SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion Accessories, Liner Hangers, Test tools, Chemical injection systems. 26 standards in revision / newly created, 4 published, 4 SR3s submitted Completion Equipment Documents – 14 A – SCSSVs - recently published 14 B – SSSV installation – ballot complete in resolution – publish Q L – SR3 submitted for next revision – HPHT requirements + updating 11 D1 – Packers and Bridge Plugs – Published 19 AC – Completion Accessories – adopt-back of ISO – ballot passed comment resolutions ongoing publish in Q3 2015, SR 3 on HPHT annex 19 SS – Sand Screens – adopt-back of ISO – ballot in Q LH – Liner Hangers – in process – estimate pre-ballot Q TT1 – Downhole Well Test Tools – ballot passed in comment resolution 19 V –Barrier valves- Published, TG inactive until review in OH – Openhole Isolation Equip. – New- draft at 30%, ballot Q CI – Chemical Injection Valves – New- draft at 15%, ballot date not set
SC 19 report to SC 18 June 2015 Gas-Lift Equipment Documents – Gas-Lift Handbook – replaces 7+ RPs – plan to publish in Early G1 – Side-pocket mandrels – SR3 was approved, TG assessing scope 19 G2 – Flow control devices – Ballot comment review underway, extensive 19 G3 – Run/pull/KOT/latches for SPM flow controllers, published 19 G4 – Practices used with SPM equipment, published 19 G5 – Operations Maintenance of GL - SR3 was approved, work progressing 19 G6 – Design of installations using IPO valves – 97% complete – initial ballot Q G9 - Design and Operation of Intermittent Gas-lift – Review 90% complete, ballot Q G10 – Dual gas-lift systems, comment resolutions underway 19G11 – Dynamic Simulation of Gas-Lift Wells and Systems –failed ballot, resolving comments 19G12 – Gas-lift Automation – 30% Complete ongoing, ballot Q G13– HP Gas-lift – 20% on hold 19 G14 – Liquid unloading of gas wells –05% on hold
SC19 report to SC18 June 2015 Perforating Documents – 19B – Perforators – Revising by section 19B1 – Evaluation in Concrete Targets – Ready for ballot 19B2 – Evaluation under stress – Released 19B3 – Evaluation at temperature – In Process 19B4 – Evaluation of Flow Performance – Revision complete 19B5 – Debris Evaluation – Draft complete 19B6 -- Gun Swell – Ready to publish RP67 – Explosive Safety – revising entire document (just beginning, divided in 11 Task Groups) Two SR3 documents approved at SC19 for CSOEM funding of testing, k k, to help establish accurate explosive hold times at elevated temperatures. SC 19 approved two SR3s for thermal decomposition testing of charges presented to CSOEM