1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.

Slides:



Advertisements
Similar presentations
For the Collaboration GWDAW 2005 Status of inspiral search in C6 and C7 Virgo data Frédérique MARION.
Advertisements

Progress on ERT  0 efficiency study Spin PWG June 6,2002 LVL-1 meeting June 14,2002 Analysis meeting June 14,2002 Kensuke Okada.
1 The ATLAS Missing E T trigger Pierre-Hugues Beauchemin University of Oxford On behalf of the ATLAS Collaboration Pierre-Hugues Beauchemin University.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
Far Detector Data Quality Andy Blake Cambridge University.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Performance of SPIROC chips in SKIROC mode
06/15/2009CALICE TB review RPC DHCAL 1m 3 test software: daq, event building, event display, analysis and simulation Lei Xia.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Analysis of PSI beam test R.Sawada 09/Feb/2004 MEG collaboration R.Sawada 09/Feb/2004 MEG collaboration
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
FVTX Trigger Toru Nagashima, Yomei Fukushima (Rikkyo University) Shoichi Hasegwa (J-Parc) Itaru Nakagawa RIKEN and FVTX Group 1.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
PHOS offline status report Dmitri Peressounko ALICE offline week,
Correcting the energy sharing problem Jan Stark, LPSC Grenoble CAT Force meeting, May 27 th, 2003 Many thanks to Dean Schamberger, Robert Zitoun and Gregorio.
Glenn R. Young, ORNL 12/13/2015 BNL Core Week Computing Meeting 1 Online & Calibration/Monitoring November 11, 1998 Calibration and Monitoring - Online.
7/28/2003DC/EC Review Aerogel Read out Electronics K. Ozawa, N. Kurihara, M. Inaba, H. Masui T. Sakaguchi, T. Matsumoto.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
CALOR April Algorithms for the DØ Calorimeter Sophie Trincaz-Duvoid LPNHE – PARIS VI for the DØ collaboration  Calorimeter short description.
Anatoli Romaniouk TRT Test manual Some important information p. 2-3Some important information p. 2-3 Noise studies p.4-7Noise studies p.4-7 Operation with.
STAR J/  Trigger in dA Manuel Calderon for the Heavy-Flavor Group Trigger Workshop at BNL October 21, 2002.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
2000/9/23 JPS meeting in Niigata1 Measurement of single gamma and  0 with PHENIX EMCal (I) H.Torii Kyoto Univ./RIKEN for the PHENIX Collaboration. Sep/23/2000,
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
CM correction algorithm. Observations: Looking at the data for one analog link, a large fraction of the 32 strips are affected by the large signal deposit.
CALORIMETER CELL MONITORING TOOL Viacheslav Shary.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
M.D. Nov 27th 2002M0' workshop1 M0’ linearity study  Contents : Electronic injection Laser injection Beam injection Conclusion.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
Electron Trigger in PHENIX Kenta Shigaki (KEK) at PHENIX Heavy Flavor and Light Vector Meson Physics Working Group Meeting on March 9, 2000.
Calorimeter Status Electronics Installation and Commissioning
PreShower Characterisations
Mini-Tower test results
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Tracking System at CERN 06 and 07 test beams
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
Noise analysis of the 1m3 DHCal test beam
Maki KUROSAWA VTX Group 2014 Feb 20
BESIII EMC electronics
Kazuya Aoki For the PHENIX Collaborations. Kyoto Univ. / RIKEN
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
J. Rutherfoord & P. Schacht 17 May 2004
Presentation transcript:

1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting

2 Index EMCal Trigger Circuit1page What did we learn from RunII –EMCal trigger board prototype test(2001/Jun)2pages –Final check before installation(2001/Dec)1page –During run using installed system(2002/Jan) Switch on/off1page Threshold scan2page Mask scan1page Summary of during run1page –Cosmic ray run(2002/Jan)1page –Offline analysis(until now)3page Discussion of the plan for RunIII –Improve the threshold turn-on width.1page –Remove the noisy channels.1page

3 EMC Trigger Circuit Variable Gain Amp Switch on/off Threshold DAC Multiplicity ERT trigger mask Back plane 1 ASIC board = 6 MONDO chips 1 SM crate = 6 ASIC boards

4 Test with 30 EMCal FEM boards + 2 EMCal trigger prototype boards –Those 30 boards had been rejected from installation, so the situation what I got through this test might be worse than what we have in PHENIX (0) Healthy offline readout. –Made 6 FEMs work correctly through ADC/TDC readout by tuning the several parameters. This needed some iterations, so it took an hour, kind of painful…. –2 channels were always fired, the trigger output looked always on through the oscilloscope  8 multiplicity in 4x4 trigger (1) Noisy channel search –Set the multiplicity threshold of 9 and put the test signal into 36 inputs. If it’s the noisy one, no trigger output would be seen. –(Fix) replace the boards (3) Trigger algorithm check (4x4 algorithm) –Put a test signal into 18 inputs (half of a SM) and find the minimum multiplicity threshold. 1 channel in the middle of SM had 2 or 3 multiplicity th. –(Fix) replace the boards (4) SM-to-SM connection check –Connected one cable between two SMs and put the test signal in the edge. –Could see a trigger output from next SM. Trigger Board Prototype Test(2001/Jun)

5 Summary of Prototype Test(2001/Jun) Some always-fired channels existed –Fixed by replacing the FEM boards. One channel showed wrong 4x4 algorithm –Fixed by replacing the FEM boards. Get a proof of the connection between two SMs –The 4x4 algorithm in the SM connection might be wrong. –The multiplicity threshold of 4 may results in strange behavior. Let’s set the multiplicity threshold 1.

6 Final Check before Installing EMCal Trigger Board(2001/Dec) Before installing all 172 trigger boards, we did a simple check of all the EMCal trigger boards –Put a test signal into one channels and check the output is there. –All the EMCal trigger boards passed the check. Observed some threshold behavior using installed EMCal trigger board

7 During pp RunII : Switch off the Noisy Channels There were several noisy channels/SMs Make switch off for all channels –Took data in the force accept trigger. –The noisy channels looked to be remained still. –Didn’t work to reduce the noisy SMs  The noise occurred after “switch on/off”. probably in the analog sum or the threshold circuit.

8 During pp RunII : Threshold Scan In January, before pp-run –To find a minimum threshold more than zero level. The multiplicity threshold is 1 for all –1000 events (10sec) with force accept mode. If at least one events had a trigger in a particular SM, we defined the SM as a  ‘fired’  one. The rigger is from 36 tiles(1 SM), Count number of  ‘fired’  SMs out of 172 SMs as a function of threshold The  ‘fired’  is caused by –Noise –One tile with lowest threshold in the 36 tiles can be across the zero-level and

9 During pp RunII : Threshold Scan Final threshold value –2x2: 21 (0.15GeV) –4x4A: 30 (2.1GeV) –4x4B: 31 (2.6GeV) The  ‘fired’  SMs at above threshold were masked off –2x2: 14 SMs –4x4A: 37 SMs –4x4B: 48 SMs The  ‘fired’  SMs were remained in the higher threshold setting West 100 SMs 2x24x4A4x4B

10 During pp RunII : Mask Scan –In addition to the masked SMs at the threshold scan Using the online monitoring software, some additional masks were obtained in the beam condition. (Run & Run 38789) –2x2:13SMs –4x4A:3SMs –4x4B:2SMs The algorithm is to find hot and cold channels compared to the mean hit frequency.

11 During pp RunII : Summary Mask –1-version of mask after Run38823 (Jan/5) 2x2: 27 SMs 4x4A: 40 SMs 4x4B: 50 SMs(total 172SMs) –During run The shifter did the online monitoring software to find the noisy SMs, and increased the number of mask. The history of the mask have been recorded into Objectivity data base and was used in the offline analysis. Threshold –Run (Jan/6) Threshold 21(0.15GeV)  24(0.3GeV) for 2x2 trigger –Run39785 – (Jan/15) Threshold 24(0.3GeV)  34(0.8GeV) for 2x2 trigger

12 Cosmic Ray Run (2002/Jan) Just after pp-run The mean deposited energy in a tile is ~70MeV –Need to decrease the threshold Increased the multiplicity threshold into 5 After repeating the threshold and mask scan, the threshold for 2x2 was set to –19 (~0.05MeV)  The multiplicity threshold worked to reduce the noisy channels

13 Offline Analysis : Gain Variation log scale PbGl very off gain PbGl has better shape than PbSc. Both of them have some very off gain PMTs. 18% 11% PbSc

14 Offline Analysis : Turn-on Width The width of turn-on curve was obtained from one threshold setting. (34 for 2x2) The threshold scan gave the idea about how much variation the DAC have.  For 4x4A/B, the DAC variation is dominant terms [GeV/tile] Tile trigger efficiency

15  2x2 (~0.8GeV threshold)  PbSc: 0.15GeV width=  PbGl: 0.10GeV width=  4x4A (~2.1GeV threshold)  PbSc 0.6GeV width=  PbGl 0.6GeV width=  4x4B (~2.6GeV threshold)  PbSc 0.6GeV width=  PbGl 0.6GeV width= Offline Analysis : Turn-on Width PMT/VGA gain variation DAC variation? * The value is based on 18%(PbSc) and 11%(PbGl) gaussian width

16 Future Plan : Turn-on Width PMT/VGA gain variation –18% for PbSc, 11% for PbGl –Well known for all towers Some towers with higher gain affected the turn-on curve. –Can be reduced by adjusting VGA gain for PbSc and HV setting for PbGl DAC variation? –Need one more proof –Kensuke will look at tower-by-tower threshold turn-on curve before APS meeting.

17 Future Plan : Noise Some ideas –Replace the FEM boards Of course, it’s best way. But, it’s hard to find the noisy channels. –The switch on/off in the test bench –Set DAC setting into maximum so that the noise won’t fire the threshold –Increase the multiplicity threshold If the noisy channels are always-fired, then this idea will be fine. If not, ….

18 Summary From RunII –Always-fired channels existed probably in ASIC boards –Some channels may have wrong 4x4 algorithm. –To reduce noisy channels “Switch on/off” didn’t work “Multiplicity threshold” worked –Threshold behavior for 2x2/4x4A/B are known for each sectors, but not for each towers. Plan for RunIII –Noisy channels (20% of SMs) Some ideas. They will be painful. –Threshold VGA gain DAC setting

19 Backup slides

20 Documentation ERT lvl-1 trigger Home Page  Nice RunII summary page by Kensuke ERT trigger Run2 note (still draft…)

21 Threshold Scan

22 BAD ASIC behavior Noisy –More than 3 times of RMS, typically ~100 RMS –It can be caused by AMU/ADC cells Overflow or low level –The average is 4096(overflow) or <~3000 –Any tune up doesn’t work. One channel dead We salvaged 7 crates (42/70 ASIC) Correspond to~1000towers Noisy –HG 2 –LG 3 –TAC 2 Overflow or low level –HG 6 –LG 2 –TAC 4 One channel dead4 Etc Total BAD ASIC27

23 Algorithm explanation by Paul

24 Kensuke’s result