Application of SIL assessment, Bow-tie and API 14C to ensure a thorough Safety Concept Prepared by: Fabienne Salimi & Tino Vande Capelle 26 January 2011.

Slides:



Advertisements
Similar presentations
BRYAN YOUNG Preventative Maintenance Working With Safety.
Advertisements

1 Safety Instrumented Systems ANGELA E. SUMMERS, PH.D., P.E. SIS-TECH Solutions, LLC We’re Proven-in-Use.
Annex I: Methods & Tools prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9 QUALITY.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Reliability Risk Assessment
12 April 2007Senior Design Lecture 3 – SP07 Senior Design Guest Lecture 3 Process Safety Applications For Design Engineers CHEN 4470 Spring 2007.
SAFETY-BARRIER DIAGRAMS FOR DOCUMENTING SAFETY OF HYDROGEN APPLICATIONS F. Markert and N.J. Duijm Systems Analysis Department, Risø National Laboratory,
HSE for Supervisors HEMP Module
Hazards Analysis & Risks Assessment By Sebastien A. Daleyden Vincent M. Goussen.
Quality Risk Management ICH Q9 Annex I: Methods & Tools
ADEPP Training Programs ADEPP Academy offers a unique and unrivalled online and on the job training packages delivered by experienced and qualified trainers,
DELIVERING SAFE & RELIABLE OPERATION
International Health and Safety at Work
Pipeline Qra Seminar Title slide Title slide.
Safety Management System Performance Based on Organizational Factors of “Seveso” sites Papadakis Georgios A., Kokkinos Konstantinos G. & Machaira Paschalia.
Hazard Identification
EuropeAid/131555/C/SER/RS Safety Procedures in the Chemical Industry Ernst SIMON, Styrian Regional Government, Austria Belgrade, December 2013.
Isograph Reliability Software RiskVu V3. Isograph Reliability Software ESSM – The first risk monitor ? Essential Systems Status Monitor Installed at Heysham.
Process Safety Incidents- Discussion of Hub Oil 1999 Accident
© Palaniappan R Kannan PMP.,CFSE 1 IEC Standard – What is it? IEC is a Standard for the functional safety of Electric / Electronic / Programmable.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
WHAT IS SYSTEM SAFETY? The field of safety analysis in which systems are evaluated using a number of different techniques to improve safety. There are.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS RISK ASSESSMENT Prepared by: Miss Hairul Nazirah Abdul Halim.
ERT 322 SAFETY AND LOSS PREVENTION RISK ASSESSMENT
DESIGNING FOR SAFETY CHAPTER 9. IMPORTANCE OF DESIGNING FOR SAFETY  In the near future, the level of safety that companies and industries achieve will.
Engineering Safety in Design Bo Hu John Nieber. Safety Damage from an unsafe process or product – A defective automobile brake system: Collision: driver,
Layers of Protection Analysis
RISK MANAGEMENT Copyright (c) 2011 FutureSoft ( 1.
Are You Ready for an SIS? What to do before starting on your SIS…and after it’s installed March 24, 2009.
SIPI61508 Soft computing based qualitative method for determination of SILs István Ajtonyi 1 – László Ormos 2 1 University of Miskolc, Institute of Electric.
A procedure for controlling risks 1 st step – to eliminate and identify hazards 2 nd step – to rank the risk associated with the hazards 3 rd step – to.
TUGAS K3 DALAM INDUSTRI KIMIA
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Hazard Identification & Safety Risk Management.  Hazard Identification and safety risk management (SRM) are the core process in the management of safety.
Process system and safety laboratory
Welcome to RISKNOWLOGY. Objective The objective of this presentation is to introduce you to The Risknowlogy Company We would like to show you Who we are,
Fault Tree Analysis for Fatality Prevention Dr. Steven A. Lapp President - Design Sciences, Inc.
About Us! Rob StockhamBA IEng MIEE General Manager Moore Industries-Europe, Inc MemberIEE Honorary Secretary ISA England Institute of Directors DirectorThe.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Risk Assessment: A Practical Guide to Assessing Operational Risk
Risk Assessment: A Practical Guide to Assessing Operational Risk
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
1.9. Safety assessment “School for Drafting Regulations on Radiation Safety, IAEA - Module 1 Regulatory framework for safety, authorization and inspection.
Author: Eng. Abdel-Razek Rashwan QHSE Senior Consultant CAE-Egypt Safety in Global.
Egyptian and Italian Cooperation Programme on Environment Quantitative Risk Assessment of Oil and Gas Plants Mr. Gaetano Battistella 1 Working Group n°.
Risk Assessment: A Practical Guide to Assessing Operational Risk
Introduction to Safety Engineering for Safety-Critical Systems Seo Ryong Koo Dept. of Nuclear and Quantum Engineering KAIST Lab. Seminar.
HSE Procedure for Risk Assessment Document Number: KOC.SA.018
Bowtie Analysis – An Effective Risk Management
Safety Instrumented Systems
Layers of Protection Analysis
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Safety Instrumented Systems
Quality Risk Management
Air Carrier Continuing Analysis and Surveillance System (CASS)
HSE Case: Risk Based Approach.
BU IS GIG Chemical, Oil & Gas
Quantitative Risk Assessment
II. 4 Quality risk management as part of…
Risk Assessments for Camps and Excursions
Reporting Incidents and Hazards Accident Prevention
Risk Management and Mitigation
HAZOP Guidewords Base Set
Layers of Protection Analysis
BHOPAL Industrial Disaster Management Cycle: OECD 2004.
Safety Analysis and Safety Functions
Hazards Analysis & Risks Assessment
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Project Risk Management Jiwei Ma
Review and comparison of the modeling approaches and risk analysis methods for complex ship system. Author: Sunil Basnet.
Presentation transcript:

Application of SIL assessment, Bow-tie and API 14C to ensure a thorough Safety Concept Prepared by: Fabienne Salimi & Tino Vande Capelle 26 January 2011

Technical Safety Design

Causes of incident identified by HSE (UK)

Safety Barrier Management Bow-Tie

Safety barrier hierarchy & effectiveness This figure shows that Systematic failures can be anywhere in the Life Cycle, therefore having the right systematic approach with the necessary verification, validation and assessment techniques in place under a proper Functional Safety management with competent people could be your only way forward.

API 14C: at least 2 Independent & diverse levels of protection

Bow-Tie Diagram, a Life Cycle approach

Hierarchy of Safety Barriers

None of the Safety Barriers is Perfect! New technologies Increase redundancy Shorten the period of test Risk based inspection and preventive maintenance Procedures (design, procurement, construction, commissioning, maintenance and operation) None of the safety barriers is perfect and 100% functional on demand.These flaws are eliminated, reduced or prevented by:

Semi-Quantitative Approach LOPA

Risk Reduction by Layers of Protection

LOPA & SIL assessment In this example fire from distillation column is considered as the “impact event” for both “loss of cooling” and “steam control failure” as independent scenarios without any interaction on each other.

Loops are in interaction! If in this LOPA the interaction between condenser cooling and reboiler heating systems are considered then severity for both cases will be ranked as “Catastrophic” with possible impact on the public safety and property damage. Therefore, the higher “SIF PFDs” for both loops are required.

Semi-Quantitative Approach Risk Graphs

Calibrated Risk Graphs & SIL Assessment

Is a SIL3 protection against gas ingress required? A 2oo3 Gas detection, logic and two dampers are required to achieve SIL3.

Exposure time and Probability to advert danger Probability of adverse wind direction Size of gas release Distance of source of fuel and release Fuel Inventory and duration of release Congestion of process area and natural ventilation between source of fuel and source of ignition F&G ESD for process area Blowdown facilities at process equipment Depending on the judgement of SIL assessment team for “exposure time” and “Possibility of avert danger” due to the following factors the SIL requirements for gas ingress protection cab be reduced to SIL1 or SIL2: A SIL2 gas ingress protection system is achievable with a 2oo3 gas detection, logic and one damper and is in line with the common practice in oil & gas industry.

Quantitative SIL assessment

Combination of Event & Fault Trees

HIPPS

F&G ESD

Common Cause & Systematic failures

Thank You for your Kind Attention!