MAST STORAGE RACK Philip Crist Max Carpenter Sean Ellis Gershom Obeng.

Slides:



Advertisements
Similar presentations
Structural Steel Construction
Advertisements

Team Members: Jon DixonMatt SacksDarrin BeamNathan Murray
Mast Storage Rack NNSY Sean Ellis, Philip Crist, Max Carpenter, Gershom Obeng.
Chapter 7 Column Design (Part 2). Shearson Lehman/American Express Information Services Center, New York City. (Courtesy of Owen Steel Company, Inc.)
Model RJ-3 System Package We offer a Res-Q-Jack™ Model RJ-3 3-point stabilization package system which includes: Qty. of (1) Jack Stand Kit with pins,
Parts of typical slab formwork
Commercial Framing C D Prints Unit 13.
Professor Joe Greene CSU, CHICO
Faculty Advisor: Dr. Han P. Bao Group Leader: Parker Harding Group Members: Christina Toroc Hunter Hughes Deborah C. McHugh.
FEA of Wind Turbine Tower Martin Knecht. The Problem FEA modeling of a wind turbine tower. Analysis: –Stress –Deflection Want to prevent –Yielding –Excessive.
Reinforced Concrete Flexural Members
Rolling Chassis Team Todd Anderson Matt Blackwood David Hovater Josh Smith Jessica Yoho.
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
Bending Moments A bending moment exists in a structural element when an external force is applied to the element so that the element bends (or wishes to.
Connections and Bracing Configurations
Moving Armor Target (MAT) Track Jacob Feist Cleon Stanley Thomas Hutton Sladana Lazic 03/30/2006.
CTC 422 Design of Steel Structures
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Hoop Tech Clamp Assembly and Attachment. Contents of package.
Team Flying Sheep Engineering Analysis Mark Berkobin John Nevin John Nott Christian Yaeger Michelle Rivero.
Pipe Supports and Restraints
Liquefied Natural Gas Fuel tank
10 Chapter Floor Framing. 10 Chapter Floor Framing.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Bridge Design Project Using SolidWorks and SolidWorks Simulation to design, test and build structures.
Feasibility MSA P Base Plate Feasibility 3 plastics were looked at for MSA mounting board material: ABS, Acrylic, and polypropylene. Due to cost.
Reinforced Concrete VS Steel
CM 197 Mechanics of Materials Chap 20: Connections
Structure Analysis of 6061-T651 Aluminum Bridge Team Blackboard Mechanical Engineering University of Rochester Team Blackboard Department of Mechanical.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
ME104Q PAPER RIVER CHASM BRIDGE Team Boomerang Mechanical Engineering University of Rochester Executive Summary The premise of this experiment is built.
Senior Design: Validation of Design December 15, 2008.
Home Work #4 Due Date: 18 Mar, 2010 (Turn in your assignment at the mail box of S581 outside the ME general office) The solutions must be written on A4.
ENGR 220 Section 13.1~13.2.
Chapter 19 Floors.
Vbine Energy Generator Assembly Pictures and Info Slide Show.
RPI Master’s Project Proposal Stephen Ganz – 5/15/2012 Structural Analysis of Bridge Gusset Plates: Steel vs. Composite.
APPENDIX A (RFI) FOR THE FABRICATION OF MULTIPLE STEEL REACTION STRUCTURES FOR NASA-MSFC STRUCTURAL TESTING Mike Roberts 12/2/09.
Front Suspension Greg Habiak, Nicole Simon, Joe Vuto.
Mechanical Engineering Analysis. Material Selection Process WoodStainless Steel HDPEAluminumPTFE Cost Machinability Strength Durability
NCSX Modular Coil Turning Fixture FDR. FDR Charge (answers were added below after the review) Modular Coil Turning Fixture FDR - Charge to Reviewers –The.
The Effects of Engineering Assumptions when Designing a Plate Panel/Stiffener System Under a Uniformly Distributed Load Bernard Nasser Master of Engineering.
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
Engineering 309: Machine Design I Instructor: Dr. Min Lu Presented by: Mike Kraft Thanh Nguyen.
Adaptation of Van with a Wheelchair Lifting System Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web Page Specialist.
NUMI Transmission Line (TL) Review: Design Details TL through Block & Beyond Design/Status Bill Boettinger FNAL April 23, 2003.
Redesign of the STOL CH 701 Landing Gear Strut
Sag of ZTF components Callahan 9/4/2014. Corrector Trim Plate analysis.
T HE CRUSHED E XPERIMENT By: Carlos Sanabria Justin Roose Phillip Munday.
HOME BUILDING PART 1 Floor Framing. Floor Frame  Now that you have a foundation, it’s time to build on it.  This type of construction is for stem-wall.
P13458: Dresser-Rand Compressor Assembly Line Team Members: Lauren Kraft –Project Manager, Nick Feng – IE Cole Bowden – ME, Shawn Moseley – ME Jordon Boggs.
Overview of New Practices & Policy Skewed Bridges.
Christina Toroc, Parker Harding, Caitlin McHugh, Hunter Hughes.
REVIEW LECTURE #1 KNOWLEDGE BASE REQUIRED: STRENGTH OF MATERIALS
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
TVAC Trolley Design Review1 GLAST LAT Project8 September 2005 TVAC Trolley Design Status Review 8 September 2005 TVAC Trolley Design Status Review 8 September.
Shear Stresses in Concrete Beams
A View of NCSX Structural System and Load Path for the Base Support Structure.
House Construction.
Status of report on chapter 6: Warm cryostat mechanical calculation PH-DT Engineering Office, CERN Page 1 CERN, May 20th 2015.
Structural Integrity UNDERSTAND STRUCTURAL STRENGTH OF LOAD BEARING COMPONENTS IN MECHANICAL SYSTEM.
Summary of Platform and Hilman Rollers Deformation Studies John Amann ILC Mechanical Engineering 7/11/07.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
PANDA Yoke of the Magnet
Tilt N’ Store Design Analysis
Stress Analysis of Universal Tilt Kit Attachment Points
Tilt N’ Store Design Analysis
Valve stem “gag” mechanism
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
KNOWLEDGE BASE REQUIRED:
Presentation transcript:

MAST STORAGE RACK Philip Crist Max Carpenter Sean Ellis Gershom Obeng

Current Progress 0 Met with shipyard right before break and finalized all requirements for design. 0 Finished preliminary Solidworks drawings 0 Created FEA models for cantilever deflection and simple beam analysis

Current Design 0 Durable frame constructed from I-beam steel 0 Rectangular base with I-beam supports bolted to the floor 0 Steel plate welded to base support beams 0 Vertical members welded with rigid L-brackets 0 Vertical members to attach various clamps 0 Bracing along vertical members 0 Drip pan to catch and drain residual oils 0 12’ x 12’ footprint 0 Weight requirement of approximately 10,000lbs

Empty Rack

Loaded Rack

Drain Pan

Clamp Assembly 0 Two machined pieces with approximate radius of masts 0 Three clamp diameters 0 3”, 6”, 14” D will accommodate all masts 0 Pieces can be bolted to vertical members and tightened down on the masts 0 Adjustable along vertical beam 0 2 clamps: 1 near bottom, 1 above midpoint

Clamp Assembly

FEA Simple Beam

FEA Model

Cantilever Beam

Analysis Data Base Stress (psi)Yield Strength (psi)Deflection (Inch) 1000 Ibs ,000NA 3000 Ibs ,000NA Vertical Members Stress (psi)Yield Strength (psi)Deflection (Inch) , Clamp Stress Yield Strength (psi) Factor of Safety 3/4 10-UNC , /2 13-UNC176836,

Updated Gantt Chart