MG, YWB and CS 1 Alice Shift model for 2009 Shift model for the global subsytems (HLT,DCS,ECS,CTP,Offline) Shift model for the detector subsytems : MTR+MCH.

Slides:



Advertisements
Similar presentations
Time Management.
Advertisements

Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
Shift Move to ACR Shifts are taken solo since Aug. 1, 2010 – The shifter stays alone without anyone nearby from the late night though the.
Shift Blocks Preview takes into account discussion at Run Coordination Meeting of 2009/04/01 Prepared by C.Clement, B. Gorini M. Aleksa, A. Ciocio, S.
BEGIN THE FIRST DAY OF CLASS. Know what's expected of you Take notes from the first day even if it's routine stuff you think you already know. How to get.
Joint Staff School Committee Training. Why do we need a JSSC? Provide orderly and professional means of improving educational programs, conditions within.
CHINA-EU FORUM workshop 38a Beijing, 9-10 July 2010 Multi-dimensional protection of labour rights 6/2/20151.
Enterprise Business Processes and Reporting (IS 6214) MBS MIMAS 2010 / th December 2010 Fergal Carton Business Information Systems.
Period Run Coordinator Shift Guide Period Run Coordinator Shift Guide Updated on PRC Guide.
Adapted from Prof. Necula CS 169 Project Planning1 Project Planning.
CEP Welcome September 1, Matthew J. Koehler September 1, 2005CEP Cognition and Technology Who’s Who?  Team up with someone you don’t.
Slide 1 Debate In Negotiation The Four Phases of negotiation Phase One: how to prepare Phase Two: how to debate Phase Three: how to propose Phase Four:
University of British Columbia CPSC 111, Intro to Computation 2009W2: Jan-Apr 2010 Tamara Munzner 1 More Class Design Lecture 13, Wed Feb
Being a volunteer Homework Tutor Huntington Beach Library.
CPUC Residential Rate Rulemaking Workshop July 31, 2014 Best Practices and Lessons Learned TVP Marketing, Education and Outreach.
Slide 1 Debate In Negotiation The Four Phases of negotiation Phase One: how to prepare Phase Two: how to debate Phase Three: how to propose Phase Four:
Welcome to the Westmeade Elementary Library Library Media Specialist: Karen McIntyre Click on the Arrows to GO.
Next class session: Test 1 on all sections covered from Chapters 1 and 2 Remember: If you haven’t yet passed the Gateway Quiz, you need to review your.
Tools for Academic Success “How to handle school” 1.
How to Organize an Effective College Study Group
Step 6: Consult Fall/Winter Session Registration Instructions and Timetable ‘H’ indicates 0.5 credit ‘F’ section code indicates course takes place in First.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
Welcome to CS 115! Introduction to Programming. Class URL Please write this down!
Session 5 Select the best solution. Step #4: Select the best solution Once a variety of possible solutions have been identified the best solution should.
WELCOME TO UNIT 7 Customer Service MT 221 Marilyn Radu, Instructor.
An Overview Time to Start Our New Unit!. o Pencil/Supply Monitor o Each day you will make sure that your group has sharpened pencils, and any other supplies.
Glossary and Terms About College. Academic Credits Unit of measurement of a college or university gives to the student who fulfills course or subject.
Welcome 5 th Grade - Parents 1.Find your child’s homeroom teacher on the counter 2.Check off your child’s name. This will be your way of signing in. 3.Grab.
Chapter Eight Academic Survival Skills. Study Skills  For most students time is the greatest issue.  The first rule to follow is to allow two or three.
To place an online order with Red Runner go to:
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Running Start Making the right choice for you.. Running Start - What is It? A State program created to give qualified students the option to pursue their.
Welcome to CS 101! Introduction to Computers Spring 2015 This slide is based on Dr. Keen slides for CS101 day sections, with some modifications.
SPSU 1001 Hitchhiker’s Guide to SPSU Advising and Plan of Study Copyright © 2010 by Bob Brown.
Unit 2, cont. September 12 More HTML. Attributes Some tags are modifiable with attributes This changes the way a tag behaves Modifying a tag requires.
Facilitation Principles and Techniques. 2 The Inside Facilitator Authorized by the Project Champion Invites project team members Announces the facilitator.
Welcome to CS 115! Introduction to Programming. Class URL Write this down!
COURSE SELECTION PROCESS. Scheduling Presentation Overview Scheduling Process Recommendations for Core Course Levels Elective Course Selections Progression.
Quality Tools. Decision Tree When to use it Use it when making important or complex decisions, to identify the course of action that will give the best.
Welcome to The Virtual Learning Center!!. Virtual Learning Center Orientation.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Muon Shift Organization Outline Class 1 Atlas Control Room Shifts Booking Present Status + Experience+ Feedback Class 2 reminder A. Polini & Z. Yan May.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Time Blocking What would your business look like?.
Julie Johnson Vice President | Complete College America COMPLETE COLLEGE AMERICA STRUCTURED SCHEDULES Building Success Into Programs.
2011 Masterclasses Introduction Michael Hauschild - CERN, 28-Feb-2011, page 1 Masterclasses “Skills” Masterclasses “Skills” Some general comments based.
CS12230 Introduction to Programming Lecture 6-2 –Errors and Exceptions 1.
Olivier Callot 5 June 2007 Electronic Logbooks Why moving away from Atlog ? Proposed improved configuration Release schedule.
Physics 218 towards a set of guidelines. Why guidelines for 218 ?  This guidelines need to be created for several purposes: 1.to be as fair as possible.
ATLAS (Shift) Operations Documentation and Training 24 June 2013 S. Zimmermann, ATLAS Post-LS1 Operations Workshop 1 Stephanie Zimmermann.
Presentation on “Technology used by university student”
Training Schedule And Training Packages at Discounted Rates.
Control Room and Shift Operations: CMS Greg Rakness (CMS Deputy Run Coordinator) University of California, Los Angeles ATLAS Post-LS1 Operations Workshop.
Welcome to 2 nd Grade! Please find your child’s chair, have a seat and write a letter to them!
Blogs How to use the bog safely and secure? Create new username. Create a strong password to your account. Create the password to your uploaded files.
WELCOME TO MICRO ECONOMICS AB 224 Discussion of Syllabus and Expectations in the Class.
WELCOME TO MANAGERIAL ECONOMICS MT 445 Discussion of Syllabus and Expectations in the Class.
Internet Safety Professional Development Rob Girvin July 31, 2013.
First Day of Class Student Registration Guide Linking LaunchPad to Desire2Learn Spring 2016 First Day of Class.
Muon Piquet Training: General Informations March 8-th 2016.
P. Kuijer1 System run coordinator meeting
Draft of to institute heads
Basic Google Calendar in the Library
Welcome to CS 1010! Algorithmic Problem Solving.
Welcome to CS 1010! Algorithmic Problem Solving.
Welcome to CS 1010! Algorithmic Problem Solving.
Wellness Recovery Action Plan
HRT Human Resources Toolkit
Welcome to CS 1301! Principles of Programming I.
Fifth Year Orientation
Presentation transcript:

MG, YWB and CS 1 Alice Shift model for 2009 Shift model for the global subsytems (HLT,DCS,ECS,CTP,Offline) Shift model for the detector subsytems : MTR+MCH  each group responsible report the group opinion by

MG, YWB and CS 2 Shift model for the global subsytems (HLT,DCS,ECS,CTP,Offline) Presented by Paul Kuijer SRC meeting on Monday 19 th ( ) –the shift model (copied from Atlas) appears to be quite complicated and somehow not convenient for shifters from abroad (coming specially at CERN for shifts) –CERN rules applies (see next slide) to CERN users (by default they already complies with the French law) –After some exchange with Paul Kuijer (6/2/2009) : 6 days of work + 1,5 days of rest rule stands for everybody : CERN staff or external users the 5 days of work + 1,5 days of rest rule may concern Technical Staff at CERN like LHC operators but not shifters like us  have a look at Paul’s talk : no decisions taken yet and input is welcome

MG, YWB and CS 3 CERN rules Working hours –Standard working hours –Standard working days Mo-Fri –Working week 40 h –Working day 8 h –Night work between and Night/weekend/overtime compensated for CERN staff –Money or time with factor >1 Minimum rest time applies also to users: –CERN responsible for safety at work –12 h / day –111 h / week –1½ days after 6 days of work –6 days/month Work of physicists not classified as shift work –Free booking –Less strict rules than for CERN technical staff

MG, YWB and CS 4 ALICE model 1 ? extracted from ( P. Kuijer4SRC meeting MoTuWeThFrSaSuMoTuWeThFrSaSu AAABBCC AABBCCC AABBBCC Use ATLAS shift block scheme Training shifts difficult to schedule (Mo?) No advantage in booking early to avoid night shift Keep ALICE working hours: Night 00-08, Day 08-16, Evening Daily run planning meeting at Keep ALICE credit accounting system 8 h shift = 1 credit 24 h on call = ½ credit Sharing according to M&O-A Alternative: Book individual shifts Transfer of information more problematic Difficult to keep track who was on shift yesterday? Difficult to find people from outside CERn for fragmented periods Decision to be taken in February Comments to Jan and Paul before Feb 21! Morning Evening Night

MG, YWB and CS 5 ALICE model 2 ? proposition made by J.Rak at the ALICE-TB

MG, YWB and CS 6 Shift model for the detector subsytems : MTR+MCH Same model for MTR and MCH : would be wise to have a common shift model with ALICE model 2 seems to be more popular in the MUON community: –Block of 6days is the MAIN rule to comply with (as much as possible) –Keep in mind the CERN rules (especially : 1½ days after 6 days of work) and book your shifts accordingly. We (SRC) cannot verify everything! –Comments and new ideas are of course welcome

MG, YWB and CS 7 Shift model for the detector subsytems : MTR+MCH Some comments/questions for the ALICE coordination : –Muon prefers block of 6 days of shifts the possibility to book a single 8-hours shift should be kept in the ALICE SMS tool even if the rule is to book 6 consecutives shifts  the 6 day block should not be imposed by the SMS we’d like to have the same shift model as the ALICE global service (ECS, CTP, DCS)  what is the ALICE choice/preference ? –whatever the model (5 or 6 days), it seems preferable to not mix morning, afternoon and night shifts. –what rules will be for the on-call shifts ? will they be booked "8 hour by eight hour", day by day, etc.? will it be possible for someone who is on shift to be on call for the remaining 16 hours of the day ?  rules for on-call shift need to be clarified –are shift hours carved in stone ? 8am- 4pm, 4pm- 12 pm, 12 pm - 8 am

MG, YWB and CS 8 Shift model for the detector subsytems : MTR+MCH Some comments/questions for the ALICE coordination : –Shift booking “rush” versus night shifts People tend to avoid night shifts : rush to be the first to book to avoid night shifts.  why not a rule saying that 1/3 of the total number of shift per institute has to be night shift ?  could we increase the credit of night shifts ? 1 night shift = 1.5 day shift  modify the shift duration to shorten night shift ? 7h00 to 16h00, 16h00 to 0h00, 0h00 to 7h00 –…

MG, YWB and CS 9 Shift model for the detector subsytems : MTR+MCH Inside MUON : –make sure ZDC and MUON choice agree –6 days model could overlap with two weekend ; this is not the case with a 5 days model. But at the end, a 6 day model should have less “dead time” –Shift booking “rush” “ the shifts should be assigned by the detector run coordinators (it is already the case in the SMS [I don’t think it is true. Christophe] ), in coordination with the lab representatives and sub-project leaders, on the basis of declared availability and trying to normalize not only day/night/lab load but also competence on different items”  I (Christophe) disagree : SRC do not have to assign shift : this is why the SMS tool exists. Nevertheless rules should be defined to avoid the rush booking. In addition this solution can not work when the number of lab/ people is large…