FPI related schedule & Model Philosophy Based on spica_AIVT_revC, FPI_review_by_SDR_E Mar. 15 th, 2010 by H. Matsuhara, N. Takahashi, T. Nakagawa.

Slides:



Advertisements
Similar presentations
1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.
Advertisements

Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Ensure Vendor/Engineer of Choice Product Quality
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Solar Orbiter Payload Working Group Mid-term meeting November 2002, ESTEC 1. PDD Activities - Status of PDD inputs - Discussion of each instrument.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
STARLight PDR 3 Oct ‘01 G.1.1 Rashid STARLight STARLight Thermal Tahir Rashid STARLight Mechanical Engineer (734)
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Roadmap Name Strategic Roadmap #n Interim Report April 15, 2005.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
Andrea Santangelo, Kepler Center-Tü Toulouse, February 2, 2012 “The Organization of the EUSO- Balloon mission” Andrea Santangelo * Kepler Center for Astro.
Close Cycle Dilution for Space Ph. Camus, G. Vermeulen, G. Chaudhry, A. Benoit, F. Martin B-POL Workshop, IAP Paris, 29th July 2010.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
PRODUCT TRANSFER.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
CHINA’S PROJECTS PROPOSALS FOR SESSION 2 Sun Yang Department of International Cooperation National Energy Administration, China
CEOS Special Report on Data Applications Sep 16, 2014 JAXA.
Current Status of SPICA Focal Plane Instruments October 19, 2009 Hideo Matsuhara (ISAS/JAXA) & FPI team.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
Science - Coronal heating - Coronal structure / dynamics - Elementary processes in Magnetic Reconnection Mission instruments - Optical Telescope / Vector.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Supporting Industry Change Planning: Risk & Milestone Assessment Process & Tools 07/07/2014.
State Support System for Districts New Hampshire Department of Education.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
Oct.10, 2007EAMA7 The next-generation Infrared astronomy mission SPICA Outline of SPICA Scientific Research Concept (SciReC) SPICA 研究コンセプト概要 17 th May.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array FPGA Spectrometer.
Current Status of SPICA FPI Mechanical I/F & resources April 6 th 2010 Hideo Matsuhara (ISAS/JAXA) & FPI team.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
SPICA / AIV&T issues Spacecraft test program & model philosophy
Advanced Studies and Technology Preparation Division 1 SPICA Mission profile M class presentation Paris, 1 December 2009.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
Optical & Mechanical I/F between SAFARI and IOB Rev. A Mar. 12 th 2010 Hideo Matsuhara.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPICA FPI envelopes – current status 16 th April, 2010 Hideo Matsuhara On behalf of FPI team.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Dr.F. Arteche EMC DEPFET Project: A general overview.
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
CIS 170 MART Teaching Effectively/cis170mart.com FOR MORE CLASSES VISIT HCIS 410 AID Inspiring Minds/hcis410aid.com FOR MORE CLASSES.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Communication WG Summary Purpose To achieve Increased collaboration and cooperation between AD Groups/WPs/IK partners A common understanding and commitment.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Korea Aerospace Research Institute (KARI)
SPF MAG Quarterly Report – Feb 2015
Pre-landing Orbiter Observations
LAT Requirements Verification in TVAC
© The Aerospace Corporation 2008 Rationale for Selected MIL-STD-1540E Thermal Test Requirement John W. Welch The Aerospace Corporation TFAWS
MicroMegas Mechanical Meeting --- Cern April 2014
The DBD: Outline and Scope
Oregon Process Meeting February 15, 2013 Drew Hinds and Paula Merritt
Launch and On-orbit Checkout
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
SPICA / FPI Mechanical /Optical Issues
GLAST Large Area Telescope:
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Presentation transcript:

FPI related schedule & Model Philosophy Based on spica_AIVT_revC, FPI_review_by_SDR_E Mar. 15 th, 2010 by H. Matsuhara, N. Takahashi, T. Nakagawa

FPI REVIEW BY SDR FPI-Related Schedule in Short Term : Review process in Japan as well as International Level

SPICA Focal Plane SCI FPC-SFPC-G MIRACLE-long MIRACLE-Short 2300 mm

Review process of Japanese- lead instruments Japanese-lead instruments: – MIRACLE, MIRMES, MIRHES, SCI Instrument Proposals (including conceptual design report ) shall be submitted by the end of April, Review by a Japanese Board (Selection committee) – prioritize each proposal by July – prioritize the instrument specifications (not instrument as a whole) in each FPI, judging by their scientific values and the technical readiness, etc. – The Details of Review & Decision process will be discussed in the Task Force Meeting on 29 th March, 2010

Issues to be addressed in the review Consistency with the scientific targets described in the Mission Requirement Document Technical Feasibility Maturity of results from the concept study Consistency with the ICS-FPI (ICS-SAFARI, etc.) Identification of technical development risks, clear description of prescription against risks Propriety in the development plan, cost, & team organization

International Review of FPI Review in Japan 30 th Apr : due of Japanese-led instrument May-July: Review by a Japanese board ESA-JAXA Review Q2-Q3 FY2010: review for the focal plane instrument under an international Board / committee details need to be discussed / agreed “SAFARI Phase-A final study report” need to be reviewed also by ESA & JAXA, well before SDR Other Instruments US-lead instrument: review & selection process under discussion with NASA Korean-based instrument (FPC) also need to be reviewed (schedule under discussion)

“FPI Review process” Issues to be agreed Definition of ‘international (review) board/committee’ for the final FPI decision Authority, place in the project structure Policy of membership Review Policy – need to be agreed Judgment should be based on the achievement in the “Issues to be addressed” (see page 4) For Japanese-lead instrument, JAXA proposes to make selection based on the function/coverage of the instrument within SPICA and not on the individual instrument.

FPIA MODEL PHILOSOPHY & TEST SCHEDULE Necessary Models for the System Level Tests of the FPI Assembly

Key issues for FPI AIV&T FPI’s system-level test plan should take account of the critical issues as below: (a) FPI is cooled to <5K with J-T coolers under extremely careful Spacecraft thermal design. (b) disturbance and interference from J-T coolers and AOCS (such as RW, gyro) To assure high-sensitivity (low-noise) in orbit (c) Co-operation with FPC-G to establish the pointing stability Interferences? Alignment? (d) Co-focus among FPIs (especially MIR’s) Since STA 2ry cannot be adjusted so frequently in orbit

FPI Model philosophy Cold FPIs Minimum number of Models required for the system level test (in the previous page) is: FM (Flight Model) (& its spare) STM : structure thermal model CQM : cold qualification model Warm Electronics Similar as above, except for the terminology (CQM  PM (proto- model) A concern about SAFARI Warm Electronics STM : can the requested heat dissipation be simulated by a heater? Spacecraft DHS simulator(SpaceWire I/F) will be developed, and distributed hopefully before 2014 ( under discussion)

STM ( Structure Thermal Model) for FPIs Purposes Evaluate their mechanical (at ambient temp.) & thermal compliances at cold, in the system level (PLM or Spacecraft) Evaluate transfer function of mechanical disturbances originated from FPIs Required Function Same mechanical I/F specifications to FM Same thermal I/F specifications to FM Equipped with thermometers, acceleration sensors for measurement of I/F environmental condition Simulate mechanical disturbance according to the system operation modes Proposed Delivery Oct : before starting of assembly of PLM(STM) for the system Mechanical & Thermal Test

CQM (Cold Qualification Model) for FPIs Purposes Evaluate thermal compliance at cold with J-T(PM) cooler Evaluate susceptibility to mechanical disturbances from J-T (disturbance simulator) and AOCS simulator Evaluate electrical interferences among FPIs, J-T, AOCS Required Function Same thermal, mechanical, electrical I/F specifications to FM Equipped with detectors operable at low-temperature, with the same noise performance as that of FM Simulate heat-dissipation (load to J-Ts), mechanical disturbance according to the system operation modes Equipped with a optical image, to check the co-focus among FPIs Proposed Delivery Apr : when the PLM(FM) is available for us to test the items in page 2. Earlier delivery enables us to feedback for the design of FM

FM (Flight Model) for FPIs Purposes For on-orbit observations; for our scientific objectives, of course! After delivery and assembly to FPIA, FM will go to the “evaluation at cold” in the dedicated chamber for evaluation of interferences, co focus among FPIs Required Function Science Grade optical, noise, and sensitivity performances! Note that after the test called “FPI evaluation at cold”, long- wavelength channel detectors cannot be operated (even may not be switched on??) - so how to verify its health during the long waiting time before launch/cooling in orbit? Delivery date of FM: June 2016 (August 2016 at worst) in the proposed scenario.

SPICA AIV&T timeline (tentative) 14 Consistency need to be checked with Industries’ estimates !!

FPI: SPICA system test plan With STM: Mechanical Environmental test & thermal test at cold at the PLM level Mechanical Environmental test & Thermal balance test at Spacecraft level Measure disturbance at FPI from J-T cooler/AOCS With CQM: Cooling compliance test with J-T (PM) most important Evaluate susceptibility to mechanical disturbances from J-T (disturbance simulator) and AOCS simulator, Co-focus is also checked to some level at cold (tbd) Evaluate electrical interferences among FPIs, J-T, AOCS in the 1 st whole FM V&T in 2016 if FM is not available yet With FM FPI evaluation at cold (optical & electrical) STA optical performance test at cold Thermal test at cold at PLM level 15

PLM Thermal Test at cold (STM and FM) Purpose Evaluation of PLM cooling system performances Alignment measurement between STA and FPIA with FPC? Date & Duration STM: April 2013 FM: Dec. 2017, ~2months Method Additional shields in the existing 13m space chamber in Tsukuba Shields are externally lifted by mechanical coolers 16

IOB FPI LHe Mech. Cooler (commercial) FPI(CQM or FM) test config. in the 1 st Whole FM V&T 1Q-2Q FY2016, checkout with FM Bus Module Electronics before assembly/integration of FM Bus System 17

Summary Short-term schedule, esp. review process by SDR ESA – JAXA review in Q2-Q3 FY2010 should be discussed / agreed “SAFARI Phase-A final study report” need to be reviewed also by ESA & JAXA, well before SDR “The Review policy” need to be agreed FPI Model Philosophy Two models (STM, CQM) besides FM are proposed Proposed Delivery : Oct for STM Apr for CQM June 2016 for FM – does this meet the SAFARI schedule? Earlier Delivery of CQM benefits to the mature design of FM