Ckov status David Lange, Doug Wright LLNL May 4, 2004.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Apr, 16, 2008.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
LAPPD status report. 6cm system status  System up and running since July –Temperature profile carefully mapped out in sealing and deposition chambers.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
BigBite Wire Chamber Test Xin Qian Duke University Feb 20th For TRANSVERSITY Collaboration Wire chamber Gas Cerenkov Shower system Scintillator Magnetic.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
Update on the new reconstruction software F. Noferini E. Fermi center INFN CNAF EEE Analysis Meeting - 14/09/20151.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
PDT’s  Control Board DSP Software (Sten,HH) u Updated so as to include the wire-length in the module data  Readout u All 6 crates in global run. u 90/94.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Peter-Bernd Otte - 8 th March 2010 CB collaboration meeting, Mainz.
Status of NA62 straw electronics Webs Covers Services Readout.
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
1 HCAL production, QC and preparation for installation Overview of the status report Rustem DZHELYADIN (IHEP, Protvino)  The general status.
First look at November 2008 data for EMEC module Maslennikov Alexei, Khoroshilov Andrey Budker Institute of Nuclear Physics, Novosibirsk Liquid Argon week,
Online Reconstruction 1M.Ellis - CM th October 2008.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Methods to reduce dead time and achieve higher trigger rate. Sparsification Event blocking Parallel DAQ systems SFI Sequencing.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
FLASH Collaboration Meeting: July 2003 Spectrograph Status Etc.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
AMS Software Review ACC DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
Presentation transcript:

Ckov status David Lange, Doug Wright LLNL May 4, 2004

Hardware status All PMTs installed, cabled, under HV for ~2 months now. –Recently increased HV to nominal running value: 2100V. No problems with HV. One remaining system: LED pulser. –Patch panel box on B. Jones’ desk – in line behind other MIPP work. Should be ready this week. Chamber filled with C02 –  /K/p radiatate at 40 GeV

CAMAC status Problems at time of last collaboration meeting now solved. –Seem to have robust branch highway to and between our crates. We do see problems most likely due to heat. –ADC/TDC modules don’t always give lams –Problems gone this week Added fans, cooler weather Much of DC electronics off Racks+crates no longer (very) hot to touch. –Need to monitor temperature near RR12 closely

“Online” software status CKOVDetector code written and debugged Code to decode raw data written and debugged. –In recent versions of MippIo/raw2root Online monitoring code recently committed –Mirror by mirror adc and tdc plots Cabling map in the database. Success using anamipp to make histos –Until rewrite of EventDataModel/IoModules etc. (Is it time for a ‘prelim bugs software mailing list so that fewer people independantly discover the same problem?)

Timing concerns.. TDC signals arrive ~240ns before gate from 2323 module: –Time for TDC signals from T00 ~ 110 ns –My understanding of trigger delays: 30ns T00 to trigger rack 150ns to leave trigger rack 90ns on cables to rack 10ns in 2323 (?) =280ns –Estimate off by 70ns … is 280ns verified?

Evidence of beam: One mirror on beam axis sees > pedestal in essentially all events. Evidence for hits > pedestal in most other mirrors. In process of evaluating how many do/don’t work properly.

Many TDCs work too Thresholds need to be lowered…

Gas : Crisis du jour C4F10 Saga: –Planned to wait ‘as long as possible’ to order gas given $$ issues. Vendor and rough quote in hand (3M) –In ~Feb found out that 3M stopped C4F10 production Terry quickly found new vendor but at 2x $. Planned delivery date = April 1 –Actual ~ April 20 –Whoops: vendor delivered the wrong gas.

C4F10 situation (II) Vendor looking at alternative suppliers –1 so far: another 3x $$ and 4 weeks –Also straightening out with 1 st vendor…. Terry looking at alternative vendors Looking again at gas alternatives –Not many if any that will have similar physics performance.

Conclusion PMTs look to be working Concerns: –Gas –Heat –Pulser system to be completed. –Need to think about event display.. –Current problems in io classes