FGS Alignment Results Presented for the STIS team by Linda Dressel TIPS - Nov 21, 2002.

Slides:



Advertisements
Similar presentations
FCMAT Response & Preparation: Process Outline October 25, 2006.
Advertisements

Steps to Successful Reporting Part 1
8D Corrective Action. 2 8D Problem Solving & Corrective Action: Initiate 8D Corrective Action D1 - Create Problem Solving Team D2 - Define the Problem.
Two-Gyro Performance: Scheduling and Acquisitions Merle Reinhart.
Stat 301 – Day 15 Comparing Groups. Statistical Inference Making statements about the “world” based on observing a sample of data, with an indication.
Overview of The Operations Research Modeling Approach.
Using the Hibernate Package for Caching MDSplus Data Student Ajith M Jose (u ) Supervisors Henry Gardner, Raju Karia.
Abstract Overall Algorithm Target Matching Error Checking: By comparing what we transform from Kinect Camera coordinate to robot coordinate with what we.
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Data Quality Tables.
UH-60A Airloads Wind Tunnel Data Update Tom Norman Airloads Workshop Feb 28 – Mar 1, 2013.
Responding to Inspection Findings
AMSC 6631 Sparse Solutions of Linear Systems of Equations and Sparse Modeling of Signals and Images: Midyear Report Alfredo Nava-Tudela John J. Benedetto,
Surgical Reprocessing (SRP) Performance Dashboard for Improved Service Team Members : John Rodriguez Jose Gonzalez Surgical Reprocessing Team Members Patricia.
Fine Guidance Sensor 2010 HST Calibration Work Shop Ed Nelan Barbara McArthur STScI.
Higher Computing Software Development. Software Development Process There are 7 main stages involved in developing a new software program: Analysis Design.
STIS Closeout Plan Paul Goudfrooij 2005 HST Calibration Workshop, 10/26/2005.
Time-Series Forecast Models EXAMPLE Monthly Sales ( in units ) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Data Point or (observation) MGMT E-5070.
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
CERN – Roberta Faggian Marque, Jan Fiete Grosse-Oetringhaus GRACE General Meeting, September 2004, Brussels 1 D6.1 Integration with the European DataGrid.
A new geometric distortion solution for the STIS NUV MAMA Jesús Maíz-Apellániz Leonardo Úbeda TIPS 17 July 2003.
20 October 2008LBT Q Eng/SW Review0 PCS – Pointing Control Subsystem Michele De La Peña.
Two-Gyro Science Impact and Observer Information Ken Sembach STUC Meeting 18-November November-2004.
DEVELOPMENT GATEWAY Solutions that empower. Government of Nepal.
FGS Astrometry in 2 Gyro Mode E. P. Nelan STScI B. E. McArthur McDonald Observatory, U. of Texas.
Making Improvements Improve Kaizen Facilitation. Objectives Identify characteristics of a Pilot Test / Run Describe 5 phases for a Pilot Test / Run 
03/000 Effect of the reference radiosource instability on the TRF solution Australian Government Geoscience Australia 4 th General IVS Meeting, 9-13, January,
Project Parkway Timeline to 2011 April 1, 2010 Town Hall Meeting Steering Committee Schools February 2009 May 18, 2009 Project Parkway Community Kick-
Using the Trapezoidal Model to Derate NW Hydro Capacity Resource Adequacy Technical Committee July 25, 2007 Portland, Oregon.
PMT time offset calibration (not completed) R.Sawada 27/Dec/2007.
T esting daily builds in an iterative development process Presentation at EuroSTAR 2003 Bjarne Månsson, KK Data Danmark.
CMGT 430 Week 5 Learning Team Enterprise Security Plan Paper Finalize and update your Enterprise Security Plan paper. Incorporate any instructor feedback.
Jan 2016 Solar Lunar Data.
STATISTICAL ORBIT DETERMINATION Coordinate Systems and Time Kalman Filtering ASEN 5070 LECTURE 21 10/16/09.
Taking Sights and Finding Ho, LHA and Dec
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Banner Project Update for Division Deans
Marketing Plan Enhancements: Phase 2 Distributor Presentation
Fix Yahoo Mail Error Code 475
Alienware Phone Number for quick help for solving the Problems. Dial the Alienware support Phone Number for Quick solutions for Dell.
Professional & Scientific Council Update
EXAMPLE 4 Check data for inverse variation
Annex 5: Milestones Action Determine sticker label design / features
Gyrochronology: Aging Nearby, Debris Disk Candidate Stars
Yearly Maintenance Process (for existing messages)
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Iowa College Aid Processing System (ICAPS)
Due Dates subject to change. Watch for dashboard updates.
Methods to Solving Systems of Equations
Welcome to CT1315 Project1 Latifa AlAbdlkarim King Saud University October,2009.

Time-Dependent Spectral Traces for the STIS First Order Modes
NDM Data Sample Analysis: Final Results (2)
DISSEMINATION WORKING GROUP Luxembourg, November 2011 Using Statistics Explained to produce the Eurostat Yearbook Jukka PIIRTO.
Energy Calibration with Compton Data

CS6020 Advanced Assembler Project
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Transmission Workstream DN Interruption Update - Introduction
Linear Transformations
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Types of Errors And Error Analysis.
Budget Planning Calendar
Student Assignment Review Advisory Committee
Presentation transcript:

FGS Alignment Results Presented for the STIS team by Linda Dressel TIPS - Nov 21, 2002

The Need for FGS Realignment FGS alignment updates were last made in Dec 1997 for FGS3 Oct 1998 for FGS1r Mar 2000 for FGS2r The FGSes undergo alignment shifts which are generally largest at installation, then decline with time. The alignment error in FGS2r was becoming large enough to cause numerous near-misses in STIS acquisitions.

Two-stage STIS acquisition: First attempt:Move and re-image:

Pointing errors for FGS1r dominant

Pointing errors for FGS2r dominant

Pointing errors for FGS3 dominant

FGS1r V2 error vs time ( – ) FGS1r V3 error vs time ( – )

FGS2r V2 error vs time ( – ) FGS2r V3 error vs time ( – )

FGS3 V2 error vs time ( – ) FGS3 V3 error vs time ( – )

The solution: realign FGS1r and FGS2r to FGS3 Caveat: The program used to compute the alignment corrections from FGS observations of a star cluster has instabilities.

Action: implement solutions that are in agreement with the STIS pointing analysis FGS1r and FGS2r were realigned relative to FGS3 on 20 October. Consistent solutions were obtained from data taken from 28 August to 7 October.

Predicted improvement in STIS pointing

Observed median V2, V3: -0.12”, +0.19” (+/-0.20”) Predicted median V2, V3: -0.15”, -0.04” (+/-0.17”) Difference: +0.03”, +0.23” (+/-0.27”) FGS1r

Observed median V2, V3: +0.10”, +0.01” (+/-0.20”) Predicted median V2, V3: -0.02”, -0.22” (+/-0.17”) Difference: +0.12”, +0.23” (+/-0.27) FGS2r

Observed median V2, V3: -0.36”, -0.07” (+/-0.20”) Predicted median V2, V3: -0.27”, -0.32” (+/-0.17”) Difference: -0.09”, +0.25” (+/-0.27”) FGS3

Final check: Tycho 2 coordinates

CONCLUSION: It worked!