SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.

Slides:



Advertisements
Similar presentations
ISO ESP Systems Task Group Leader, Shauna Noonan
Advertisements

SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
SC6 Ballot 1974: Adopt-back of ISO 10423:2009 as API 6A 20 th ed. Task Group Report on Resolution of Ballot Comments Eric Wehner 30 June 2010.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
Standards and Certification Training Module B – Process B5Consensus Process for Standards Development ASME S&C Training Module B5 Consensus Process for.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
1 API SC6 Winter Meeting Update on CSOEM MARG Activities Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
API 17 – Subsea HPHT Discussion HPHT Design Materials Design Performance Test 1 Design Methodology has been in review and development for 5+ years and.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
1 David Miller, PE, F.ASCE Director, Standards API ECS Reorganization Update.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Status of SAE FCV Safety Working Group Activities Developing Systems-level Performance- based Standards for Hydrogen and Fuel Cell Vehicles (FCVs) Presented.
API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
SC18 TG5 Development of a Guidance Document for the implementation of API Specification Q2 Objective Create a guidance document for users of the API Specification.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
Report to Enprotex David Matthews FIIRSM, GIOSH, RSP, OSHCR, DipSM UK Lead and Convener of TC94 SC14 WG1 General Requirements and WG2 Structural Firefighting.
API 11V Task Group 15 November, 2007 Houston, USA.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
1 Design Materials QC Validation HPHT Approach Why Needed? HPHT & Critical Applications – Defined by CFR for Surface Equipment as:  SITP at Wellhead of.
San Francisco, CA. SC8 Liaison Report
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 November 12, 2015.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
19th January 2012 Don Wells (Hess)
February 21, 2001TR CFR PART 68 – pre R&O Refers to the document published by the FCC Contains the following sub-parts –Subpart A –Subpart.
API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
Task Group Status January ,11, 2017
CEN/TC 12 and ISO TC67 SC4 Plenary meeting
TG Chair: Mark Brinsden Shell
Updates from SC18 Summer Meeting
API 14L Specification for Lock Mandrels and Landing Nipples
Task Group API 19SS Sand Screens
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
API RP 17A - Discussion Points
ISO Task Group Update Wayne Mabry.
API SC6 Valves and Wellhead Equipment
2016 Exploration & Production Standards Conference Subcommittee 10
API 16RCD June 2017 Specification for Rotating Control Devices – Update.
RAISING PERFORMANCE. TOGETHERTM
API SC-16 task group for Specification 16D
WG Technical Editor’s Report
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
WG Technical Editor’s Report
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Gas Lift Workshop – 2003 ISO Update
API SC 10 WG15 Stage Cementing Collars
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Sheung Li Task Group J Chairperson March 19, 2004
CHAIR - JIM BENNETT EXXONMOBIL
API SC6 Valves and Wellhead Equipment
Jim Raney, Director Engineering & Technology
Presentation transcript:

SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion Accessories, Liner Hangers, Test tools, Chemical injection systems. 26 standards in revision / newly created, 4 published, 4 SR3s submitted Completion Equipment Documents – 14 A – SCSSVs - recently published 14 B – SSSV installation – ballot complete in resolution – publish Q L – SR3 submitted for next revision – HPHT requirements + updating 11 D1 – Packers and Bridge Plugs – Published 19 AC – Completion Accessories – adopt-back of ISO – ballot passed comment resolutions ongoing publish in Q3 2015, SR 3 on HPHT annex 19 SS – Sand Screens – adopt-back of ISO – ballot in Q LH – Liner Hangers – in process – estimate pre-ballot Q TT1 – Downhole Well Test Tools – ballot passed in comment resolution 19 V –Barrier valves- Published, TG inactive until review in OH – Openhole Isolation Equip. – New- draft at 30%, ballot Q CI – Chemical Injection Valves – New- draft at 15%, ballot date not set

SC 19 report to SC 18 June 2015 Gas-Lift Equipment Documents – Gas-Lift Handbook – replaces 7+ RPs – plan to publish in Early G1 – Side-pocket mandrels – SR3 was approved, TG assessing scope 19 G2 – Flow control devices – Ballot comment review underway, extensive 19 G3 – Run/pull/KOT/latches for SPM flow controllers, published 19 G4 – Practices used with SPM equipment, published 19 G5 – Operations Maintenance of GL - SR3 was approved, work progressing 19 G6 – Design of installations using IPO valves – 97% complete – initial ballot Q G9 - Design and Operation of Intermittent Gas-lift – Review 90% complete, ballot Q G10 – Dual gas-lift systems, comment resolutions underway 19G11 – Dynamic Simulation of Gas-Lift Wells and Systems –failed ballot, resolving comments 19G12 – Gas-lift Automation – 30% Complete ongoing, ballot Q G13– HP Gas-lift – 20% on hold 19 G14 – Liquid unloading of gas wells –05% on hold

SC19 report to SC18 June 2015 Perforating Documents – 19B – Perforators – Revising by section 19B1 – Evaluation in Concrete Targets – Ready for ballot 19B2 – Evaluation under stress – Released 19B3 – Evaluation at temperature – In Process 19B4 – Evaluation of Flow Performance – Revision complete 19B5 – Debris Evaluation – Draft complete 19B6 -- Gun Swell – Ready to publish RP67 – Explosive Safety – revising entire document (just beginning, divided in 11 Task Groups) Two SR3 documents approved at SC19 for CSOEM funding of testing, k k, to help establish accurate explosive hold times at elevated temperatures. SC 19 approved two SR3s for thermal decomposition testing of charges presented to CSOEM