Work Study Prof. Dr. Orhan TORKUL Arş. Gör. M. Raşit CESUR Arş. Gör. Furkan YENER.

Slides:



Advertisements
Similar presentations
Pre-Production Planning & Apparel Engineering
Advertisements

Logistics & Channel Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Operations Management and Quality
INTRODUCTION TO BUSINESS
CHAPTER 8TN Process Capability and Statistical Quality Control
Problem Solving Tools INSY 3021 Auburn University Spring 2008.
from Prof. Goldsman’s lecture notes
Maintenance Work Measurement
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
1 EI441 Work Analysis and Design Text book: Motion and Time Study by R.M. Barnes, 7 th ed. (1980). Topics: 1.Introduction, Productivity, Definition and.
Motion Study Vanni Legaspi IR212.
Industrial Facilities Design
APPLIED LOGISTICS The Productivity Improvement Program for Warehousing and Transportation.
Productivity One of the most important responsibilities of an operations manager is to achieve productive use of organization’s resources. Productivity.
How to Effectively Implement Set-up Reduction in Any Organization.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
1 Work Sampling Can provide information about men and machines in less time and lower cost. It has three main uses: 1.Activity and delay sampling To measure.
7 Design of Work Systems.
Industrial Engineering I
Capacity “The upper limit on the load that an operating unit can handle” Importance of Long-Term Capacity Impacts ability to meet future demands Affects.
4. Time Study The major objective of this chapter is to learn how to calculate a time standard based on stopwatch time study procedures.
Lecture 3 Scheduling CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
1.Pareto Analysis 2.Fish Diagram 3.Gantt Chart 4.PERT Diagram 5.Job/Worksite Analysis Guide.
Work Design and Measurement McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
PRESENTATION ON Time and Motion Study BY:- KANIKA SOOD 108K18 AASHI AGARWAL 108K22.
- For 6 th Semester Job Design, Production and Operations Standards, and Work Measurement.
C h a p t e r 20 GLOSSARYGLOSSARY EXIT Glossary Modern Management, 9 th edition Click on terms for definitions Break-even analysis Break-even point Budget.
WORK STUDY WORK STUDY IS A GENERIC TERM FOR THOSE TECHNIQUES, PARTICULARLY METHOD STUDY AND WORK MEASUREMENT,WHICH ARE USED IN THE EXAMINATION OF HUMAN.
Process Analysis I Operations -- Prof. Juran.
Company LOGO Work Measurements Lab # 5. Outline 1. Work Study 2. Method Study 3. Work Measurement 4. Time Study 3. Standard Time June 4, 20162Lab # 5:
Traditional Approaches to Facility Layout
Job Design Job design involves specifying the content and methods of job What will be done Who will do the job How the job will be done Where the job.
1 Procedure for the determination of time required to perform a task involving either human or machine under certain standard conditions of measurement.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Statistical Quality Control/Statistical Process Control
PRODUCTION LOGISTICS Introduction Slovak University of Technology Faculty of Material Science and Technology in Trnava.
IENG 301 FUNDAMENTALS OF WORK STUDY AND ERGONOMICS
Work Measurement Vital inputs for: Standard Time
ENG M 501 Production and Operations Management Chapter 6A Job Design and Work Measurement Lecture 04a: 27 January 2009 John Doucette Dept. of Mechanical.
WORK-STUDY Work-study is a generic term for those techniques, method study and work measurement which are used in the examination of human work in all.
EVOLUTION OF INDUSTRIAL ENGINEERING Prof. Dr. Orhan TORKUL Res. Asst. M. Raşit CESUR Res. Asst. Furkan YENER.
Company LOGO Work Measurements Lab # 5. Outline 1. Work Study 2. Method Study 3. Work Measurement 4. Time Study 3. Standard Time February 17, 20162Lab.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Work study. Work study literally implies study of human work. it concerns itself with better ways of doing things n control over the output of those things.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
 Problem Analysis  Coding  Debugging  Testing.
7 Design of Work Systems.
Introduction to Motion and Time Study
METHOD STUDY Method study is the systematic recording and critical examination of existing and proposed ways of doing work, as a means of developing and.
7 Design of Work Systems.
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Introduction to Methods Engineering
Cellular Layouts Cellular Production Group Technology
Process Design and Analysis
METHOD STUDY.
(Additional materials)
WORK STUDY.
Process Analysis.
CHAPTER 5 WORK STUDY (12 MARKS).
Unit# 9: Computer Program Development
FACILITY LAYOUT Facility layout means:
CHAPTER-1 PRODUCTIVITY.
(Lecturer in Mech. Deptt.)
(Lecturer in Mech. Deptt.)
Summer Training Industrial Engineering Department
Production and Operations Management
III B.Com. SEMESTER V By B. V. Manohar Babu
Presentation transcript:

Work Study Prof. Dr. Orhan TORKUL Arş. Gör. M. Raşit CESUR Arş. Gör. Furkan YENER

Work Design and Organizational Success Elementally, the ability of an organization to convert form input to output. Productivity = Effectivity Efficiency Quality Innovation Productivity Quality of business life Profitability (Organizational success) Output Input

Method Study Method study is a systematic approach to find out easier and better ways in order to be success in a task. 5 steps for systematic approach in Method study; 1. Select the work: Highest cost or lovest productivity works are prefered in generally. 2. Obtain and save the facts: Datas should save such as actual method and frequency of work 3. Examine the details: Actual method should examined, Some elemants could be removed or modified.

Method Study 5 steps for systematic approach in Method study; 4. Improve better method and make tests: New method should be improved based on changes and make tests. 5. Establish and sustain of the improvement: Improved method should be enhanced and implemented.

Flow Process Diagrams/Charts Flow work diagram contains all activities(operations, storages, inspection, carrying and delays) in a process. Process Start Specialist Actual_____Proposed______ Man____ or Material _______ Stop Date Steps SymbolsExplanations Flow Process Charts

Two Handed Process Charts Two Handed Process Chart could be used for analyze of work made by someone at the spesific work center.

Two Handed Process Charts

Operation________ Name _________ Date ___________ Actual _______________ Proposed ____________ Work place layout and product drawing (if it is necessary) Left hand Activities SymbolsRight Hand Activities Two Handed Process chart

Two Handed Process Charts Operation: (one) hand makes some efficient operation, Transport: (one) hand moves from one place to another, Delay: Hand does nothing, waits, Hold: Hand keeps an object.

Other Schemas Flow process chart : A flow diagram is basically a process flow diagram of the facility was drawn with the goal of the configuration. Multiple activity Schema: Multi - activity Schema shows at least two or more objects, man and machine activities simultaneously. Work Distrubition Schema: the list of everybody’s activities and responsibilities in a departmant or group. Operation Process Chart: Inessential work, inspection or storage are eliminated and to obtain proper sequences of the these. Gantt Schema: Gantt Schema is a horizontal timeline diagram which is used in scheduling and it shows relative timeline of various activities.

Principles of Movement’s Economy Thoughts and notions are proved of benefits when effective work procedure is planning. The following principles of movement’s economy list is taken from Mundel. 1. Remove 2. Combining 3. Redesign 4. Simplification

Human Engineering Workers and machines can work together as a system to ensure more effective and efficient human-machine interface design. Today, thanks to human engineering, machinery may lowered or set up higher position or completely re-designed and thus the worker and the machine can be provided as a single system work better. A good example of Human engineering is aircraft cockpit design.

Work Measurement Under normal operating conditions and at a normal pace, and trained an average person working 8 hours per day, a measure of the time required for the fulfillment of the task. 1. Normal Time 2. Normal tempo 3. Actual Time 4. Tolerances

Standart Time Calculation 1. Directly Time study 2. Time study’s standart datas 3. Pre-determined Time systems 4. Pre-determined Time systems standart datas 5. Work sampling

Direct Time Study The actual time required to do a job, taking into account the tolerance measure of the time directly.

Time Study Form

Performance Evaluation Calculations OPERATIONAVERAGE Total Actual Time= =35 Success Evaluation=%115 Normal Time=(35)(1,15)=40,25 Tolerances=%12 Standart Time=(40,25)(1,12)=45,08 Normal Time = Actual Time X Success Evaluation If operator performance is %90 or less than %10 from normal expectations, Normal time colculates as following solution. Normal Time = (35)(0,90) = 28,50 To suppose doing a study and personal needs constitute work days %4 and tiredness effects the performance %5 and unavoidable delays accure %3 at time. Tolerances = %4 + %5 + %3 = %12 We needs to add Tolerances to the Normal time in order to calculate the Standard time we may find Standart time as follows. Standart Time:(40,25)(1,12) = 45,08

Time Study’s Standart Datas Time study’s standart data’s using the worths which are obtained from normal time schedule previously. Y X6 cm8 cm10 cm12 cm 6 cm0,0250,026 0,027 8 cm0,026 0, cm0,0270,028 0, cm0,0270,0280,0290,030

Pre-determined Time Table Leave any parts of the job detail, various factors (weight, distance and etc.) previously created by taking into consideration, when utilized as reference values ​​table is called a pre-determined time table. Giving an object from one hand to another; weight > 2 lb. X 0,454 kg. DistanceTime 4 inch x 2,54 cm0,00412 min 8 inch0,00591 min

Work Sampling Rate for the time spent on a specific type of activity, instantaneous measurements made ​​using the calculation of random variables is called work sampling. Percentage of Occurrence A Facility Number of observations Accumulated percentage

Productivity Measurement

Normal Productivity Measurement Model 1. Quiet contemplation 2. Cyclically to express thoughts 3. Intra-group netting 4. Voting

Multi-Factor Productivity Measurement Model Basically, MFPMM have two ways that may affect the profitability of an organization. 1. Re-pricing 2. Productivity Variation

THANKS