JCOMM OCG ROUNDTABLE September 2015 JCOMM in-situ Observations Programme Support Centre.

Slides:



Advertisements
Similar presentations
AIC Report Argo TC AST #8 Paris, IOC of UNESCO. 2 Argo Status 2804 Active Floats 2643 on GTS 2743 at GDACs 115 (258) on “grey list”
Advertisements

Technopole Brest-IroiseJuin 2013 JCOMM in-situ Observations Programmes Support Centre Strategic move from Toulouse to Brest JCOMM in-situ Observations.
JCOMMOPS JCOMM Observing Program Support Centre M. Belbeoch JCOMM OCG IV/ Hobart, April 2011.
AST 16 March 2015 Deployment Opportunities Deployment Opportunities Update for AST 16 M. Kramp.
Risk Identification Chapter 6.
JCOMM in situ Observing Platform Support Centre JCOMMOPS
JCOMMOPS Operations & Development Technical Coordinators (H. Viola, M. Belbeoch) JCOMM OCG Geneva/WMO, April 2007.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
1 Business Area Report Richard Brown Business Area Director.
JCOMM Observing Programme Support Centre Activities, future directions and opportunities. JCOMM III, Nov. 2009, Marrakech Mathieu Belbeoch & Hester Viola.
Argo Information Centre Report M. Belbeoch, Argo TC AST #11, San Diego, USA March 2009
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 1 Technical seminar (WP0.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
University of North Dakota Office of Institutional Research November 8, 2013 Drivers get ready - new dashboards are coming your way! Presented at the.
Argo Information Centre Report M. Belbeoch, Argo TC ADMT #10, Toulouse, France September 2009.
Utilities Planning Group CIP Tracking System Jim Broome, PE Chief Engineer.
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
Argo & AIC Development Argo TC DBCP #22 La Jolla, California.
JCOMM Observations Programmes Support Centre 2013 Global Ocean Observing Systems Coordination by JCOMMOPS M. Belbeoch Global Ocean Observing Systems Coordination.
The next call FP Infrastructures-5. FP Infrastructures-5 Call outline (1) All fields of S&T are covered Publication date: 4 November 2004.
JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Argo Status Argo TC, M. Belbeoch.
JCOMM in-situ Observing Programme Support Centre SeaDataNet Technical Meeting II Paphos, Cyprus March 2012 Mathieu Belbeoch & Kelly Stroker.
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (1) JCOMM in situ Observing Platform Support Centre Most developments now achieved –Infrastructure in.
JCOMMOPS & Argo, DBCP, SOT, OceanSITES 2 nd GODAE Observing System Evaluation Workshop Toulouse, June 2009 Mathieu Belbeoch & Hester Viola.
JCOMMOPS in support of Global Ocean Observing Systems Mathieu Belbeoch USA, April 2012.
JCOMMOPS JCOMM Observing Program Support Centre Etienne Charpentier, WMO Secretariat M. Belbeoch, JCOMMOPS May 2011, MARCDAT-III.
JCOMM Observing Programme Support Centre International Coordination and Gliders EGO #4, Cyprus Yves Desaubies Mathieu Belbeoch Hester Viola.
JCOMM in situ Observing Platform Support Centre JCOMMOPS
JCOMMOPS JCOMM Observing Program Support Centre M. Belbeoch AST#13 Paris, March 2012.
The Data Buoy Cooperation Panel (DBCP) Joint Meeting of the International Program for Antarctic Buoys (IPAB) and the International Arctic Buoy Program.
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS David Meldrum, vice chair, JCOMM OPA.
IV-3.1 JCOMMOPS SOT Technical Coordinator. 2 JCOMMOPS structure Programmes currently supported –Ship Observations Team (30% Mathieu Belbeoch) –Argo Profiling.
JCOMMOPS JCOMM Observing Program Support Centre M. Belbeoch DBCP #27 September 2011 Geneva, Switzerland.
Top Down View of Estimation Test Managers Forum 25 th April 2007.
Deployment Opportunities M. Belbeoch DBCP #27 September 2011 Geneva, Switzerland.
ERCOT Financial Summary For the Month Ended September 30, 2005
Monitoring and management of ship logistics opportunities M. Belbeoch PMO IV December 2010 Orlando, USA.
Topics describe the Data Buoy Cooperation Panel (DBCP) –aims, –achievements and –Challenges network status developments of data buoy technology JCOMM.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
I-2.5 Report by the former SOT Technical Coordinator Hester Viola 1 May 2007 – 31 January 2009.
NMI End-to-End Diagnostic Advisory Group BoF Fall 2003 Internet2 Member Meeting.
DBCP 31 October 2015 Deployment Opportunities Deployment Opportunities Update for DBCP 31 JCOMMOPS.
IOC Assembly June 2015 JCOMM in-situ Observations Programme Support Centre.
IRSO 2015 October 2015 La Jolla, CA, USA IRSO 2015 Steve Diggs (CCHDO) on behalf of Martin Kramp, JCOMMOPS Ship Coordinator Update on JCOMMOPS Activities.
IATI – Version 2.02 Report to IATI Steering Committee – 3 December 2015.
OBSERVAL CONTRACT 25/01/2008 2/10/ Summary 2/10/ Agreement & its annexes First pre-financing payment Progress report 2 nd pre-financing payment.
JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015 Argo Status Argo TC, M. Belbeoch.
Page 1  Overview of Workstream plan – October Board.
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
JCOMM Observation Programmes Support Centre – Argo Information Centre November 2014 Argo Status Argo TC, M. Belbeoch.
JCOMM in-situ Observations Programmes Support Centre Paris, June 2012.
AST 17 March 2016 Deployment Opportunities Deployment Opportunities Update for AST 17 JCOMMOPS.
Copyright © 2007 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are trademarks of Accenture. October 24 th, 2007 CORE.
Status of the Global Ocean Observing System – April 2015 David Legler, Director Climate Obs Division NOAA Climate Program Office OOPC – April 2015 Sendai,
JCOMM in situ Observations Programme Support Centre 04 March 2016 Argo Status Argo TC, Mathieu Belbéoch.
JCOMM in-situ Observations Programme Support Centre
Project Office Progress Champika GALLAGE DBCP Coordinator/ OceanSITES Project Office OceanSITES th Steering Committee and.
Challenges facing Business & Finance:
Ship Coordination Issues
JCOMM in-situ Observations Programme Support Centre www. jcommops
JCOMM in-situ Observations Programme Support Centre www. jcommops
What is JCOMMOPS JCOMMOPS occupies a unique place as the focal point for the practical coordination of the in-situ ocean observing systems defined by JCOMM.
Candyce Clark JCOMM Observations Programme Area Coordinator
JCOMM III, Nov. 2009, Marrakech Mathieu Belbeoch & Hester Viola
JCOMM in-situ Observations Programme Support Centre www. jcommops
Challenges & opportunities for developping regional cooperation
JCOMM in-situ Observations Programme Support Centre www. jcommops
JCOMM in-situ Observations Programme Support Centre
Support for SOT Activities
Argo Information Centre & Argo Users
Presentation transcript:

JCOMM OCG ROUNDTABLE September 2015 JCOMM in-situ Observations Programme Support Centre

JCOMM OCG ROUNDTABLE September 2015 Infrastructure / Staff Full staff regrouped in Brest – Mathieu Belbéoch (FR) – Martin Kramp (GER) – Champika Gallage (CA) – Anthonin Lizé (FR) – Emanuela Rusciano (IT) One staff under contract in Toulouse (until October – to be continued Nov/Dec - if budget allows) – Thomas Latter (UK) Internships, students to be recruited late 2015 New TC for Regional/Coastal systems (mainly gliders) 2017

JCOMM OCG ROUNDTABLE September 2015 Infrastructure / Staff What proportion of staff time is available per programme? Dedicated staff time + infrastructure staff time Drivers: ToR & budget ToR: STAFF (%)ArgoDBCPOceanSITESSOTGO-SHIPJCOMMOPS MB7030 MK33 CG7030 AL100 ER100

JCOMM OCG ROUNDTABLE September 2015 Infrastructure / Staff Budget (2014 analysis) Driver to redistribute staff time with JCOMMOPS activities ContributionsArgoDBCPOceanSITESSOTGO-SHIP %

JCOMM OCG ROUNDTABLE September 2015 Infrastructure / Staff

JCOMM OCG ROUNDTABLE September 2015 Infrastructure 50% increase in staff time for Argo, DBCP 100% for OceanSITES, SOT, GOSHIP + some JCOMMOPS services (expenses)

JCOMM OCG ROUNDTABLE September 2015 Priorities Internal organization (weekly meetings, follow up on actions) Database (old - new ) Website finalisation and review (release Dec. 1st) Core deliverables (monthly/yearly reports to panels, steering and data teams) Cruise Information Centre Work on indicators and metrics All is linked …

JCOMM OCG ROUNDTABLE September 2015 Database status

JCOMM OCG ROUNDTABLE September 2015 Workplan / Priorities New database status – Work on DBCP metadata was more important than expected – Synchronisation with Meteo-France to be reviewed (Lead CG) Website review process – 20, 30 days per staff in the next two months Discuss ER workplan – Room for specific studies, audits Balance activities/priorities vs budget (e.g. OceanSITES) – Specific actions identified for OceanSITES – Suggestions ?

JCOMM OCG ROUNDTABLE September 2015 ER Workplan

JCOMM OCG ROUNDTABLE September 2015 Action Items

JCOMM OCG ROUNDTABLE September 2015 Action Items

JCOMM OCG ROUNDTABLE September 2015

JCOMM OCG ROUNDTABLE September

JCOMM OCG ROUNDTABLE September 2015

JCOMM OCG ROUNDTABLE September 2015

JCOMM OCG ROUNDTABLE September 2015

JCOMM OCG ROUNDTABLE September 2015 Website review process 4 axes: – External (ALTRAN company subcontracted) – Internal (TCs with programme perspective) – Community survey - key testers only – Community survey – larger audience September – October: review processes November: build on feebdack Dec. 1st launch

JCOMM OCG ROUNDTABLE September 2015 ALTRAN Survey tool (community) Testing tools Audit report (Performance, ergonomics) Bug tracking tool Scenarios follow up User manual (on-line help + videos)

JCOMM OCG ROUNDTABLE September 2015 Website review Contour of the review defined and common to all Elements to be tested by all – Generalities – Dashboard – Query, Grid, Register, Inspect – GIS viewer – Stats – Summary, Implementation, Data flow, Instrumentation (Indicators) General (static) information to be added gradually Metrics widget to be finalized once well defined by all panels

JCOMM OCG ROUNDTABLE September 2015 Ship Time Lady Amber (used by NASA for SPURS2 – ~400 days) No financial support for JCOMMOPS … Bullet proof solution with maritime operator rejected Needs ?

JCOMM OCG ROUNDTABLE September 2015 Thank you