17/1/07 F. Formenti PH-ED1 Competence domain (PH-ED) What field of expertise ED can provide?  System electronics design  1.Front-end detector electronics.

Slides:



Advertisements
Similar presentations
F. Formenti - ALICE forum 16/03/ Contacted some teams for system GND discussions: cases analyzed are presented here Planned to continue with others.
Advertisements

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
HEP2005, Lisboa July 05 Roberto Campagnolo - CERN 1 HEP2005 International Europhysics Conference on High Energy Physics ( Lisboa-Portugal,
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
The Past... DDL in ALICE DAQ The DDL project ( )  Collaboration of CERN, Wigner RCP, and Cerntech Ltd.  The major Hungarian engineering contribution.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
Paolo Rumerio, CERN On behalf of the CMS Electromagnetic Calorimeter Group CALOR 2006 Chicago, June 5 th – 9 th, 2006 Commissioning of the CMS Electromagnetic.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
The ALICE Silicon Pixel Detector Control system and Online Calibration tools Ivan Amos Calì (a,b) On behalf of the SPD Project in.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 – 17 September 2004, BOSTON, USA Carmen González Gutierrez.
1 Roger Rusack The University of Minnesota. Projects  Past Projects  11,000 channels of 0.8 Gbs for the CMS crystal calorimeter readout.  1,500 channels.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
GGT-Electronics System design Alexander Kluge CERN-PH/ED April 3, 2006.
The ALICE Electromagnetic Calorimeter
PANDA Muon Group Meeting, Protvino 7 June 2011 G
Possible contribution of Pisa on pixel electronics R&D
Large Area Endplate Prototype for the LC TPC
Børge Svane Nielsen/JJG
Mini-drawers, FE-ASIC , Integrator
SPD – ALICE DAQ/ECS/Trigger Integration Status Report
John Harvey CERN EP/LBC July 24, 2001
TPC Detector Control System
Commissioning of the ALICE-PHOS trigger
KICK OFF meeting - project presentation
Setup for testing LHCb Inner Tracker Modules
Pierluigi Paolucci & Giovanni Polese
SALTRO16 activities in Lund
The LHCb Front-end Electronics System Status and Future Development
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Presentation transcript:

17/1/07 F. Formenti PH-ED1 Competence domain (PH-ED) What field of expertise ED can provide?  System electronics design  1.Front-end detector electronics analog circuits, data conversion and digital front-end processing, chip design 2.Trigger electronics primitive extraction from detector data and trigger algorithms 3.Interface to data acquisition electronics serial links, data concentration, event formatting and buffering 4.Interface to controls custom and standard field busses for system configuration and monitoring 5.General electronics infrastructure power/gnd distribution, system interconnection, PCB/hybrid development, system integration 6.Stand alone r/o systems for test installations general purpose devices for unit characterization and system tests basic software routines for laboratory and test beams

17/1/07 F. Formenti PH-ED2 How ED contributes to experiments? Electronics support to ALICE and LHCb electronics coordination system architecture definition (specs from physics requirements, high level simulation) functional design coordination (collaboration within CERN or institutes, project management) system and device implementation device characterization and test (functional, perform. optimization and rad tolerance) mass production management, system integration and commissioning follow up for installation and operation support ALICE technical support until first full energy ion beam Future support to other activities as resources become available 1) contribution to projects for LHC experiment upgrading (e.g. Alice Pixels & TPC, LHCb Velo) 2a) R&D for future applications (pending approval by management, EUDET) 2b) participation to next common system developments Activity domain (PH-ED) Development & coordination Engineering Commissioning& operation Today here

17/1/07 F. Formenti PH-ED3 PH-ED structure F. Formenti (GL) L. Musa (SL) DTA sectionDTB section J. Christiansen (SL) A. Kluge R. Campagnolo (->2007) M. Burns (50% PRP) C. Soos (->¼ 2009) M. Morel A. Junique G. Aglieri Rinella (->12/2007) C. Gonzalez Gutierrez (->1/2008) C. Lippmann (->12/2008) G. Trampitsch (->11/2006) H. M. Franca Santos (->9/2008) A. Ur Rehman (->4/2007) K. Wyllie J. Morant (->¼ 2011) P. Stejskal (->10/2007) M. Muecke (->9/2006) P. Petrova (->5/2006) Cat 2 = 9 staff Cat 3 = 3 staff J. Buytaert J. Alozy (->8/2007) NOTE: Group structure evolved from past. Comparison with 1998: Cat 2 = 4 staff Cat 3 + Cat 4 = 10 staff Important to secure the present “trained” expertise.

17/1/07 F. Formenti PH-ED4 ALICE activities in detail (2006 and 2007) ALICE  Pixels detector electronics design: - MCM, FE Bus and extenders: production and qualification - Link receiver card and Router unit: development completion, production and test - Cables, optical fibers and patch panels: layout design and installation coordination - Temperature interlock system: design and implementation - SPD sectors and ½ barrel: qualification and integration in DSF, test with full acquisition/control systems - FastOR trigger system: specifications, design, construction, qualification and installation. - Coordination support for SPD integration over beam pipe, commissioning in final experiment location and support for operation  TPC detector: - FEC, RCU, readout and control backplane: production completion, test, installation and verification on TPC in clean room, RCU f/w upgrading - Electronics infrastructure: support for LV cabling, ethernet, DDL and TTC fibers, HV cabling, patch panels and FEE cooling - Installation of readout system: with FEC and standalone test system; with RCU readout, TTC crate and DCS; long term power ON tests - Commissioning coordination responsibility: study wire chamber and FEE performance with laser, pulser and cosmics (pedestal, zero suppression, high rates), DAQ/HLT integration test - Commissioning in final experiment position and support for operation: FEE calibration definition, optimal f/w and s/w setups for different run types, design of configuration database.  DAQ: - DDL and DRORC: production, installation and integration with subdetectors, trigger and DCS; staged installation, upgrade.  General ALICE electronics coordination. Total ALICE FTEs (% within category) Cat 24.8 (58%)5.0 (58%) Cat 32.0 (67%) Fell & Stud2.0 (31%)3.0 (60%)

17/1/07 F. Formenti PH-ED5 LHCb activities in detail (2006 and 2007) LHCb  RICH2 detector (Note: also requested support for RICH1 infrastructure) - Detector development support (anode and HPD): mass production qualification; integration with L0 card, LV and HV board and L1 card - LV, HV, signal cables, fiber optics and connectors: definition, production management, installation, test - Patch panels and connector adapter: design and installation - Power supplies: installation - Laser pulser board: design and installation - Maintenance and operation of 2 production qualification test systems for lab - General support for test beam, commissioning and first run.  VELO detector: - Repeater electronics and Analogue-Rx digitizer: support for design, production, test, installation and commissioning; support for test beams - TELL1: participation to algorithm definition for VELO; verification and completion of f/w design - FE kapton interconnect and cables: participation to specs, signal integrity tests, orders, installation - Temperature measurement board: design of f/w, support for qualification and installation - Central interlock: board development - Full detector: participation to assembly detectors, mechanics and services; running qualification tests - Commissioning and first run support.  TELL1 and Optical Pattern Generator (Note: finished in 2006 as the two students left): - Construction of a general purpose TELL1 evaluation system made by OPG, readout supervisor and s/w routines for simulation and verification - OPG h/w design, configuration and test s/w design.  General LHCb electronics coordination Total LHCb FTEs (% within category) Cat 23.2 (38%) Cat 31.0 (33%) Fell & Stud1.5 (24%)0.2 (4%)

17/1/07 F. Formenti PH-ED6 Other approved activities in detail  EUDET JRA2-TPC: - development of integrated readout system for LC TPC (micropattern gas detectors)  EUDET JRA1-Magnet: - development of modular acquisition system for magnetic field measurements  R&D on Gigatracker pixel detector for P326 - system design and coordination Other FTEs (% within category) Cat 20.3 (4%) Cat 30 (0%) Fell & Stud2.9 (45%)1.8 (36%)

17/1/07 F. Formenti PH-ED7 PHOTOS

17/1/07 F. Formenti PH-ED8 ALICE SPD FASTOR TRIGGER OPTIN LINK RX ROUTER MULTI CHIP MODULE LV & HV PS SYSTEM PIXEL BUS R/O AND TRIGGER HALF-BARREL EXTENDERS AND PATCH-PANELS

17/1/07 F. Formenti PH-ED9 ALICE TPC FRONT END CARD READOUT CONTROL UNIT W/ DDL SIU & DCS TPC SECTOR W/ FRONT END ELECTRONICS, CABLES & COOLING

17/1/07 F. Formenti PH-ED10 ALICE DAQ DETECTOR DATA LINK (DDL) SOURCE INTERFACE UNIT (SIU) D-RORC WITH 2 INTEGRATED DESTINATION INTERFACE UNITS (DIU)

17/1/07 F. Formenti PH-ED11 LHCb RICH HYBRID PHOTON DETECTOR, L0 BOARD, LV BOARD & HV DISTRIBUTOR BOARD RICH2 COLUMN

17/1/07 F. Formenti PH-ED12 LHCb VELO VELO MODULES INSIDE MECHANICS W/ SHORT CABLES BEETLE CHIPS & PITCH ADAPTERS LONG & SHORT CABLES REPEATER BOARD W/ REGULATORS & ECSTELL1 BOARD W/ A-RX, O-RX & GBE LINK