Emerging Technologies Working Group Update to WMS September 02, 2015 1 Contents I.PVGR Forecasting Stats II.Distributed Generation Outflow Report III.Other.

Slides:



Advertisements
Similar presentations
03/11/2013 MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Overview of Market Rule revisions.
Advertisements

Emerging Technologies Working Group Discussion: AXRs September 24, Contents I.Ready or Not, Here They Come II.ALRs, the Camel’s Nose III.The Whys.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
DSWG Update to WMS May 17, DSWG Goals Update.
1 R : LTPP Track II Workshop – Operating Flexibility Modeling Results Patrick Young Analyst, Generation & Transmission Planning California Public.
1 Financial Mathematics Clicker review session, Final.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
ERCOT Load Forecast and Reserve Margin Update June 2, ERCOT Load Forecast and Reserve Margin Update June 2, 2005.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Wholesale Market Subcommittee Update Technical Advisory Committee March 7 th, 2013.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
Peak RCCo Performance Metrics Draft –November 2013.
RTWG Report to TAC August 5, 2010 Howard Daniels.
2014 Calendar Year Customer Survey Results. Background Open for comment February 12, 2015 through March 31, 2015 for evaluation of prior year – 21 close.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
Emerging Technologies Working Group Update to WMS March 05, Contents I.Update on NPRR 588 II.Solar Forecasting: Protocol Revisions Needed III.Solar.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
 Advanced Metering Working Group (AMWG) Update to RMS 1 August 5, 2014.
Bill Hellinghausen EDF Trading North America
Demand Integration Update to DSWG ERCOT Emergency Responsive Service (ERS) Report to the Public Utility Commission of Texas for the 2013 ERS Program Year.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.
Regulation Energy Management Overview CPUC Energy Storage Workshop March 9, 2011.
Prepared by Opinion Dynamics Corporation May 2004.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
MAPE Publication Neil McAndrews For Bob Ryan of Deutsche Bank.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC November 4 th, 2010.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
Emerging Technologies Working Group Update to WMS October 07, Contents I.Energy Storage, as discussed at ETWG II.Emerging Technology Tracking System,
The Wholesale Market Subcommittee Update Prepared for the September 25th TAC meeting.
1 UFE Workshop Sponsored by COPS October 19, 2004.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
ISO New England State of the Markets Report May April 2002 Robert Ethier, Ph.D. Manager, Market Monitoring and Mitigation ISO New England June 26,
Commercial Operations Sub-Committee Update to TAC April 4, 2008.
APAN P2P WG : Introduction Hyun-chul Kim KAIST (Wed)
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
PJM©2011 From Pilot to Production: Integrating New Storage Products in PJM Scott Baker PJM Interconnection ERCOT ETWG Storage Workshop December 2, 2011.
DSWG Update to WMS 12/2/2015. NPRR738 ERS Performance Calculations During TDSP Outages A utility outage can prevent ERS Generators from exporting to the.
1 Nodal Stabilization Market Call December 03, :30 PM.
Lead from the front Texas Nodal 1 Registration Data Update Aug 25, 2008.
1 WMS Report TO TAC April 2007 (which is in March)
Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
Load Participation in Nodal Training Session Update DSWG December 7, 2007.
College and Career Readiness Support Project Partner Update Meeting May 7, 2010.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
Energy Emergency Alert (EEA) UPDATE F EBRUARY 8, 2011.
1 Market Participant Default Joint Taskforce Update and Report on Recent Customer Transition Activity Report to WMS August 17, 2005.
Long Term Study Task Force Update Seeking Software Solutions: Analysis of Future System Operational Reliability Requirements.
Distributed Renewable Generation Profiling Methodology ERCOT Load Profiling March 4, 2008.
IRC Steering Committee Meeting July 30, Meeting Agenda I. Member update & budget II. Activities update III Deliverables IV IRC R&T Forum.
Update on NPRR615 PVGR Forecasting
CEO Report Thomas F. Schrader ERCOT Board of Directors May 17, 2005
CCWG September 29th Meeting
Existing Programs Stakeholder Group
Country presentation e-Learning Course on Good Agricultural Practice (GAP) for Greater Market Access.
Как да кандидатстваме по НИФ
Presentation transcript:

Emerging Technologies Working Group Update to WMS September 02, Contents I.PVGR Forecasting Stats II.Distributed Generation Outflow Report III.Other Business: Requested Energy Storage Update IV.Next ETWG Meeting

I. PVGR Forecasting Stats 2

Three Hour Ahead Company A STPVPF Company A PVGRPP Company B STPVPF Company B PVGRPP Average6.985%19.181%5.703%8.481% Under7.321%20.269%4.253%9.450% Over-6.691%-2.310%-6.516%-3.786% Count Under Count Over Max26.712%41.647%30.227%32.349% <102.52%1.56%0.66%0.68% 10<x<506.54%6.87%5.10%5.61% 50<x< %17.58%8.84%9.62% 100<6.87%29.64%5.23%10.94% 120<6.86%33.34%3.17%9.28% *Only forecasts where the real-time output above 0.5 MW were used. 3 Company B more accurate at high and low output.

Six Hour Ahead Company A STPVPF Company A PVGRPP Company B STPVPF Company B PVGRPP Average7.257%19.400%5.862%7.923% Under7.583%20.613%4.052%8.859% Over-6.950%-2.530%-6.802%-3.712% Count Under Count Over Max26.738%41.300%26.695%30.120% <102.71%1.75%0.68%0.65% 10<x<507.19%7.21%5.33%5.31% 50<x< %18.25%9.13%9.26% 100<6.83%29.50%5.31%10.00% 120<6.32%32.88%3.29%9.07% *Only forecasts where the real-time output above 0.5 MW were used. 4

Day Ahead Company A STPVPF Company A PVGRPP Company B STPVPF Company B PVGRPP Average7.281%19.684%5.671%8.043% Under7.370%20.873%4.204%8.845% Over-7.183%-3.113%-6.381%-4.117% Count Under Count Over Max25.620%41.086%29.690%32.773% <103.08%2.03%0.65%0.74% 10<x<507.23%7.11%4.74%5.87% 50<x< %18.10%8.63%9.91% 100<7.14%30.02%5.54%9.66% 120<7.26%33.80%3.06%9.78% *Only forecasts where the real-time output above 0.5 MW were used. 5

STPVPF Comparison Three Hour Six Hour Day Ahead Company A 6.985%7.257%7.281% Company B 5.703%5.862%5.671% 6 Three Hour Six Hour Day Ahead Company A 8.405%8.807%8.446% Company B 6.112%6.272%7.870% Hours Ending All Hours

Sunrise & Sunset Company ACompany B Sunrise: HE7 0.31%0.07% Sunset: HE %0.71% 7 *Three hour ahead

Bias The following numbers are the percentage of forecasts that were UNDER-FORECASTED. Company A STPVPF Company B STPVPF Company A PVGRPP Company B PVGRPP Three Hour43%34%94%78% Six Hour45%33%94%77% Day Ahead48%31%94%78% 8

Expected timeline for PVGRR forecast 9

II. Distributed Generation Outflow Report 10

11

12

13

14

III. Other Business: Requested Energy Storage Request 15 Some parties have expressed an interest in having ETWG do a “score-card” review of storage issues that have been addressed over the past few years, and those remaining to be addressed Lack of certainty expressed by some may indicate a need to update the ERCOT website under Grid Information | Emerging Technology Tracking System ETWG will welcome market participants that want to volunteer to present on these topics

IV. Next ETWG Meeting September 17 Logistics September 17, 1:00PM – 3:30PM Room 206B Note that this afternoon session follows the DSWG morning session Agenda Items Update on PVGR RFP Energy Storage Discussion? Other items as directed 16

APPENDICES 17

Requested WMS Motion n/a 18