14 EF=15 LS=7 LF=9 F, 5 A, 2 B, 1 C, 1 G, 1 ES=4 EF=9 LS=3 LF=4 LS=2 LF=3 LS=0 LF=2 LS=9 LF=14 LS=14 LF=15 E, 5 LS=4 LF=9 Duration = 15 weeks 23

CPM with Three Activity Time Estimates 24

Expected Times 25

PERT/ CPM CPM uses two sets of time and cost estimates for activities: A normal time and cost and A crash time and cost The normal cost is an estimate of cost to complete an activity in normal time. The crash time is the shortest possible activity time. Crash cost is the cost of completing the activity on a crash or deadline basis.

Project Crashing with PERT/CPM: Four Steps Find the normal critical path and identify the critical activities. Compute the crash cost per week (or other time period) for all activities in the network. This process uses the following formula: crash cost/time period = crash cost – normal cost normal time – crash time

Project Crashing with PERT/CPM: Four Steps 3. Select the activity on the critical path with the smallest crash cost per week. Crash this activity to the maximum extent possible or to the point at which your desired deadline has been reached 4. Check to be sure that the critical path you were crashing is still critical. Often, a reduction in activity time along the critical path causes a non-critical path or paths to become critical. If the critical path is still the longest path through the network, return to step 3. If not, find the new critical path and return to step 2.

Subproject For extremely large projects, an activity may be made of several smaller sub-activities. Each activity might be viewed as a smaller project or a subproject of the original project. The person in charge of the activity might wish to create a PERT/CPM chart for managing this subproject. Many software packages have the ability to include several levels of subprojects