H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK 12.12.2008 1 Summary of PXD Session 1 Status of CAPSH. Hoedlmoser (Video)

Slides:



Advertisements
Similar presentations
Radiation damage in silicon sensors
Advertisements

H.-G. Moser Max-Planck-Institut fuer Physik 2 nd open meeting July 4, 2008 Report on PXD Session.
2nd Open Meeting of the SuperKEKB Collaboration, KEK, March 2009 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Sensor R&D and Prototyping - Status -
Actividades de I+D en IGFAE/USC Pablo Vázquez (IGFAE-USC) IV JORNADAS SOBRE LA PARTICIPACIÓN ESPAÑOLA EN FUTUROS ACELERADORES LINEALES Madrid, 2-3 Diciembre.
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
Development of an Active Pixel Sensor Vertex Detector H. Matis, F. Bieser, G. Rai, F. Retiere, S. Wurzel, H. Wieman, E. Yamamato, LBNL S. Kleinfelder,
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
CLIC Collaboration Working Meeting: Work packages November 3, 2011 R&D on Detectors for CLIC Beam Monitoring at LBNL and UCSC/SCIPP Marco Battaglia.
A new idea of the vertex detector for ILC Y. Sugimoto Nov
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Monolithic Pixels R&D at LBNL Devis Contarato Lawrence Berkeley National Laboratory International Linear Collider Workshop, LCWS 2007 DESY Hamburg, May.
ECFA ILC Workshop, November 2005, ViennaLadislav Andricek, MPI für Physik, HLL DEPFET Project Status - in Summary Technology development thinning technology.
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
SuperKEKB 3nd open meeting, July Hans-Günther Moser MPI für Physik PXD Summary Other talks in software, SVD and DAQ sessions.
ILC VXD Review, Fermilab, October 2007 Ariane Frey, MPI für Physik DEPFET Vertex Detector Simulation and Physics Performance Ariane Frey for the DEPFET.
Progress in the Development of a B-Factory Monolithic Active Pixel Detector Samo Stanič for the Belle Pixel Group M. Barbero 1, A. Bozek 4, T. Browder.
SuperKEKB 2nd open meeting March 17-19, 2009 Hans-Günther Moser MPI für Physik PXD Session SOI: more information: see TIPP09 -> submission in February,
Carlos Mariñas, IFIC, CSIC-UVEG DEPFET Technology for future colliders Carlos Mariñas IFIC-Valencia (Spain) 1 LCPS09, Ambleside.
Fully depleted MAPS: Pegasus and MIMOSA 33 Maciej Kachel, Wojciech Duliński PICSEL group, IPHC Strasbourg 1 For low energy X-ray applications.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
ILC VXD Review, Fermilab, October 23, 2007 Hans-Günther Moser, MPI für Physik DEPFET Devices Hans-Gunther Moser for the DEPFET Collaboration (
FPCCD Vertex detector 22 Dec Y. Sugimoto KEK.
Technology Overview or Challenges of Future High Energy Particle Detection Tomasz Hemperek
LCWS08, Chicago, November 2008 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Active Pixel Sensors - Status and Plans - Ladislav Andricek for the DEPFET.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
The development of the readout ASIC for the pair-monitor with SOI technology ~irradiation test~ Yutaro Sato Tohoku Univ. 29 th Mar  Introduction.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
M. Deveaux, CBM-Collaboration-Meeting, 25 – 28. Feb 2008, GSI-Darmstadt Considerations on the material budget of the CBM Micro Vertex Detector. Outline:
Rutherford Appleton Laboratory Particle Physics Department G. Villani CALICE MAPS Siena October th Topical Seminar on Innovative Particle and.
LHCb Vertex Detector and Beetle Chip
The Belle II DEPFET Pixel Detector
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
The ultralight DEPFET Pixel Detector of the Belle II Experiment Florian Lütticke On behalf of the DEPFET Collaboration th.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
Daniel EsperanteIFIC – 13 Jun 2012 Electrónica para nuevos detectores de Belle-II e ILC.
Particle Physics School Colloquium, May C. Koffmane, MPI für Physik, HLL, TU Berlin  DEPFETs at ILC and Belle II  Module Concept  results with.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Readout cycle: 10 µs or 20 µs ? Advantages of 20 µs: - smaller.
Highlights from the VTX session Marc Winter & Massimo Caccia R&D reports: – DEPFET (M. Trimpl) – CCD (S. Hillert) – UK-CMOS (J.Velthuis) – Continental-CMOS.
1 Characterization of Pilot Run Modules for the Belle II Pixel Detector Felix Müller Max-Planck-Institut für Physik IMPRS Young Scientist Workshop Ringberg.
H.-G. Moser Max-Planck-Institut für Physik Future Vertex Detectors in HEP Projects: LHC (upgrade 2018+) Belle 2 (upgrade 2018+) ILC/CLIC (2020+)
Low Mass, Radiation Hard Vertex Detectors R. Lipton, Fermilab Future experiments will require pixelated vertex detectors with radiation hardness superior.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
Power Supply for DEPFET in SuperBelle Pablo Vazquez IGFAE-USC Henryk Palka INP-KRA.
Pixel Sensors for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
TILC08, Sendai, March DEPFET Active Pixel Sensors for the ILC Marcel Vos for the DEPFET Collaboration (
H.-G. Moser Max-Planck-Institut for Physics, Munich Vertex07 Lake Placid, NY 9/25/2007 DEPFET Active Pixel Detectors H.-G. Moser on behalf of the DEPFET.
Clear Performance and Demonstration of a novel Clear Concept for DEPFET Active Pixel Sensors Stefan Rummel Max-Planck-Institut für Physik – Halbleiterlabor.
H.-G. Moser Max-Planck-Institut fuer Physik DEPFET Meeting Heidelberg Sept DEPFET Geometry for SuperBelle Sensor Geometry Pixel Pitch Constant/variable.
H.-G. Moser Halbleiterlabor der Max-Planck- Institute für Physik und extraterrestrische Physik VIPS LP09, Hamburg August 18, R&D on monolithic and.
1 First large DEPFET pixel modules for the Belle II Pixel Detector Felix Müller Max-Planck-Institut für Physik DPG-Frühjahrstagung der Teilchenphysik,
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Thinning and Plans for SuperBelle
BaBar Silicon Tracker Perspective
CMOS pixel sensors & PLUME operation principles
The Belle II Vertex Pixel Detector (PXD)
Rita De Masi IPHC-Strasbourg on behalf of the IPHC-IRFU collaboration
Lars Reuen, 7th Conference on Position Sensitive Devices, Liverpool
FPCCD Vertex Detector for ILC
Yasuhiro Sugimoto KEK 17 R&D status of FPCCD VTX Yasuhiro Sugimoto KEK 17
Vertex Detector Overview Prototypes R&D Plans Summary.
Niels Tuning (Outer Tracker Group LHCb)
The LHCb VErtex LOcator
Presentation transcript:

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Summary of PXD Session 1 Status of CAPSH. Hoedlmoser (Video) 2 Status of SOIY. Arai 3 DEPFET ProjectC. Kiesling 4 Status of DEPFET R&DL. Andricek 5 DEPFET test beamP. Kodys

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Vertexing at SuperBelle Increased background  Radiation damage  Occupancy Shorter readout times (SVD with APV25) Higher granularity: pixel detector 79mm => 75  m: factor 1000 however: 10  s integration time: factor 100 improvement Improve performance? Beam pipe: 0.66% X 1.5 cm:  ip (MS) = 17  m for 1 GeV/c (normal incidence) No need for very small pixels! 50 x75  m 2 ok It’s the material! => thin silicon! Keep beam pipe radius small ! Keep beam pipe thin!

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK CAPS H. Hoedlmoser, Hawaii Chattering pixels Problems due to SOI process Latch instead of flip-flop No chatter Back 11/2008

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Binary readout CAP4 design Problem: ghost hits Also for x-y readout No ghosts for hexagonal readout

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK x6 mm 2 array 25  m square pixels 100 MHz transfer in periphery 12 transferelines 72 outputs Occupancy: 5.2 x times current background (frame readout: ~ ) Prototyp (CAP6) in production

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK SOI R&D Y. Arai

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK KEK SOIPIX History MPW run with KEK, LBNL, FNAL, Hawaii

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Results Counting pixels (x-ray imaging) sBelle pixels: 48x48 pixels (100 x 100  m 2 ) Works, but problems due to back-gate-effect Successful with x-rays LBNL beam tests: best S/N (15) at U=10V Gets worse at higher U (no full depletion)

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Plans Double the number of submissions at OKI Reduce back-gate-effect: Double SOI Implant through BOX 3D/SOI Project (with ZyCube) To be bonded in April 09 Second layer to shield substrate Reduce field under oxide 5-10  m pitch

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Frame readout => sequential readout of pixels or rows => rolling shutter mode => integration over many readout steps frame readout time: <10  s => only few pixels active: low power => ASICs at periphery selectPixel matrix readout DEPFET Status Each pixel is a p-channel FET on a completely depleted bulk A deep n-implant creates a potential minimum for electrons under the gate Signal electrons accumulate in the internal gate and modulate the transistor current (g q ~ 400 pA/e - ) Accumulated charge removed by a clear contact (“reset”) Fully depleted:  large signal, fast signal collection Low capacitance, internal amplification: => low noise

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Detector Layout 7.6 R=1.3cm 9.6 R=1.8cm Small Detector: 20 – 24 Modules (one sensor each) Radii still subject to optimisation: Beam pipe radius: 1 cm or 1.5 cm? Probably: 1.5 cm initially with upgrade to 1.0 cm later Total detector: 6 Mpixel (2 layer) Most likely scenario Layer 1 at 1.8 cm Layer 2 at 2.2 cm Later upgrade: Layer 0 at 1.3 cm 2 or 3 layers Depends on machine design

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Radius Pitch RLpitch 1.3cm7.6 cm 76  m 1.8cm9.6 cm 96  m 2.2cm11.5 cm115  m Frame readout time < 10  s Line readout time: 80 ns 2 x 4 lines per readout step -> 1000 lines along z Z=0 Impact parameter resolution in z scales with R 2 ! Extrapolation error ~ R Intrinsic resolution (pitch) ~ R z Improvement: variable pitch At large z: larger pitch possible optimal charge sharing small cluster size Central part: small pitch better resolution R Pitch (min) Pitch (max) 1.3cm 56  m175  m 1.8cm 87  m175  m 2.2cm110  m175  m

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK SuperBelle PXD Module Z=0 50 x (75-115)  m 2 (or variable in z) Read out four rows in parallel 256 x 1000 pixels 80 ns readout time 10  s a frame (100 kHz) All silicon module 50  m active area Thick frame X 0 ~ 0.15% (average, including chips)

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Test Beam 2006 – 2008: 7 beam tests at DESY (<6 GeV) and CERN (180 GeV) Latest setup: 6 DEPFET array acting as telescope & DUT 20 M events taken => analysis in progress Peter Kodys

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Radiation Hardness The good news: DEPFET works after 8MRad with low noise The bad news: Large (operation mode dependent) threshold voltage shift & dispersion Annealing helps

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Consequences I drain  A rough estimate:  U th -> 10%  q g (min-max, rms should be smaller) Clear performance more critical! Program: ASICs deliver large voltage range Operate (whenever possible) at 0V Thinner oxides, optimal nitride/oxide  R&D program for optimized gate dielectric parallel to prototype production (I drain /A) 1/2 gqgq

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Simulations Alexei Raspereza: Use LDC/LDC software Implement: Beam pipe DEPFET PXS SVD (no ghosts yet) CDC background PXD: 2 and 3 layer layout (R inner =1.2cm and 1.7cm)

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK DEPFET performance DEPFET simulation verified/tuned to test beam data Cluster size in z at low  can be reduce by variable pitch Z-resolution at large  can be improved by variable pitch two options simulated 2 layer, R inner =1.7cm 3 layer R inner =1.2 cm Still not final!

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Impact Parameter Resolution Adding Background: Resolution at low  degrades (however: software not yet tuned to low p) Occupancies: (initial lumi) ROccup % % %

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK DEPFET Collaboration HEPHY IEKP Karlsruhe

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Workpackages/Organization 1.1Parameter DefinitionMPP/HLLKRA, PRA 1.2DEPFET SensorMPP/HLL 1.3ASIC 1.3.1SwitcherHD 1.3.2DCDHD 1.3.3DHPBNMPP/HLL, UBA, USC, URL 1.3.4Data LinkBNMPP/HLL, UBA, USC, URL 1.4Module Design 1.4.1Sensor Ladder (& Interconnection)MPP/HLLHD, BN, IFV, CNM, IFB 1.4.2Kapton FlexKEKVIE, BN 1.4.3DHH (Data Handling Hybrid) 1.5Mechanical DesignMPIKA, VIE, KRA, IFV, IFB 1.6Thermal SimulationKAMPP, VIE, KRA, IVF, IFB 1.7System 1.7.1DAQGOEKRA, GIE, MPP, KEK, URL, HAW 1.7.2Power & Slow ControlKRAKEK, USC 1.7.3Cooling plantKEK

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Schedule

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Schedule Prototype Sensor Final Sensor ASICs Module Production Installation at KEK Ready: May 2013 Mechanics, Cooling

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Open Questions Radiation => improve on threshold voltage shift => dose, spectra, uniformity => optimal shielding => NIEL damage (particle type, spectra) Need to know beam pipe radius (outer!) => the smaller the better (for resolution)! => fix at latest mid 2010 (final sensor geometry) Need to know clearances and envelops at and around IP => mechanics, cooling, routing => temperature of the beam pipe Engineering of mechanics/interface to SVD => PXD should be mounted parallel to beam pipe => same mechanical structure as SVD? => common services (cooling)? DAQ interface (PXD may deliver up to 70 Gbit/s)

H.-G. Moser Max-Planck-Institut fuer Physik 1 st open meeting SuperBelle KEK Conclusions CAPs, SOI: very promising concepts status: basic R&D important upgrade path for highest luminosity! DEPFET: evolving from basic R&D towards production Sensors: one more prototype production in 2009 (convert from ILC to SuperBelle layout) final production in 2011 radiation hardness should be improved Electronics: prototypes under test (control, readout) digital readout chip in work System: work started Schedule: install in 2013 upgrade after ~5 years (radiation damage, occupancy, smaller beam pipe?) We propose DEPFET as baseline PXD for superBelle to be discussed in closed session